R o l l e r c o a s t e r   T y c o o n   2
                -~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-
                                  by CGorman
______________________________________________________________________________
                                   NOTICES                        
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
*1* - This is quite a long guide, so to find the section your looking for, you
should use Internet Explorers "Find" Facility. Press Ctrl + F and type in the
word you are looking for (e.g. Inverted Shuttle Coaster)

*2* - I have used € in this guide! However in the game €1 = $1 = £1! For other
countries see the currency section.

*3* - Prices may not be exactly right as costs fluctuate according to terrian.

*4* - For more information regarding the Roller Coasters in RCT2, check out my
coaster construction FAQ on Gamefaqs.


 /-------------------------------IMPORTANT-----------------------------------\
 |*5* - The golden rule in this game is to charge the excitement rating as   |
 |the addmission to each ride (e.g. exitement rating: 5.73, you charge €5.70)|
 \-------------------------------IMPORTANT-----------------------------------/

______________________________________________________________________________
                                  I. General                                  
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Game...........Rollercoaster Tycoon 2
Platform.......PC/Windows
Type...........FAQ/Strategy Guide
Completion.....100%
Version........Final
Author.........CGorman
First Updated..4th Jan 2003
Last Update....4th July 2004
Email..........cgorman03@hotmail.com (see Contact Notice)
CRP............http://www.gamefaqs.com/features/recognition/15853.html

(C) Ciaran Gorman 2002 & 2003 & 2004 (See Copyright)
______________________________________________________________________________
                             II. Table of Contents                            
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
 1.0 - Introduction
 2.0 - Strategy Guides (Beginner Parks)
 3.0 - Strategy Guides (Challenging Parks)
 4.0 - Strategy Guides (Expert Parks)
 5.0 - Strategy Guides (Real Parks)
 6.0 - Strategy Guides (Other Parks)
 7.0 - Rollercoasters
 8.0 - Other Rides
 9.0 - Shops/Stalls
10.0 - General Tips/Hints
11.0 - Finance
12.0 - The Last Words
___________________
1.0 - Introduction: 
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
      I   - General
      II  - Table of Contents
_______________________________________
2.0 - Strategy Guides (Beginner Parks): 
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
      (A) - Crazy Castle
      (B) - Electric Fields
      (C) - Factory Capers
__________________________________________
3.0 - Strategy Guides (Challenging Parks):
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
      (A) - Amity Airfield
      (B) - Botany Breakers
      (C) - Bumbly Bazaar
      (D) - Dusty Greens
      (E) - Fungus Woods
      (F) - Gravity Gardens
      (G) - Infernal Views
_____________________________________
4.0...Strategy Guides (Expert Parks):
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
      (A) - Alpine Adventures
      (B) - Extreme Heights
      (C) - Ghost Town
      (D) - Lucky Lake
      (F) - Rainbow Summit
___________________________________
5.0...Strategy Guides (Real Parks):
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
      (A) - Six Flags Belgium
      (B) - Six Flags Great Adventure
      (C) - Six Flags Holland
      (D) - Six Flags Magic Mountain
      (E) - Six Flags over Texas
____________________________________
6.0...Strategy Guides (Other Parks):
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
      (A) - Build your own Six Flags Belgium
      (B) - Build your own Six Flags Great Adventure
      (C) - Build your own Six Flags Holland
      (D) - Build your own Six Flags Magic Mountain
      (E) - Build your own Six Flags over Texas
_____________________
7.0...Rollercoasters: 
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
      (A1) - Air Powered Vertical Coaster
      (A2) - Bobsleigh Coaster
      (A3) - Compact Inverted Coaster
      (B1) - Corkscrew Roller Coaster
      (B2) - Floorless Roller Coaster
      (B3) - Flying Roller Coaster
      (C1) - Flying Turns
      (C2) - Giga Coaster
      (C3) - Heartline Twister Roller Coaster
      (D1) - Hypercoaster
      (D2) - Inverted Harpin Coaster
      (D3) - Inverted Impluse Coaster
      (E1) - Inverted Roller Coaster
      (E2) - Inverted Shuttle Coaster
      (E3) - Inverted Vertical Coaster
      (F1) - Junior Roller Coaster
      (F2) - LIM Launched Roller Coaster
      (F3) - Lay-down Roller Coaster
      (G1) - Looping Roller Coaster
      (G2) - Mine Ride
      (G3) - Mine Train Coaster
      (H1) - Mini Roller Coaster
      (H2) - Mini Suspended Coaster
      (H3) - Mini Suspended Flying Coaster
      (I1) - Motorbike Races
      (I2) - Multi-Dimension Roller Coaster
      (I3) - Reverse Freefall Coaster
      (J1) - Reverser Roller Coaster
      (J2) - Side-Friction Roller Coaster
      (J3) - Soap Box Derby
      (K1) - Spinning Wild Mouse
      (K2) - Sprial Roller Coaster
      (K3) - Stand-up Roller Coaster
      (L1) - Stand-up Twister Coaster
      (L2) - Steeplechase
      (L3) - Suspended Swinging Coaster
      (M1) - Twister Roller Coaster
      (M2) - Vertical Drop Roller Coaster
      (M3) - Virgina Reel
      (N1) - Water Coaster
      (N2) - Wild Mouse Coaster
      (N3) - Wooden Roller Coaster
      (O1) - Wooden Wild Mine Ride
      (O2) - Wooden Wild Mouse
__________________
8.0...Other Rides:
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
      (A1) - 3D Cinema
      (A2) - Boat Hire
      (A3) - Bumper Cars  
      (B1) - Chairlift 
      (B2) - Chesire Cats     
      (B3) - Circus Show  
      (C1) - Crooked House   
      (C2) - Cycle Railway 
      (C3) - Double-Deck Observation Tower
      (D1) - Elevator  
      (D2) - Enterprise     
      (D3) - Ferris Wheel 
      (E1) - Flying Saucers 
      (E2) - Ghost Train  
      (E3) - Go Karts     
      (F1) - Haunted House   
      (F2) - Haunted Mansion 
      (F3) - Hedge Maze  
      (G1) - Jet Skis   
      (G2) - Log Flume   
      (G3) - Merry-Go-Round
      (H1) - Mini Cars  
      (H2) - Mini Golf   
      (H3) - Mini Helicopters    
      (I1) - Minituare Railway  
      (I2) - Monorail   
      (I3) - Monster Trucks    
      (J1) - Motion Simulator    
      (J2) - Observation Tower 
      (J3) - Raft Ride
      (K1) - River Rapids 
      (K2) - River Ride 
      (K3) - Roto Drop   
      (L1) - Snow Cups   
      (L2) - Space Rings   
      (L3) - Spiral Slide 
      (M1) - Suspended Monorail
      (M2) - Swinging Inverted Ship 
      (M3) - Swinging Ship   
      (N1) - Tram Ride 
      (N2) - Water Coaster
      (N3) - Water Slide  
___________________
9.0 - Shops/Stalls:
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
      (A1) - Balloon Stall
      (A2) - Beef Noodle Stall
      (A3) - Burger Bar
      (B1) - Candy Apple Stall
      (B2) - Cash Machine
      (B3) - Chicken Nuggets Stall
      (C1) - Coffee Shop
      (C2) - Cookie Shop
      (C3) - Cotton Candy Stall
      (D1) - Donut Shop
      (D2) - Drink Stall
      (D3) - First Aid Station
      (E1) - Fried Chicken Stall
      (E2) - Fried Rice Noodles Stall
      (F1) - Fries Stall
      (F2) - Fruity Ices Stall
      (F3) - Funnel Cake Shop
      (G1) - Hat Stall
      (G2) - Hot Chocolate Stall
      (G3) - Hot Dog Stall
      (H1) - Ice Cream Cone Stall
      (H2) - Iced Tea Stall
      (H3) - Information Kiosk
      (I1) - Lemonade Stall
      (I2) - Meatball Soup Stall
      (I3) - Pizza Stall
      (J1) - Popcorn Stall
      (J2) - Pretzel Stall
      (J3) - Restroom
      (K1) - Restroom 2
      (K2) - Roast Sausage Stall
      (K3) - Seafood Stall
      (L1) - Souvenir Stall
      (L2) - Soybean Milk Stall
      (L3) - Star Fruit Drink Stall
      (M1) - Sub Sandwich Stall
      (M2) - Sujongkwa Stall
      (M3) - Sunglasses Stall
      (N1) - T-Shirt Stall
      (N2) - Wonton Soup Stall
__________________________
10.0 - General Tips/Hints:
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
      (A) - Staff Organisation
      (B) - Queues
      (C) - Adding Excitment to Rides
      (D) - Q&A (technical questions & general)
      (E) - Reader Contributions
      (F) - Websites/Links
      (G) - Rest in Series
      (H) - Cheats/Easter Eggs
      (I) - Park Awards
      (J) - Term Dictionary/Information
_______________
11.0 - Finance:
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
      (A) - Balancing your Budget
      (B) - Currencys
______________________
12.0 - The Last Words:
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
      (A) - Version History
      (B) - Full Copyright
      (C) - Contact Notice
      (D) - Credits
      (E) - Outro
______________________________________________________________________________
                                2-A Crazy Castle
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Task......................You have inherited a large castle - your job 
                                is to convert it into a small theme park. 
Objectives......................To have at least 1,500 guests in your park at
                                the end of October, Year 4, with a park rating
                                of at least 600.
Initial Guests in Park..........2
Initial Rating..................500
Park Size.......................690,800 sq.ft
Initial Cash....................€10,000
Initial Debt....................€10,000 
Debt Rate.......................at 5% per year
Initial Company Value...........€14
Initial Park Value..............€14
Buy Land........................Yes - at €75 per square
Buy Construction Rights.........No
Profit System...................Free to enter, Pay for Rides
Rides Already Built.............None

o Crazy Castle is a fairly easy park. The main thing to remember is to keep
  the theme of a castle - don't go off building space themed rocket coasters
  - that is a waste of time.

o To start, build a few (2 or 3) gentle rides. Make sure to spread them evenly
  around the park. There is no need to theme them with castle themeing until
  year two or three because a) you can't afford it, b) your guest numbers are
  low, and c) your time is not worth it.

o Next thing, build a medium sized roller coaster inside the walls of the
  castle (medium intensity). Make sure the excitement rating is fairly high
  because you will always charge it as the entrance fee (e.g. excite. rate.
  5.78, you charge €5.80).

o Next build another rollercoaster outside the walls of the castle to again
  create a good source of income.

o Don't be afraid to borrow - your aim is guest figures, not low debt figures.
  Use some of your extra cash from debt to finance big rides such as log 
  flumes. Spread these big rides throughtout the park and build lots of little
  rides around them. These major rides attract guests and create profit, the 
  little rides create money and distract guests from the big rides (so queues 
  stay shorter).

o Make sure to build the big rides FIRST and base the small rides around them 
  - not the other way round, because it is easier to move small rides than big
  ones.

o Hire plenty of staff, again guest attraction and satisfaction are more 
  important than long term cashflow stability.

o Make sure to build a few shops and stalls - again spread them out, food 
  courts lock nice, but only work (make money) with over a thousned guests or
  so. 

o When you have several rides you can do a bit of themeing around those 
  smaller rides. Also do up your queues and paths because guest satisfaction
  comes first.

o Your advertising and marketing spending should be kept high from early Year
  3. You must be aiming to have 1,000 guests or more by the end of Year 3 if 
  you want to succeed in this level.

o Continue rapid expansion of big rides and advertising till the end. If you
  are struggling to get the 1,500 guests by the end of Year 4, cut ride
  entrance fees and boost your park rating (that attracts guests) by hiring 
  lots of staff.
______________________________________________________________________________
                              2-B Electric Fields
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Task......................You have inherited a small farm and your 
                                challenge is to build it into a small theme
                                park amongst the fields and farm buildings.
Objectives......................To have at least 700 guests in your park by 
                                the end of October Year 2 with a park rating 
                                of 600.
Initial Guests in Park..........40
Initial Rating..................434
Park Size.......................485,650 sq.ft
Initial Cash....................€10,000
Initial Debt....................€10,000 
Debt Rate.......................at 5% per year
Initial Company Value...........€7,930
Initial Park Value..............€7,930
Buy Land........................No
Buy Construction Rights.........No
Profit System...................Free to enter, Pay for Rides
Rides Already Built.............Rowing Boats 1

o Ok this park is rather underdeveloped - theres only one ride - so in the 
  first few months concentrate on rapidly building rides to bring up guest 
  numbers - don't be too concerned about profit and cash levels.

o First thing to do is to raise the ticket price of Rowing Boats 1 to €2.20
  (its excitement rating) then build a few (at least 2) small/medium 
  rollercoasters and one large one - spend at least €12,000 on these coasters.

o Make sure to place a Information Kiosk at the entrance to generate revenue
  from map sales.

o Build some thrill rides around the rollercoasters - this prevents 
  rollercoaster queues from getting too long and also generates lots of money.

o Stick to pre-designed rides and rollercoasters - you don't have time to 
  waste designing fancy track layouts - and you don't have the money either!

o Build a few food and drink stalls scattered throughout the park. They are 
  unlikely to make money until Year 2, but they will keep the guests happy 
  which is your main objective on this particular level. Similerly build 
  plenty of toilets and other aminities such as cash-machines and first aid
  rooms.

o Keep building right throught the game - the bigger the park - the more 
  guests you will attract. Even small rides will boost your park - however
  save up every now and then for a new 'Mega' attraction - one that will 
  attract guests just for it.

o Spend most of your income on new rides and keep borrowing, but don't neglect
  hiring staff such as entertainers - guest satisfaction is worth more than a 
  second merry-go-round and also spend a large amount on advertising and park
  promotion - use the marketing option to offer 'free rides' all the time on 
  your best rollercoasters and keep your advertising campaigns running year 
  round.

o Remember your primary objective - guests numbers and satisfaction - bad 
  paths, little staff, no food etc., deters and angers guests - new rides, 
  straight paths, interesting foods please and attract guests.
______________________________________________________________________________
                               2-C Factory Capers
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Task......................An abandoned factory complex is an opportunity
                                to build a mechanical-themed amusement park. 
Objectives......................To have at least 1,100 guests in your park by
                                October Year 3 and achieve a park rating of 
                                600.
Initial Guests in Park..........0
Initial Rating..................0
Park Size.......................527,890 sq.ft
Initial Cash....................€10,000
Initial Debt....................€10,000 
Debt Rate.......................at 5% per year
Initial Company Value...........€0
Initial Park Value..............€0
Buy Land........................No
Buy Construction Rights.........No
Profit System...................Pay to enter, Free rides
Rides Already Built.............None

o Start off by building a few major rollercoasters (borrow €5,000-€6,000 if 
  you need to) - like the previous two parks, your aim is guests not money

o You have more time this time so you can afford to design rides and your
  path routes (keep paths simple). You can afford to build an extensive
  transport system which will generate lots of cash for park expanision.

o There is no need to spend heavily on marketing for the first two years - 
  concentrate on attracting guests by good rides not good adverts.

o Since you have more time, you can afford to develop the factory theme in
  the park, however don't spend too much over a couple of thousend to develop
  your themeing because your money is better spent on rides.

o Fill the park with thrill rides and rollercoasters - gentle rides will 
  generally look out of place in this park.

o In the finally year you can start to market the park a bit more if your
  guest numbers are falling short.
______________________________________________________________________________
                               3-A Amity Airfield
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Task......................Build a flying-themed amusement park in this
                                abandoned airfield.
Objectives......................To have at least 3,000 guests in your park by 
                                the end of October Year 4 and your park rating
                                must be at least 600.
Initial Guests in Park..........0
Initial Rating..................0
Park Size.......................1,235,630 sq.ft
Initial Cash....................€10,000
Initial Debt....................€10,000
Debt Rate.......................at 10% per year
Initial Company Value...........€0
Initial Park Value..............€0
Buy Land........................No
Buy Construction Rights.........No
Profit System...................Free to enter, Pay for Rides
Rides Already Built.............None

o This is a large park, so you can spread your rides out and think big. Build
  a few large rollercoasters to start - borrow a few thousned.

o A good transport system is needed in this park - to both help guests and rob
  them of there free cash! Build a few stations if possible.

o Since this level is fairly long (4 years), it is worth looking and minding 
  the finances early on. In the first few parks I told you to expand at all 
  costs to attract guests - the money was'nt going to be a problem - well now
  it will be because you have to finance the park for a much longer period.

o Repay your loan (or keep it low) because an interest rate of 10% is costly
  (€15,000 loan = interest of €6,000 over 4 years) - maybe aim to knock a
  thousned off every three months. However if you really need the money, don't
  hesitate in borrowing.

o No need to start marketing the park till the end of year 2 because new rides
  alone will attract plenty of guests early on.

o Don't forget to build shops and stalls, because like I said money can be 
  difficult in this level and shops and stalls generate cash flow.

o Build a few information Kiosks because like I said this is a big park and
  guests will get lost.
______________________________________________________________________________
                              3-B Botany Breakers
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Task......................Your challenge is to build a high-profit park
                                on this paradise island.
Objectives......................To achieve a ticket income of €10,000 per
                                month.      
Initial Guests in Park..........0
Initial Rating..................0
Park Size.......................548,240 sq.ft
Initial Cash....................€10,000
Initial Debt....................€10,000
Debt Rate.......................at 10% per year
Initial Company Value...........€0
Initial Park Value..............€0
Buy Land........................No
Buy Construction Rights.........No
Profit System...................Free to enter, Pay for Rides
Rides Already Built.............None

o Unlike the earlier levels your STATED aim is not guest numbers or happiness,
  but profit - however don't work towards profit - it will only come if you 
  can build guest numbers.

o The terrain in this park is tough to build on and expensive. Build two very
  good rollercoasters in the center of the island to start and link them to 
  the path. For the next year just build thrill rides and gentle rides because
  as you will see rollercoaster construction is very very expensive - so those
  first two better be good!

o Concentrate on rides with high excitement ratings and short ride times
  because you can charge most for these and get through lots of people. When
  your building a custom-desiged rollercoaster or other such ride make sure
  to select the highest number of cars, trains, boats etc possible for that
  ride because the more capacity - the more paying guests you can have per
  hour on that ride.

o Althought the aim is ticket sales, shop sales won't make you any poorer! 
  Make sure to build enough to keep guests happy (but not to many, they cost
  money to build)

o Invest every single euro in new rides - not fancy themeing, fancy path 
  layouts or redisigning old rides - the simple fact is you cannot clear this
  park with just 10 or 11 rides (well not very easily) you need 20, 30 or 
  more!

o Don't advertise - need rides will do that for you. Also keep staff numbers
  low (except mecanics... so no entertainers, only a few security gaurds and
  handymen and plenty of mecanics.)
______________________________________________________________________________
                                3-C Bumbly Bazaar
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Task......................Starting with a small market bazaar, your 
                                challenge is to increase the profit from shops
                                and stalls by building rides and 
                                rollercoasters to attract coustomers.
Objectives......................To achieve a stall income of €1,000 per month.
Initial Guests in Park..........41
Initial Rating..................467
Park Size.......................1,013,100 sq.ft.
Initial Cash....................€10,000
Initial Debt....................€10,000
Debt Rate.......................at 10% per year
Buy Land........................No
Buy Construction Rights.........No
Profit System...................Free to enter, Pay for Rides
Rides Already Built.............None only shops

o Again unlike the last few parks you have a new objective - stall income. 
  Like I said about Botany Breakers, don't worry about the objective -
  concentrate on guest numbers - 500 guests spending €0.75 each on average is 
  not as good as 1,500 guests spending €0.50 each on average - so build rides
  and market the park early on instead of new shops.

o Spread out your stalls through-out the park to maximise sales. Also don't
  keep building the same stall and have 'Sunglasses Stall 1'...2...and 3, 
  build different stalls throughout the park - the same person will buy a hat,
  glasses, a map and a souvenior - not 4 pairs of glasses.

o Foodcourts only work after guest numbers have reached about 2,000
______________________________________________________________________________
                                3-D Dusty Greens
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Task......................Situated near a highway junction in the 
                                desert, Dusty Greens is an opportunity to 
                                develop a small golf course into a thriving 
                                theme park.
Objectives......................To achieve a ticket income of €5,000 per 
                                month.
Initial Guests in Park..........79
Initial Rating..................605
Park Size.......................219,120 sq.ft.
Initial Cash....................€10,000
Initial Debt....................€10,000
Debt Rate.......................at 10% per year
Initial Company Value...........€7,933
Initial Park Value..............€7,933
Buy Land........................Yes
Buy Construction Rights.........Yes
Profit System...................Free to enter, Pay for Rides
Rides Already Built.............Mini Golf 1
                                Mini Golf 2

o Firstly demolish both Mini Golfs and build rollercoasters in their place -
  how many mini golfs have you met so far that match a rollercoasters 
  profitability? 

o After those 2 rollercoasters only build small thrill rides and gentle rides
  or (very small rollercoasters such as wild mouses) because space is at a 
  premium.

o The ideal ride has a high excitement rating ( = high addmission price) and a
  short duration (more guests per hour) - such as wild mouses and thrill rides
  such as launched freefall. 

o After a year or two check to see what your most profitably ride is (other 
  than the two rollercoasters) - then build one the exact same as it at the
  other side of the park.
______________________________________________________________________________
                                3-E Fungus Woods
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Task......................Restricted to only older-style wooden rides, 
                                your challenge is to build a thriving theme
                                park in Fungus woods.
Objectives......................To have at least 2,500 guest in your park by 
                                the end of October Year 4 with a park rating 
                                of at least 600.
Initial Guests in Park..........24
Initial Rating..................309
Park Size.......................523,380 sq.ft.
Initial Cash....................€10,000
Initial Debt....................€10,000
Debt Rate.......................at 10% per year
Initial Company Value...........€6,638
Initial Park Value..............€6,638
Buy Land........................No
Buy Construction Rights.........No
Profit System...................Pay to enter, Free for Rides
Rides Already Built.............Merry-Go-Round 1

o Firstly build a few (at least 2) good wooden rollercoasters - these will
  attract guests to the park and keep several hundred happy at any given time
  (in a park without ride addmissions income and a guest no. objective - the
  fewer expensive running-cost rides the better). Think of it this way your
  objective is to entertain (or atleast occupy) your 2,500 guests all at the
  same time - which way is best - 30 small rides costing €46.90 each to run
  or 7 large ones costing €150 each to run. My calculator says the 7 large 
  ones.

o Market your big rides heavily - your aim is guest numbers. Also hire plenty
  of staff, guest happiness is important.

o Cut your research budget, you won't need and can't build many of the new
  rollercoasters - so theres no point spending money to discover them.
______________________________________________________________________________
                              3-F Gravity Gardens
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Task......................Your challenge is to build a roller coaster 
                                park in the beautiful Gravity Gardens - No 
                                other rides, just Roller Coasters.
Objectives......................To achieve a park value of at least €500,000
                                and repay your loan.
Initial Guests in Park..........117
Initial Rating..................776
Park Size.......................1,676,400 sq.ft
Initial Cash....................€10,000
Initial Debt....................€10,000
Debt Rate.......................at 8% per year
Initial Company Value...........€45,082
Initial Park Value..............€45,082
Buy Land........................No
Buy Construction Rights.........No
Profit System...................Pay to enter, Free for Rides
Rides Already Built............."Treetop Flyer" (Wooden Roller Coaster)

o  This is a really great park. You have no time limit, and a hugh amount of
   space. The landscape offers many opportunities to build interesting roller
   coasters. Unfortuatly you are ONLY allowed to build Roller Coasters. 

o  Start by borrowing the maximum loan of €45,000 and building a substantial
   roller coaster that has been pre-designed - preferably a corkscrew or 
   twister. 

o  Immidiatly add another two slightly smaller roller coasters. Make sure to
   spread your roller coasters out through the park, this will eliminate 
   Guests leaving the park quickly or refusing to pay a large entrance fee.

o  You now have 4 roller coasters in opperation, so perhaps increase the
   entrance fee to €15 or €20.

o  Depending on how intense your coasters are, guests will start to complain
   about the paths being disgusting. Add plenty of benchs and bins outside 
   ride exits and hire a few Handymen. Also hire one/two security gaurds, 
   an entertainer and two/three mechanics - a roller coaster park needs 
   plenty of mechanics.

o  Income will slowly start to climb up - €2,000, €3,000, €4,000. However as
   visiter numbers cross 500 and eventually 1,000, you should add an 
   information kisok near the entrance to supplement your income. Also start
   building tolits across the park - charge 20c entrance for each.

o  The next problem will be the complaints "I'm Thirsty" - note NOT "I'm 
   hungry." So start building a few Wanton Soap Stalls, Drinks Stalls, Hot 
   Chocolates Stalls, Iced Tea Stalls and Lemonade Stalls throughout the park.

o  To start pulling in the big money you will need to increase your entrance 
   fee to over €50 - but people will only pay this if you can offer plenty of
   rides. But to build rides you need money. So firstly start advertising the
   park, raise the entrance fee to €25 and start building a few smallish
   roller coasters - Wooden Wild Mouse, Wild Mouse, Junior Roller Coaster,
   Mini Roller Coaster etc. As your number of Roller Coasters increases, 
   slowly raise your entrance fee in line with coasters, as you hit about 
   10-12 coasters you can rise to €50.

o  As your income tops out at €10,000 a month, start adding food stalls and
   gift stalls throughout the park. This will hopefully add another €750 to
   the bottom line. 

o  Start to market yourself even more aggresively and continue building new
   roller coasters - 1 per month at a cost of perhaps €9-€15k each. 

o  There is no need to pay off your debt for the moment before you ask. It
   does not decrease your park value.

o  Build an ATM beside your entrance and main food areas, this is because when
   your entrance fee hits €60, people start running out of money.

o  Continue the building until you hit a park value of €500,000 then start
   paying off your death.
______________________________________________________________________________
                              3-G Infernal Views
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Task......................A park nestled percariously on lava rock with
                                streams of magma.
Objectives......................To have at least 10 different rollercoasters 
                                with excitement ratings of at least 6.00
Initial Guests in Park..........67
Initial Rating..................459
Park Size.......................1,257,960 sq.ft.
Initial Cash....................€10,000
Initial Debt....................€10,000
Debt Rate.......................at 10% per year
Initial Company Value...........€43,039
Initial Park Value..............€43,039
Buy Land........................No
Buy Construction Rights.........No
Profit System...................Free to enter, Pay for Rides
Rides Already Built.............Wooden Roller Coaster 1

o Aim to build at least 3 rollercoasters a year (if not more) over excitment
  rating 6.00. 

o Don't waste time on rollercoasters under 6.00. You have'nt the money or time
  to spare.

o Just because your objective is rollercoasters, don't ignore thrill/gentle
  rides - they can produce the revenue to pay for expensive rollercoasters.

o Don't custom design the coasters if possible - a) you cannot predict if they
  will have a high enough excitement rating or not, b) it is more expensive to
  custom design rides, and c) it is time consuming.

o The simplist way to complete your task is to build the 10 cheapest pre-made
  rollercoasters over excitement rating 6.00.

o Don't forget you've a park to run! Devot at least 30% of your time to 
  managing money, staff, attracting guests and solving problems.
______________________________________________________________________________
                              4-A Alpine Adventures
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Task......................Convert a small mountain ski resort into a
                                snow-themed amusemant park.
Objectives......................To achieve a ticket income of €7,000 per 
                                month.     
Initial Guests in Park..........13
Initial Rating..................250
Park Size.......................1,034,660 sq.ft.
Initial Cash....................€10,000
Initial Debt....................€10,000
Debt Rate.......................at 8% per year
Initial Company Value...........€84
Initial Park Value..............€84
Buy Land........................No
Buy Construction Rights.........No
Profit System...................Free to enter, Pay for Rides
Rides Already Built.............Chairlift 1

o Firstly up the ticket price of Chairlifts 1 to reflect its excitement 
  rating.

o Ignore the idea of a "snow themed" park, just build lots of high profit 
  rides - don't waste time themeing your park.

o The terrain is tricky to build on snd you don't want expensive high supports
  - so when building rollercoasters, custom design them - the premade ones 
  will be very expensive due to high supports.

o Build plenty of thrill rides with high excitement ratings - not low 
  excitement gentle rides because the higher the rating - the higher the ride
  income.

o Borrow only to finance the major rollercoasters - not small rides, small 
  rides should be paid for by cashflow.

o Hire plenty of mechanics - you want all your rides running at all times to
  keep making money.

o Advertise to boost guest numbers - the more guests the more money you can
  make.

o After you've built a good few rides, go to your older rides and check the
  ticket price equals the excitement ratings because as more rides are built
  around one another - their ratings increase - and if you can boost ticket 
  prices by 10c each your overall ride income will dramatically increase.
______________________________________________________________________________
                              4-B Extreme Heights
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Task......................Free of financal restrictions, your challenge 
                                is to expand this desert park to attract 
                                people seeking the ultimate thrill.
Objectives......................To have at least 4,500 guests in your park and
                                to keep the park rating above 700.     
Initial Guests in Park..........165
Initial Rating..................780
Park Size.......................2,328,810 sq.ft.
Buy Land........................No
Buy Construction Rights.........No
Notable point...................No Money/Unlimited Funds park
Profit System...................Free to enter, Free for Rides

o This park is very easy because you don't have to manage money - however you
  must keep ratings above 700 at ALL times - this is hard enough.

o Firstly hire plenty of staff - entertainers, handymen, mechanics and 
  security gaurds. Also start laying straight forward paths and building
  plenty of toilets, stalls and first aid rooms. These will keep your task
  of keeping the park ratin above 700 easy.

o Build, build, build all sorts of rides - thrill rides, water rides, gentle
  rides and rollercoasters - you want to attract all sorts of people.

o Build plenty of exciting rollercoasters to attract guests. Build toilets,
  benchs, bins and first aid rooms at all intense ride exits to keep vomit 
  levels low on the streets.

o Theme your park to increase your park rating.

o Aim to achieve a park rating of 999 - if you aim and fall short - you will
  still have a high enough rating to win - set your sights high always to win
  - be ambitious.
______________________________________________________________________________
                                 4-C Ghost Town
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Task......................Hired by a large amusement park chain, your
                                task is build a giant rollercoaster park 
                                around an abandoned mine.
Objectives......................To have 10 different types of rollercoasters
                                with minimum lengths of 3,937 feet and 
                                excitement ratings of 7 and over.
Initial Guests in Park..........0
Initial Rating..................0
Park Size.......................510,310 sq.ft.
Initial Cash....................€10,000
Initial Debt....................€10,000
Debt Rate.......................at 7% per year
Initial Company Value...........€0
Initial Park Value..............€0
Buy Land........................No
Buy Construction Rights.........No
Profit System...................Free to enter, Pay for Rides
Rides Already Built.............None

o It would be nice to build a nicely themed park with wooden rollercoasters
  and western theming - but that takes time. The quickest route to success is
  building plenty of pre-designed new rollercoasters.

o As I said earlier don't waste your time on any coaster under 7.00 excitement
  rating because thats a waste of money and time. Also don't build any coustom
  rollercoasters - because if you fail to get the 7 rating then it proves a 
  massive waste of time and money.

o You need plenty of money to pay for your rollercoasters - so get guest 
  numbers up - but ignore your ratings because guests will spend the same 
  whether your rating is 500 or 900.

o The interest rate is fair enough - so take advantage of it to borrow plenty
  of money to build rollercoasters.

o A few high excitement thrill rides will generate important cash for new 
  rollercoasters. However don't spend to long building these.
______________________________________________________________________________
                                 4-D Lucky Lake
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Task......................With unlimited funds but a challenging lake
                                location, to expand and manage
Objectives......................To have 2,100 guests and a park rating above 
                                700 at all times.
Initial Guests in Park..........129
Initial Rating..................751
Park Size.......................662,310 sq.ft.
Buy Land........................No
Buy Construction Rights.........No
Notable point...................No Money/Unlimited Funds park
Profit System...................Free to enter, Free for Rides
Rides Already Built.............Mine-Train-Twister 1
                                Merry-Go-Round 1
                                Twist 1

o This park is again very easy because you don't have to manage money - 
  however again you must keep ratings above 700 at ALL times.

o Hire plenty of staff - entertainers, handymen, mechanics and 
  security gaurds. Lay straight forward paths across the lake that are easy 
  for guests to navigate. Build plenty of toilets, stalls and first aid 
  rooms to keep the park rating above 700.

o Build a few thrill rides and gentle early to keep guests occupied until
  you can build a few major rollercoasters.

o Build plenty of massive rollercoasters to attract guests. Build toilets,
  benchs, bins and first aid rooms at all intense ride exits to keep vomit 
  levels low on the streets.

o Build a transport network to make park navigation easier for guests.
______________________________________________________________________________
                               4-E Rainbow Summit
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Task......................Build on a hillside, this park is forbiddin 
                                from building anything tall. Can you expand 
                                the park and make it successful?
Objectives......................To have at least 2,500 guest in your park at 
                                the end of October Year 4 and the park rating
                                must be at least 600.
Initial Guests in Park..........286
Initial Rating..................768
Park Size.......................1,234,420 sq.ft.
Initial Cash....................€10,000
Initial Debt....................€10,000
Debt Rate.......................at 5% per year
Initial Company Value...........€80,315
Initial Park Value..............€80,315
Buy Land........................No
Buy Construction Rights.........No
Profit System...................Pay to enter, Free for Rides
Rides Already Built.............Chairlift 1
                                Trams 1
                                Wooden Rollercoaster 1

o Borrow plenty to finance rollercoasters (all coustom made due to the height
  restriction) - the interest rate is very cheap at 5%.

o Build plenty of thrill rides and gentle rides because they are easy to build
  and meet the height restriction.

o Since the range of rides you can (easily) build is low - theme your park to 
  attract guests.

o Build rollercoasters beside one another to boost their individual excitement
  rating. 

o Gradually raise the entrance price - maybe by €15 every year - however don't
  go over €60ish because some guests don't bring anything over €60 and thus
  must turn around and go home.
______________________________________________________________________________
                               5-A Six Flags Belgium
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Task......................Try your hand at running and improving this 
                                Six Flags Park
Objectives......................To have at least 3,500 guest in your park at 
                                the end of October Year 4 and the park rating
                                must be at least 600.
Initial Guests in Park..........1592
Initial Rating..................999
Park Size.......................1,137,950 sq.ft.
Initial Cash....................€10,000
Initial Debt....................€10,000
Debt Rate.......................at 7% per year
Initial Company Value...........€372,048
Initial Park Value..............€372,048
Buy Land........................Yes
Buy Construction Rights.........No
Profit System...................Pay to enter, Free for Rides
Rides Already Built.............Calamity Mine 
                                Cheshire Cats 1
                                Cobra
                                Enterprise 1
                                Flash Back
                                Ferry's Wheel
                                Loup-Garou
                                Magic Carpet 1
                                Merry-Go-Round 1
                                Pirate Ship 1
                                Radja River
                                Six Flags Express
                                The Screamer
                                Tornado
                                Turbine
                                Twist 1
                                Vampire
                                Vintage Cars 1

o This level is more about running and managing than expanding your park. So
  instead of building loads of new rides, spend your time and money marketing,
  hiring staff and managing money.

o Keep the entrance fee as low as possible to attract guests - your aim is 
  guest numbers not money.

o You can build a few rides - not many - but make sure to theme them nicely so
  they merge well with the park. 

o Listen to guest complaints such as those about hunger, thrist and lack of
  toilets - remember the park rating is important.

o Hire plenty of staff to keep things running smoothly.
______________________________________________________________________________
                         5-B Six Flags Great Adventure
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Task......................Build the missing Six Flags rides, or create
                                your own to improve the park! But don't forget 
                                your ultimate aim - to attract more guests to
                                the park.
Objectives......................To have at least 3,000 guest in your park and 
                                the park rating must'nt drop below 700.
Initial Guests in Park..........1931
Initial Rating..................896
Park Size.......................2,020,590 sq.ft.
Initial Cash....................€10,000
Initial Debt....................€10,000
Debt Rate.......................at 10% per year
Initial Company Value...........€426,027
Initial Park Value..............€426,027
Buy Land........................No
Buy Construction Rights.........No
Profit System...................Pay to enter, Free for Rides
Rides Already Built.............Big Wheel
                                Blackbeards Lost Treasure Train
                                Buccaneer
                                Carousel
                                Congo Rapids
                                Go Karts 1
                                Great American Scream Machine
                                Medusa
                                Nitro
                                Rolling Thunder [Track 1]
                                Rolling Thunder [Track 2]
                                Runaway Mine Train
                                Skull Mountain
                                Skyride 1
                                Skyride 2
                                Space Shuttle
                                The Twister

o Again this level is more about running and managing than expanding your 
  park. So only build a few rides each year.

o Assign mechanics to specific rollercoasters - breakdowns will cause chaos
  in this level.

o Keep entrance costs low to keep guest numbers up. Also build plenty of 
  toilets, stalls etc., to keep guests happy.
______________________________________________________________________________
                             5-C Six Flags Holland
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Task......................Try your hand at running and improving this 
                                Six Flags Park
Objectives......................To have at least 3,500 guest in your park at 
                                the end of October Year 4 and the park rating
                                must be at least 600.
Initial Guests in Park..........1325
Initial Rating..................943
Park Size.......................1,281,390 sq.ft.
Initial Cash....................€10,000
Initial Debt....................€10,000
Debt Rate.......................at 6% per year
Initial Company Value...........€398,068
Initial Park Value..............€398,068
Buy Land........................No
Buy Construction Rights.........No
Profit System...................Pay to enter, Free for Rides
Rides Already Built.............Capitian Kid
                                Cavalli Borocca
                                Crazy River
                                El Condor
                                El Rio Grande
                                Excalibur
                                Flying Dutchman Gold Mine
                                G-Force
                                Goliath
                                Il Gladiatore
                                La Grade Roue
                                La Via Volta
                                Le Tours Des Jardins
                                Les Petils Cheveux
                                Les Sombreros
                                Merlins Magic Castle
                                Robin Hood
                                Six Flags Express
                                Space Shoot

o The interest rate is low so you can borrow to help pay for marketing and
  staff expenses.

o Again build only a few new big rides, try to keep them to the back of the
  park - this causes guests to spend longer in the park.

o Hire plenty entertainers and assign them to the busy queues to keep guests
  happy.
______________________________________________________________________________
                           5-D Six Flags Magic Mountain
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Task......................Build the missing Six Flags rides, or create
                                your own to improve the park! But don't forget 
                                your ultimate aim - to repay your loan while 
                                keeping the park value up!
Objectives......................Achieve a park value of €700,000 and repay 
                                your loan.
Initial Guests in Park..........2,781
Initial Rating..................697
Park Size.......................2,216,720 sq.ft.
Initial Cash....................€10,000
Initial Debt....................€50,000
Debt Rate.......................5% per year
Initial Company Value...........€764,261
Initial Park Value..............€804,261
Buy Land........................No
Buy Construction Rights.........No
Profit System...................Pay to enter, Free for Rides
Rides Already Built.............Arrowhead Splashdown
                                Buccaneer
                                Circus 1
                                Colossus [Track 1]
                                Colossus [Track 2]
                                Crooked House 1
                                Cyclone 500
                                Dé ja Vu
                                Enterprise 1
                                Ferris Wheel 1
                                Flashback
                                Gold Rusher
                                Goliath
                                Grand Carousel
                                Granny Gran Prix
                                Haunted House 1
                                Log Jammer
                                Metro
                                Motion Simulator 1
                                Ninja
                                Orient Express 1
                                Orient Express 2
                                Psyclone
                                Revolution
                                Roaring Rapids
                                Sandblaster
                                Sky Tower
                                Swashbuckler
                                The Escape [Track 1]
                                The Escape [Track 2]
                                Tidal Wave
                                Twist 1
                                Twist 2
                                Viper

o Your park value must stay above €700,000 - so don't just sell off all your 
  rides - however it is worth selling one or two (a park value of exactly 
  €700,000 will do) - but make sure they are two of the least profitably
  rides.

o Raise your entrance fee if guests are coming to your park in droves - 
  however don't let it get much higher than €60.

o Build shops and stalls to generate extra money. However close any that still
  lose money after 6 months.

o Spend pretty much all your income on reducing your debt. This park is 
  relatively easy - its just a matter of patience.
______________________________________________________________________________
                             5-E Six Flags over Texas
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Task......................Build the missing Six Flags rides, or create
                                your own to improve the park! But don't forget 
                                your ultimate aim - to attract more guests to
                                the park.
Objectives......................To have at least 3,500 guest in your park and
                                the park rating must'nt drop below 700.
Initial Guests in Park..........1,684
Initial Rating..................900
Park Size.......................1,590,600
Initial Cash....................€10,000
Initial Debt....................€10,000
Debt Rate.......................at 12% per year
Initial Company Value...........€449,582
Initial Park Value..............€449,582
Buy Land........................No
Buy Construction Rights.........No
Profit System...................Pay to enter, Free for Rides
Rides Already Built.............Bumper Cars
                                Conquistador
                                Flashback
                                Go Kart Track
                                Judge Roy Scream
                                La Vilrora
                                Missile Chaser
                                Oil Derrick
                                Ozarka Splash
                                Railroad
                                Roaring Rapids
                                Shockwave
                                Silver Star Carousel
                                Splash Water Falls
                                Texas Giant
                                Titan

o Build a few rides but not many. The majority of your money should be spent
  on attracting guests and keeping them happy.

o Don't borrow much because the interest rate is very very high at 12% per
  year.

o Keep maintence of rides a priority because guest satisfaction is very 
  important.
______________________________________________________________________________
                     6-A Build your own Six Flags Belgium
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Task......................Build your own version of this European Six
                                Flags Park.
Objectives......................To have at least 3,500 guests by the end of 
                                October, Year 5 with a park rating of at least
                                600.
Initial Guests in Park..........0
Initial Rating..................0
Park Size.......................1,137,920 sq.ft.
Initial Cash....................€10,000
Initial Debt....................€10,000
Debt Rate.......................at 7% per year
Initial Company Value...........€0
Initial Park Value..............€0
Buy Land........................No
Buy Construction Rights.........No
Profit System...................Pay to enter, Free for Rides
Rides Already Built.............None

o The build your own parks are open books - just expand, build and market.
______________________________________________________________________________
                 6-B Build your own  Six Flags Great Adventure
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Task......................Use your design skills to recreate this Six
                                Flags Park.
Objectives......................To have at least 2,500 guests by the end of 
                                October, Year 5 with a park rating of at least
                                600.
Initial Guests in Park..........0
Initial Rating..................0
Park Size.......................2,020,590 sq.ft
Initial Cash....................€10,000
Initial Debt....................€10,000
Debt Rate.......................at 10% per year
Initial Company Value...........€0
Initial Park Value..............€0
Buy Land........................No
Buy Construction Rights.........No
Profit System...................Pay to enter, Free for Rides
Rides Already Built.............None

o The build your own parks are open books - just expand, build and market.
______________________________________________________________________________
                       6-C Build your own Six Flags Holland     
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Task......................Build this European Six Flags Park the way you
                                want to.
Objectives......................To have at least 3,500 guests by the end of 
                                October, Year 6 with a park rating of at least
                                600.
Initial Guests in Park..........0
Initial Rating..................0
Park Size.......................1,281,390 sq.ft
Initial Cash....................€10,000
Initial Debt....................€10,000
Debt Rate.......................at 6% per year
Initial Company Value...........€0
Initial Park Value..............€0
Buy Land........................No
Buy Construction Rights.........No
Profit System...................Pay to enter, Free for Rides
Rides Already Built.............None

o The build your own parks are open books - just expand, build and market.
______________________________________________________________________________
                   6-D Build your own Six Flags Magic Mountain    
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Task......................Create your own version of this massive Six
                                Flags Park.
Objectives......................To repay your loan and achieve a park value 
                                of at least €700,000.
Initial Guests in Park..........0
Initial Rating..................0
Park Size.......................2,216,720 sq.ft
Initial Cash....................€10,000
Initial Debt....................€50,000
Debt Rate.......................at 5% per year
Initial Company Value...........-€40,000
Initial Park Value..............€0
Buy Land........................No
Buy Construction Rights.........No
Profit System...................Pay to enter, Free for Rides
Rides Already Built.............None

o The build your own parks are open books - just expand, build and market.
______________________________________________________________________________
                     6-E Build your own Six Flags over Texas
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Task......................Starting from scratch build the rides in this
                                Six Flags Park.
Objectives......................To have at least 3,000 guests by the end of 
                                October, Year 5 with a park rating of at least
                                600.
Initial Guests in Park..........0
Initial Rating..................0
Park Size.......................1,590,600 sq.ft.
Initial Cash....................€10,000
Initial Debt....................€10,000
Debt Rate.......................at 12% per year
Initial Company Value...........€0
Initial Park Value..............€0
Buy Land........................No
Buy Construction Rights.........No
Profit System...................Pay to enter, Free for Rides
Rides Already Built.............None

o The build your own parks are open books - just expand, build and market.
______________________________________________________________________________
                        7-A1 Air Powered Vertical Coaster
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Construction..............Track consists of steel of steel girders. Trains run
                          on rubber tires to give a smooth ride, with up-stop 
                          wheels below.
Special Track Elements....Banked Curve, Vertical Track
Maximum track slope.......90°
Vehicles..................Air Powered Coaster Train
Other Info................The train is launched out of the station by an air-
                          powered launch system. To achieve a comfortable 
                          ride, the launch speed should be carefully chosen 
                          so the train is travelling at a minimum speed over 
                          the crest of the hill.
Approximate Cost..........€6,750 upwards
Comments..................This is quite a tricky rollercoaster to design, 
                          practice in the designer.
Tips for Construction.....This rollercoaster really does'nt give you much
                          choice on how to build it, all you can really do is
                          build rides like Wings of Apollo, except with 
                          different themeing.
______________________________________________________________________________
                             7-A2 Bobsleigh Coaster
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Construction..............Track is a semi-circular channel, supported by 
                          tubular steel posts. Cars run on small wheels, and 
                          are free to take their own course along the track, 
                          guided only by the curvature and gradient of the 
                          channel.
Special Track Elements....Banked Curves, Banked Helix
Banked Curves.............50° banking
Maximum track slope.......25°
Lift hill maximum slope...25°
Max. Height above ground..90ft
Vehicles..................Bobsleigh Cars
Other Info................Track layout requires very careful planning, as cars
                          can crash off the track at the crests of hills if it
                          is going to fast.
Approximate Cost..........€2,700 upwards
Comments..................Again this rollercoaster does not offer a lot of 
                          choice other than going around and around in 
                          circles.
Tips for Construction.....1)In Bobsled coasters you must be careful not to 
                          have too high of a speed going into a turn, crashs
                          easily occur.
                          2)Stick with Helixs, they are both easy to use, fun
                          and compact.
                          3)There is no need to go too high, 40ft is more than
                          enough.
______________________________________________________________________________
                        7-A3 Compact Inverted Coaster
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Construction..............Riders sit in pairs of seats suspended beneath the 
                          track as they loop and twist through tight 
                          inversions
Special Track Elements....S-Bends, Vertical Loops, In-Line-Twists, Half Loops,
                          Half Corkscrews, Helixs, On-Ride-Photos, Block 
                          Breaks
Banked Curves.............50° banking
Maximum track slope.......60°
Lift hill maximum slope...25°
Max. Height above ground..175ft
Vehicles..................Compact Inverted Coaster Cars
Approximate Cost..........€3,750 upwards
Comments..................Lots of choice
Tips for Construction.....1)Be careful, don't let average speed get too high
                          2)One of everything makes a great coaster
                          3)Check out the pre-made designs.
______________________________________________________________________________
                          7-B1 Corkscrew Roller Coaster
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Construction..............Track has a tubular steel spine, connected to the
                          inside edges of tubular steel running rails.
                          Supporting are large tubular steel posts. Trains
                          are held on the track by wheels above, below and
                          outside the running rails.
Special Track Elements....Banked Curves, Vertical Loop, Steep Twist, Half
                          Loop, Corkscrew, Banked Helix, On-Ride Photo
Banked Curves.............50° banking
Maximum track slope.......60°
Lift hill maximum slope...25°
Max. Height above ground..239ft
Vehicles..................Roller Coaster Train
Other Info................Can give a slightly rough ride, but allows the
                          most complex track elements to be used, and can
                          be built up to a large height.
Approximate Cost..........€3,900 upwards
______________________________________________________________________________
                          7-B2 Floorless Roller Coaster
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Construction..............Wide coaster trains with no floor give the 
                          passengers an open-air feeling as they glide through
                          twisted track and multiple inversions.
Special Track Elements....Vertical Loop, Half Loop, Half Corkscrew, Helixes, 
                          On-Ride-Photo, Barrel Roll, Large Half Loop, Quarter
                          Loop, Block Brakes, Banking.
Banked Curves.............50° banking
Maximum track slope.......90°
Lift hill maximum slope...25°
Max. Height above ground..165ft
Vehicles..................Floorless Roller Coaster
Other Info................Complicated coaster, best to avoid designing until 
                          you have mastered other coasters. Use predesigned
                          coasters as guide
Approximate Cost..........€4,500 upwards
______________________________________________________________________________
                           7-B3 Flying Roller Coaster
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Construction..............Track has a tubular steel spine, connected to the 
                          outside edges of tubular steel running rails.  
                          Supports are large tubular steel posts. Trains are
                          held on the track by wheels below and inside the 
                          running rails.
Special Track Elements....Banked curves, Vertical Loop, Steep Twist, Banked 
                          Helix, On-Ride Photo, Inline Twists
Banked Curves.............50° banking
Maximum track slope.......60°
Lift hill maximum slope...25°
Max. Height above ground..145ft
Vehicles..................Flying Roller Coaster Train
Other Info................To give the feeling of flight, the passengers ride 
                          in a lying-down position. The track can twist to 
                          allow the riders to travel face-up with the track 
                          below them, or suspended face-down with the track 
                          above them.
Approximate Cost..........€3,000 upwards
______________________________________________________________________________
                                7-C1 Flying Turns
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Construction..............Riders career down a twisting track in large 
                          bobsliege cars guided only by the curvateur and
                          banking of the semi-circular track.
Special Track Elements....Helixes, Block Brakes, Banking
Maximum track slope.......60°
Lift hill maximum slope...30°
Max. Height above ground..90ft
Vehicles..................Flying Turns Car
Other Info................Like the bobslighe coaster, accidents occur very
                          easily, so be careful with speed and bends.
Approximate Cost..........€2,500 upwards
______________________________________________________________________________
                                7-C2 Giga Coaster
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Construction..............A giant steel roller coaster capable of smooth drops
                          and hills of over 300ft.
Special Track Elements....Helixes, On-Ride-Photos, Cable lift, Block Brakes,
                          Banking
Banked Curves.............50° banking
Maximum track slope.......60°
Lift hill maximum slope...25°
Max. Height above ground..425ft
Vehicles..................Giga Coaster Train
Other Info................Only design your own ones after checking out
                          the pre-made ones.
Approximate Cost..........€5,000 upwards
______________________________________________________________________________
                        7-C3 Heartline Twister Roller Coaster
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Construction..............Track consists of tubular steel running rails 
                          running through circular steel hoops. Cars run 
                          centrally between the rails, allowing heartline 
                          twists.
Special Track Elements....Heartline Roll
Maximum track slope.......60°
Lift hill maximum slope...60°
Max. Height above ground..95ft
Vehicles..................Twister Cars, Twister Cars (Reversed)
Other Info................Due to the constraints of the track and car design, 
                          corners are not possible, so build a complete 
                          circuit special transfer tracks are used to transfer
                          between a lower and an upper track.
Approximate Cost..........€3,000 upwards
______________________________________________________________________________
                               7-D1 Hypercoaster
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Construction..............A tall non-inverting roller coaster with large 
                          drops, high speed, and comfortable trains with only
                          lap bar restraint.
Special Track Elements....Helixes, On-Ride-Photos, Block Brakes, Banking.
Banked Curves.............50° banking
Maximum track slope.......60°
Lift hill maximum slope...25°
Max. Height above ground..220ft
Vehicles..................Hypercoaster trains.
Other Info................Extermly expensive to build, and hard to design, try
                          only at advanced stages.
Approximate Cost..........€5,000 upwards
______________________________________________________________________________
                          7-D2 Inverted Harpin Coaster
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Construction..............Individual cars run beneath a zig-zagging track with
                          hairpin turns and sharp drops.
Special Track Elements....Block Brakes
Maximum track slope.......60°
Lift hill maximum slope...60°
Max. Height above ground..75ft
Vehicles..................Inverted Hairpin Coaster Cars
Other Info................Easy to build, also quite cheap - good ride to build
                          early on in a park.
Approximate Cost..........€1,500 upwards
______________________________________________________________________________
                         7-D3 Inverted Impluse Coaster
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Construction..............Inverted roller coaster trains are accelerated out 
                          of station to travel up a vertical spike of track,
                          then reverse back through the station to travel 
                          backwards up another spike of track.
Special Track Elements....None
Maximum track slope.......90°
Max. Height above ground..215ft
Vehicles..................Inverted Impulse Coaster Trains
Other Info................Short ride that is quite exciting, great revenue
                          generator if your charging per ride.
Approximate Cost..........€1,500 upwards
______________________________________________________________________________
                          7-E1 Inverted Roller Coaster
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Construction..............Track has a square-section steel spine, connected to
                          the inside edges of tubular steel rails. Supports 
                          are large square-section steel posts. Trains hang 
                          underneath the track, held in position by wheels 
                          above, below and outside the running rails.
Special Track Elements....Banked Curves, Vertical Loop, Steep Twist, Inline
                          Twist, Half Loop, Corkscrew, Banked Helix, On-Ride 
                          Photo
Banked Curves.............50° banking
Maximum track slope.......60°
Lift hill maximum slope...25°
Max. Height above ground..180ft
Vehicles..................Inverted Roller Coaster
Other Info................An Inverted Roller Coaster feels more intense and 
                          exciting than a sit-down roller coaster; due to 
                          the exposed feeling the riders have with their feet
                          dangling below them and the lack of a car around 
                          them.
Approximate Cost..........€4,000 upwards
______________________________________________________________________________
                          7-E2 Inverted Shuttle Coaster
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Construction..............Riders sit in pairs facing either fowards or 
                          backwards as they loop and twist through tight 
                          inversions.
Special Track Elements....Vertical loop, In-Line-Twist, Half Loop, Half
                          Corkscrew, Helixes, On-Ride-Photo, Block Brakes,
                          Banking.
Banked Curves.............50° banking
Maximum track slope.......60°
Lift hill maximum slope...25°
Max. Height above ground..125ft
Vehicles..................Inverted Shuttle Coaster Train.
Other Info................Lovely cheap and exciting ride, makes plenty of 
                          money. Be careful with design to avoid crashs.
Approximate Cost..........€1,500 upwards
______________________________________________________________________________
                          7-E3 Inverted Vertical Coaster
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Construction..............Riders sit in cars suspended beneath the track, 
                          pulled backwards up a vertical track and then 
                          dropped to loop and twist around tight inversions.
Special Track Elements....Vertical Loop, In-Line-Twist, Half Loop, Half 
                          Corkscrew, Helixes, On-Ride-Photo, Block Brakes,
                          Banking.
Banked Curves.............50° banking
Maximum track slope.......90°
Lift hill maximum slope...25°
Max. Height above ground..125ft
Vehicles..................Inverted Vertical Coaster Shuttle
Other Info................Difficult to design, stick with pre-made coasters
                          like De Javu.
Approximate Cost..........€2,500 upwards
______________________________________________________________________________
                           7-F1 Junior Roller Coaster
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Construction..............A gentle roller coaster for people who have'nt yet
                          got the courage to face the larger rides.
Special Track Elements....Helixes, Block Brakes, Banking.
Banked Curves.............50° banking
Maximum track slope.......25°
Lift hill maximum slope...25°
Max. Height above ground..55ft
Vehicles..................Log Trains,
                          Ladybird Trains,
Other Info................Easiest roller coaster in the entire game to design,
                          you can hom your designing skills by practicing with
                          this one. Its also very chesp.
Approximate Cost..........€3,000 upwards
______________________________________________________________________________
                         7-F2 LIM Launched Roller Coaster
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Construction..............Roller Coaster trains are accelerated out of 
                          station by linear induction motors to speed through
                          twisting inversions.
Special Track Elements....Vertical Loops, In-Line-Twists, Half Corkscrews,
                          Helixes, On-Ride-Photo, Quarter Loops, Block Brakes,
                          Banking.
Banked Curves.............50° banking
Maximum track slope.......90°
Max. Height above ground..170ft
Vehicles..................LIM Roller Coaster Trains.
Other Info................Interesting at a glance...but noting special.
Approximate Cost..........€2,000 upwards
______________________________________________________________________________
                          7-F3 Lay-down Roller Coaster
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Construction..............Riders are held in special harnesses in a laying 
                          down position, traveling through twisted track and
                          inversions either on their backs or laying on the
                          ground.
Special Track Elements....Vertical Loops, Helixes, On-Ride-Photo, 
                          In-Line-Twist, Half Loop, Half Corkscrew, Block 
                          Brakes, Banking.
Banked Curves.............50° banking
Maximum track slope.......60°
Lift hill maximum slope...25°
Max. Height above ground..125ft
Vehicles..................Lay-Down Roller Coaster Train
Other Info................Great coaster if you can builds it - and pay for it!
Approximate Cost..........€4,500 upwards
______________________________________________________________________________
                          7-G1 Looping Roller Coaster
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Construction..............Roller Coaster trains with lap bars capable of 
                          traveling through vertical loops.
Special Track Elements....Vertical Loops, Helixes, On-Ride-Photo, Block 
                          Brakes, Banking.
Banked Curves.............50° banking
Maximum track slope.......60°
Lift hill maximum slope...25°
Max. Height above ground..170ft
Vehicles..................Looping Coaster Train
Other Info................Standard roller coaster.
Approximate Cost..........€3,500 upwards
______________________________________________________________________________
                                7-G2 Mine Ride
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Construction..............Powered mine trains career along a smooth and 
                          twisted track layout.
Special Track Elements....Helixes, On-Ride-Photo, Banking.
Banked Curves.............50° banking
Maximum track slope.......25°
Max. Height above ground..60ft
Vehicles..................Mine Trains
Other Info................Great coaster when mixed with plenty of well placed
                          mine theming.
Approximate Cost..........€3,000 upwards
______________________________________________________________________________
                            7-G3 Mine Train Coaster
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Construction..............Track consists of tubular steel rails, fastened
                          to a wooden support structure. Trains are held
                          on the track by wheels above, below and outside
                          the running rails.
Special Track Elements....Banked Curves, Banked Helix, On-Ride Photo
Banked Curves.............50° banking
Maximum track slope.......60°
Lift hill maximum slope...25°
Max. Height above ground..100ft
Vehicles..................Mine Train Coaster
Other Info................The Mine Train is all about fast, smooth, twisted
                          track, and can be improved considerably by adding
                          tunnels.
Approximate Cost..........€3,500 upwards
______________________________________________________________________________
                           7-H1 Mini Roller Coaster
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Construction..............Track has steel running rails with cross-bracing.
                          Supports are thin square-section posts. Trains are
                          held on the track by wheels above, below and
                          outside the running rails.
Special Track Elements....None
Maximum track slope.......60°
Lift hill maximum slope...25°
Max. Height above ground..75ft
Vehicles..................Automobile Cars,
                          Rocket Cars,
                          Toboggon,
Other Info................Cheaper than other types of roller coaster, but
                          can't be as tall and curves can't be banked.
Approximate Cost..........€1,500 upwards
______________________________________________________________________________
                         7-H2 Mini Suspended Coaster
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Construction..............Passengers ride in small cars hanging beneath the
                          single rail track, swinging freely from side to side
                          around corners.
Special Track Elements....None
Maximum track slope.......25°
Lift hill maximum slope...25°
Max. Height above ground..45ft
Vehicles..................Swinging Cars
Other Info................Easy coaster if your on a tight budget and not great
                          at designing coasters.
Approximate Cost..........€2,000 upwards
______________________________________________________________________________
                      7-H3 Mini Suspended Flying Coaster
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Construction..............Passengers ride face-down in a lying position,
                          suspended in a specially designed car from the 
                          single rail-track, swinging freely from side to 
                          side.
Special Track Elements....None
Maximum track slope.......25°
Lift hill maximum slope...25°
Max. Height above ground..45ft
Vehicles..................Swinging Cars
Other Info................Similer to Mini Suspended Coaster.
Approximate Cost..........€2,000 upwards
______________________________________________________________________________
                            7-I1 Motorbike Races
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Construction..............Riders ride motorbike-shaped roller coaster 
                          vehiles along a single-rail track.
Special Track Elements....Block Breaks.
Maximum track slope.......25°
Lift hill maximum slope...25°
Max. Height above ground..65ft
Vehicles..................Motorbikes
Other Info................Boring ride, but cheap and cheerfull.
Approximate Cost..........€1,500 upwards
______________________________________________________________________________
                      7-I2 Multi-Dimension Roller Coaster
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Construction..............Siting in seats suspended either side of the track,
                          riders are pitched head-over-heels while they plunge
                          down steep drops and travel through various 
                          inversions.
Special Track Elements....Helixes, On-Ride-Photo, In-Line-Twist, Block Breaks,
                          Quarter Loop, Seat Rotations.
Banked Curves.............50° banking
Maximum track slope.......90°
Lift hill maximum slope...25°
Max. Height above ground..195ft
Vehicles..................Multi-Dimension Coaster Train
Other Info................Incrediably difficult coaster to design - only 
                          attempt to design in designer.
Approximate Cost..........€10,000 upwards
______________________________________________________________________________
                          7-I3 Reverse Freefall Coaster
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Construction..............The car is accelerated out of the station along a
                          long level track using Linear Induction Motors, then
                          heads straight up a vertical spike of track,
                          freefalling back down to return to the station.
Special Track Elements....Slope up Vertical, Vertical Track.
Maximum track slope.......90°
Max. Height above ground..575ft
Vehicles..................Reverse Freefall Car
Other Info................Great ride to put at park edge. Highest roller 
                          coaster in the game.
Approximate Cost..........€2,000 upwards
______________________________________________________________________________
                           7-J1 Reverser Roller Coaster
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Construction..............Track is laminated wood, topped with a flat steel
                          running rail, constructed on a wooden support
                          structure. Cars run on bogies guided along the
                          track by side-friction wheels running. Special
                          sections of track are used to turn the car around,
                          allowing it to run backwards.
Special Track Elements....Reversing Sections
Maximum track slope.......25°
Lift hill maximum slope...25°
Max. Height above ground..85ft
Vehicles..................Reverser Cars
Other Info................Can leave guests quite nauseaus if you build too
                          many reverser sections.
Approximate Cost..........€1,750 upwards
______________________________________________________________________________
                         7-J2 Side-Friction Roller Coaster
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Construction..............Track is laminated wood, topped with a flat steel 
                          running rail, constructed on a wooden support 
                          structure. Trains are guided along the track by 
                          side-friction wheels running inside wooden guide 
                          rails.
Special Track Elements....None
Maximum track slope.......25°
Lift hill maximum slope...25°
Max. Height above ground..70ft
Vehicles..................Wooden Side Friction Cars
Other Info................Cheap and easy to build, the track layout needs to
                          be designed carefully, otherwise cars can fly
                          straight off the track on hills.
Approximate Cost..........€1,500 upwards
______________________________________________________________________________
                             7-J3 Soap Box Derby
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Construction..............Riders ride soap-box car shaped vehicles along a 
                          single rail roller coaster track.
Special Track Elements....Block Brakes
Maximum track slope.......25°
Lift hill maximum slope...25°
Max. Height above ground..65ft
Vehicles..................Soap-box derby cars
Other Info................Very simple ride for less intense riders.
Approximate Cost..........€1,000 upwards
______________________________________________________________________________
                          7-K1 Spinning Wild Mouse
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Construction..............Mouse shaped cars speed through tight corners and
                          short drops, gently spinning round to disorintate
                          riders.
Special Track Elements....Spinning Control Toggle Track, Block Brakes.
Maximum track slope.......25°
Lift hill maximum slope...25°
Max. Height above ground..75ft
Vehicles..................Spinning Wild Mouse Cars
Other Info................Nice ride, but results in many nauesus guests.
Approximate Cost..........€1,500 upwards
______________________________________________________________________________
                          7-K2 Sprial Roller Coaster   
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Construction..............A compact steel-tracked roller coaster with spiral
                          lift hill and cars with in line seating.
Special Track Elements....Helixes, On-Ride-Photo, Curved Lift Hill, Block 
                          Brakes, Banking.
Banked Curves.............30° banking
Maximum track slope.......25°
Lift hill maximum slope...25°
Max. Height above ground..90ft
Vehicles..................Spiral Roller Coaster Train
Other Info................Really good ride to start off with, very cheap.
Approximate Cost..........€3,500 upwards
______________________________________________________________________________
                         7-K3 - Stand-up Roller Coaster                     
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Construction..............Track has a tubular steel spine, connected to the
                          inside edges of tubular steel running rails.
                          Supporting are large tubular steel posts. Trains
                          are held on the track by wheels above, below and
                          outside the running rails.
Special Track Elements....Banked Curves, Vertical Loop, Half Loop, 
                          Corkscrew, On-Ride Photo
Banked Curves.............30° banking
Maximum track slope.......60°
Lift hill maximum slope...25°
Max. Height above ground..120ft
Vehicles..................Stand-Up Roller Coaster Cars
Other Info................Gives a more intense ride than a sit-down roller
                          coaster, so the track requires careful design to
                          avoid high G forces, especially lateral G's.
Approximate Cost..........€4,000 upwards
______________________________________________________________________________
                         7-L1 - Stand-up Twister Coaster
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Construction..............Riders ride in a standing position in wide coaster
                          trains with specially designed restraints as they 
                          race down smooth drops and through multiple 
                          inversions.
Special Track Elements....Vertical Loop, Half Loop, Half Corkscrew, Helixes,
                          On-Ride-Photo, Barrel Roll, Large Half Loop, 
                          Quarter Loop, Block Brakes, Banking.
Banked Curves.............50° banking
Maximum track slope.......90°
Lift hill maximum slope...25°
Max. Height above ground..195ft
Vehicles..................Stand-Up-Twister Coaster Trains
Other Info................Excellent ride, but yet again very hard to build
                          and very costly.
Approximate Cost..........€7,500 upwards
______________________________________________________________________________
                              7-L2 - Steeplechase
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Construction..............Riders ride horse shaped vehicles which run along a
                          single rail coaster track.
Special Track Elements....Block Brakes
Maximum track slope.......25°
Lift hill maximum slope...25°
Max. Height above ground..65ft
Vehicles..................Horses
Other Info................Nice cheap space filler - but noting more than that.
Approximate Cost..........€1,500 upwards
______________________________________________________________________________
                         7-L3 - Suspended Swinging Coaster
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Construction..............Track has a tubular steel spine, connected to the
                          inside edges of tubular steel running rails.
                          Supporting are large tubular steel posts. Trains
                          hang underneath the track, swinging freely on a
                          chassis held on by wheels above, below, and
                          outside the running rails.
Special Track Elements....Banked Helix, Block Brakes
Maximum track slope.......60°
Lift hill maximum slope...25°
Max. Height above ground..110ft
Vehicles..................Suspended Swinging Aeroplane Cars,
                          Suspended Swinging Cars
                          Swinging Floorless Cars,
Other Info................A good Suspended Roller Coaster requires plenty of
                          curves and helixes to provide high lateral G's
                          to swing the cars.
Approximate Cost..........€3,750 upwards
______________________________________________________________________________
                         7-M1 - Twister Roller Coaster
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Construction..............Track has a box-section steel spine, connected to
                          the inside edges of tubular steel running rails.
                          Supports are large tubular steel posts. Trains
                          are held on the track by wheels above, below, and
                          outside the running rails.
Special Track Elements....Banked Curves, Vertical Loop, Steep Twist, Half
                          Loop, Corkscrew, Banked Helix, On-Ride Photo,
                          Barrel Roll, Launched Lift Hill, Large Loop and
                          Half Loop.
Banked Curves.............50° banking
Maximum track slope.......90°
Lift hill maximum slope...25°
Max. Height above ground..195ft
Vehicles..................Twister Roller Coaster
Other Info................Articulated Trains allow this type of roller
                          coaster to use a wide variety of twisted track
                          and inversions.
Approximate Cost..........€5,000 upwards
______________________________________________________________________________
                       7-M2 - Vertical Drop Roller Coaster
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Construction..............Track has a square section steel spine, connected to
                          the inside edges of tubular steel running rails. 
                          Supports are large square section steel posts. 
                          Trains are held on the track by wheels above, below,
                          and outside the running rails.
Special Track Elements....Banked Curves, Steep Twist, Banked Helix, On-Ride 
                          Photo, Vertical drop, Holding Brake (for vertical 
                          drop)
Banked Curves.............50° banking
Maximum track slope.......90°
Lift hill maximum slope...60°
Max. Height above ground..260ft
Vehicles..................Vertical Roller Coaster Cars
Other Info................Gives a smooth ride with limited scope for special 
                          track, but allows vertical track to be built.
Approximate Cost..........€4,000 upwards
______________________________________________________________________________
                            7-M3 - Virgina Reel
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Construction..............Track is flat-bottomed wooden trough. The cars are
                          guided along the track by the sides of the trough,
                          spinning as they touch the sides.
Special Track Elements....None
Maximum track slope.......25°
Lift hill maximum slope...25°
Max. Height above ground..65ft
Vehicles..................Reel Tubs
Other Info................Design the track layout with as many corners as
                          possible to keep the cars spinning.
Approximate Cost..........€1,000 upwards
______________________________________________________________________________
                             7-N1 - Water Coaster
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Construction..............Boat shaped Cars run on roller coaster track to 
                          allow twisting curves and steep drops, splashing
                          down into sections of water.
Special Track Elements....Helixes, Block Brakes, Water, Banking.
Bank Curves...............50°
Maximum track slope.......60°
Lift hill maximum slope...25°
Max. Height above ground..85ft
Vehicles..................Coaster Boats
Other Info................Lovely coaster - keep relatively short and fast.
Approximate Cost..........€3,500 upwards
______________________________________________________________________________
                           7-N2 - Wild Mouse Coaster
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Construction..............Track consists of tubular steel rails. Supports
                          are large tubular steel posts. Cars are held on
                          the track by wheels above, below and outside the
                          running rails.
Special Track Elements....None
Maximum track slope.......60°
Lift hill maximum slope...60°
Max. Height above ground..75ft
Vehicles..................Mouse Cars, 
                          Mine Cars,
Other Info................A good Wild Mouse Roller Coaster is all about
                          tight turns and sudden drops - the more intense
                          the better.
Approximate Cost..........€1,500 upwards
______________________________________________________________________________
                       7-N3 - Wooden Roller Coaster
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Construction..............Track is laminated wood, topped with a flat steel
                          running rail, constructed on a wooden support
                          structure. Trains are held on the track by upstop
                          wheels, which run under the inside edge of the
                          rails.
Special Track Elements....Banked Curves, Vertical Loop, On-Ride Photo,
                          Water Splash, Helixes
Banked Curves.............60° banking
Maximum track slope.......60°
Lift hill maximum slope...25°
Max. Height above ground..200ft
Vehicles..................Wooden Roller Coaster Train, 
                          Articulated Roller Coaster Trains, 
                          Wooden Roller Coaster Train - 6 seater, 
                          Wooden Roller Coaster Train - 6 seater (Reversed)
Other Info................A good Wooden Roller Coaster is fast, has plenty
                          of air-time, some lateral G's, steep drops, and
                          is designed to feel 'out-of-control'.
Approximate Cost..........€3,500 upwards
______________________________________________________________________________
                        7-O1 - Wooden Wild Mine Ride
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Construction..............Tiny Mine Trucks run on zig-zagging wooden track,
                          tilting percariously around hairpin turns and 
                          vicious drops.
Special Track Elements....None
Maximum track slope.......60°
Lift hill maximum slope...60°
Max. Height above ground..65ft
Vehicles..................Wooden Wild Mine Ride Cars
Other Info................A good Wild Mouse Mine Ride uses plenty of the 
                          available mine themeing with sharp drops and sudden
                          bends, all at constantly changing speeds.
Approximate Cost..........€1,500 upwards
______________________________________________________________________________
                           7-O2 - Wooden Wild Mouse
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Construction..............Track is laminated wood, topped with a flat steel
                          running rail, constructed on a wooden support
                          structure. Cars are held on the track by mushroom
                          shaped pegs, running between steel guide rails in
                          the centre of the track, allowing the cars to
                          tilt over the corners.
Special Track Elements....None
Maximum track slope.......60°
Lift hill maximum slope...60°
Max. Height above ground..65ft
Vehicles..................Wooden Wild Mouse
Other Info................A good Wild Mouse Roller Coaster is all about
                          tight turns and sudden drops - the more intense
                          the better.
Approximate Cost..........€1,500 upwards
______________________________________________________________________________
                            8-A1 - 3D Cinema
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Cost................€560
Running Cost per hour.....€49.60
Modes.....................3D Film - 'Mouse Tails'
                          3D Film - 'Storm Chasers'
                          3D Film - 'Space Raiders'

o The most important strategy for 3D Cinemas is to change the film running
  every few months so that the same guests visit 2 or 3 times.

o If you want to build more than one 3D Cinema in the one park - keep them
  well away from one another so that everyone in the park has a chance to use
  a 3D Cinema.
______________________________________________________________________________
                            8-A2 - Boat Hire
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Cost................€205+ (depends on platform lenght)
Running Cost per hour.....€73.60
Modes.....................Boat Hire Mode

o Don't build the boat hires in too large of a lake because boats will get 
  lost and not return to the platform.

o Build your platform as long as possible, so you can offer as many boats as
  possible.
______________________________________________________________________________
                           8-A3 - Bumper Cars
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Cost................€440
Running Cost per hour.....€108.80
Modes.....................Bumper Car Mode 

o Nice ride to build near the park entrance - it gets peoples happiness rating
  up quickly - and the happier the guest - the quicker they spend money.
______________________________________________________________________________
                            8-B1 - Chairlift 
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Cost................€Mediocre - depends on track lenght
Running Cost per hour.....€Mediocre - depends on track lenght
Modes.....................Continuous Circuit Mode
                          Shuttle Mode

o Use in mountainous levels to transport guest from point to point by 
  individual chairs.

o Build more than two platforms to make the system more useful for guests and
  to get more chairs (thus more guests can ride at any one time.)

o You can increase the ride ride - do this in parks where people pay for each
  ride - this will mean more paying guests per hour.
______________________________________________________________________________
                           8-B2 - Chesire Cats  
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Cost................€Low - depends on track lenght and height 
Running Cost per hour.....€Low - depends on no. of cars
Modes.....................Continuous Circuit

o Theme with trees and shrubs. Placing a fence or hedge around the perimater
  of the ride gives a nice final touch.

o Don't build too complex of a track - keep it short with a few twists because
  the maximum excitement rating your likely to get is not going to change much
  with ride lenght.
______________________________________________________________________________
                            8-B3 - Circus Show 
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Cost................€500 
Running Cost per hour.....€49.60
Modes.....................Circus Show Mode

o Circus shows are best built beside large rollercoasters - the guests who
  don't like intense ride will then choose the Circus.
______________________________________________________________________________
                           8-C1 - Crooked House 
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Cost................€250
Running Cost per hour.....€28.80
Modes.....................Crooked House Mode

o Very cheap to build and complements the gentle ride sections of your park,
  however Crooked Houses are not very popular - so only build after you have
  built plenty of other rides.
______________________________________________________________________________
                            8-C2 - Cycle Railway 
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Cost................€Mediocre - depends on track lenght and height 
Running Cost per hour.....€Mediocre - depends on no. of cycles
Modes.....................Continuous Circuit

o Themeing with fences, hedges, bushs, flowers, statues, water features ect.
  will boost the otherwise relativly low excitement rating.

o Again Cycle railways tend to attract the less-intense rider, so place near 
  intense rides to give guests a good choice.
______________________________________________________________________________
                      8-C3 - Double-Deck Observation Tower
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Cost................€High - depends on ride height
Running Cost per hour.....€60.80
Modes.....................Continuous Circuit Mode

o Build either in the centre of your park or at the entrance - the entrance 
  option will allow guests to get an idea of where rides are - the centre will
  give guests the best view.

o You can build more than one tower - but keep them apart from each other - 
  they are'nt the most popular rides.

o Over time as the park grows, the towers excitement rating increases - make 
  sure to keep increaseing the price to equal the rating.
______________________________________________________________________________
                               8-D1 - Elevator  
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Cost................€High - depends on ride height
Running Cost per hour.....€Mediocre - depends on ride height
Modes.....................Shuttle Mode

o Best off to stick with the pre-designed elevator - it is well designed and
  will fit in to any park.
______________________________________________________________________________
                              8-D2 - Enterprise
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Cost................€800
Running Cost per hour.....€49.60
Modes.....................Rotation Mode

o This is a great ride to build if you have very little cash - it is 
  relatively cheap to build and makes a lot of money.
______________________________________________________________________________
                             8-D3 - Ferris Wheel 
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Cost................€450
Running Cost per hour.....€49.60
Modes.....................Continuous Circuit Mode

o Althought the traditional theme park demands a Ferris Wheel - its a classic,
  they tend to be very unpopular in rollercoaster tycoon - so only build one
  when you have developed most rides already.

o Building big rides (such as rollercoasters) near a ferris wheel boosts its 
  excitement rating.
______________________________________________________________________________
                            8-E1 - Flying Saucers 
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Cost................€560 
Running Cost per hour.....€148.80
Modes.....................Bumper Car Mode

o Althought relatively popular with a good excitement rating - flying saucers
  cost a lot to run.
______________________________________________________________________________
                              8-E2 - Ghost Train 
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Cost................€High - depends on ride lenght
Running Cost per hour.....€Mediocre - depends on ride lenght and no. of trains
Modes.....................Continuous Circuit Mode

o Castle and building themeing suits ghost trains the best. However this 
  usually means construction is very expensive.

o Best to stick with pre-designed tracks early on in parks where your money 
  levels are low.
______________________________________________________________________________
                                8-E3 - Go Karts    
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Cost................€Mediocre - depends on track lenght/height
Running Cost per hour.....€65.60
Modes.....................Race Mode
                          Continuous Circuit Mode

o Building more than one Go Karts track beside another one boosts both tracks 
  excitement rating considerably.

o Race mode thens to be the most popular mode, however in busy parks 
  continuous circuit mode is also popular.

o Themeing is very important - any cort will work; mine, castle, wonderland
  etc. Also track layout boosts excitement ratings if there is lots of twists,
  elevations, underground sections and bridges.
______________________________________________________________________________
                              8-F1 - Haunted House   
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Cost................€340
Running Cost per hour.....€49.60
Modes.....................Continuous Circuit Mode

o Nice cheap ride to build and run - however not that popular - only build if
  you've built most other rides.
______________________________________________________________________________
                             8-F2 - Haunted Mansion 
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Cost................€High - depends on ride lenght and themeing
Running Cost per hour.....€Mediocre - depends on ride lenght and no. of cars
Modes.....................Continuous Circuit Mode

o Stick with thr pre-designed track layout - it is much easier and simplier to
  build than any coustom one.

o In coustom tracks make your paltform long and have plenty of cars, so the
  maximum number of guests can ride at anyone time.
______________________________________________________________________________
                                8-F3 - Hedge Maze 
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Cost................€Low - depends on lenght
Running Cost per hour.....€49.60
Modes.....................Maze Mode

o Again not that popular of a ride - only build after you have built plenty 
  of more popular rides.
______________________________________________________________________________
                                8-G1 - Jet Skis  
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Cost................€205+ (depends on platform lenght)
Running Cost per hour.....€60.80
Modes.....................Boat Hire Mode

o Don't build on too buig of a lake - riders won't return skis and the ride 
  will lose money.

o Build a long platform - the longer it is the more skis the ride will have -
  thus more guests per hour and more money per hour.
______________________________________________________________________________
                                8-G2 - Log Flume 
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Cost................€Very High - depends on height/lenght
Running Cost per hour.....€High - depends on no. of flumes
Modes.....................Continuous Circuit Mode

o Very popular with guests, design for track to go up, over, under around 
  other sections of the track to boost the excitement rating.
______________________________________________________________________________
                              8-G3 - Merry-Go-Round
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Cost................€460
Running Cost per hour.....€49.60
Modes.....................Continuous Circuit Mode

o Not that popular, best built near busy paths - such as those beside 
  foodcourts.

o Building merry-go-rounds in the centre of squares where people congregate
  makes them look good and boosts popularity. There music also boosts the
  park rating.
______________________________________________________________________________
                                8-H1 - Mini Cars 
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Cost................€Mediocre - depends on ride lenght and height
Running Cost per hour.....€High - depends on ride lenght and no. of cars
Modes.....................Continuous Circuit Mode

o For the less-intense rider, mini cars are'n that popular or profitable. Good
  themeing will boost the excitement rating a bit - but not that much.
______________________________________________________________________________
                                8-H2 - Mini Golf   
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Cost................€Mediocre - depends on ride lenght and no. of holes
Running Cost per hour.....€Low - depends on ride lenght and no. of holes
Modes.....................Continuous Circuit Mode

o Very popular - however not that profitable, because only a few people can 
  use it at any one time.

o The pre-designed courses will give you an idea how to theme your own mini
  golf courses.
______________________________________________________________________________
                              8-H3 - Mini Helicopters 
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Cost................€Mediocre - depends on ride lenght and height
Running Cost per hour.....€Low - depends on ride lenght and no. of helicopters
Modes.....................Continuous Circuit Mode

o Yet again only for the the faint hearted - not popular or very profitable -
  themeing will increase the excitement rating a bit.
______________________________________________________________________________
                              8-I1 - Minituare Railway  
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Cost................€High - depends on track lenght
Running Cost per hour.....€High - depends on track lenght and no. of trains
Modes.....................Continuous Circuit Mode

o Excellent ride - both helps guests get around and makes lots of money. Make
  sure to revise fares every few months as the excitement rating will increase
  due to other new rides improving guests view.

o Trees and rollercoasters beside the track wil increase the excitement 
  rating.

o Make sure to have your stops at the least popular sections of the park - to 
  make them popular.
______________________________________________________________________________
                                8-I2 - Monorail   
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Cost................€High - depends on track lenght
Running Cost per hour.....€High - depends on track lenght and no. of trains
Modes.....................Continuous Circuit Mode
                          Shuttle Mode

o Very convient - and looks well if you build over path or rides. 
______________________________________________________________________________
                                8-I3 - Monster Trucks   
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Cost................€Mediocre - depends on track lenght
Running Cost per hour.....€Mediocre -depends on track lenght and no. of trucks
Modes.....................Continuous Circuit Mode

o Use the pre-designed monster truck track to help design your own track -
  plenty of themeing will improve the excitement rating.
______________________________________________________________________________
                              8-J1 - Motion Simulator 
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Cost................€440
Running Cost per hour.....€49.60
Modes.....................Film - 'Avenging Aviators'
                          Film - 'Thrill Riders'

o Switch the film regularly to get guests to use the simulator more than once.
______________________________________________________________________________
                             8-J2 - Observation Tower  
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Cost................€High - depends on ride height
Running Cost per hour.....€60.80
Modes.....................Continuous Circuit Mode

o Build either in the centre of your park or at the entrance - the entrance 
  option will allow guests to get an idea of where rides are - the centre will
  give guests the best view.

o You can build more than one tower - but keep them apart from each other - 
  they are'nt the most popular rides.

o Over time as the park grows, the towers excitement rating increases - make 
  sure to keep increaseing the price to equal the rating.
______________________________________________________________________________
                                 8-J3 - Raft Ride
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Cost................€High - depends on lenght/elevation
Running Cost per hour.....€High
Modes.....................Continuous Circuit Mode

o Expensive and time consumeing to build - only build if you can afford to -
  however this ride is quite profitable and popular.
______________________________________________________________________________
                               8-K1 - River Rapids 
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Cost................€High - depends on ride lenght and no. features
Running Cost per hour.....€High - depends on no. of boats.
Modes.....................Continuous Circuit Mode

o Works well in a hilly park - where it is blended in to look like a real
  river.

o Very profitable and easy to build - make sure to have plenty of boats so
  more guests can use it at the same time.

o Make the queue path into a bridge over part of the river (if possible) to 
  increase guests anticipation.
______________________________________________________________________________
                               8-K2 - River Ride
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Cost................€High - at least a €1,500, depends on track
Running Cost per hour.....€Mediocre - depends on no. rafts
Modes.....................Continuous Circuit Mode

o Expensive enough to build - wait until you have already built plenty of
  other rides.

o Themeing (particularly trees) will boost the excitement rating and thus the
  amount you can charge for guests to use the ride.
______________________________________________________________________________
                                8-K3 - Roto Drop   
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Cost................€Mediocre - depends on height
Running Cost per hour.....€60.60
Modes.....................Freefall drop mode
Max Capacity..............16

o One of the best thrill rides - build more than one in big parks because 
  quite frankly there is plenty of demand for good thrill rides

o Roto Drops allow guests to see the whole park - so placing them in the 
  centre of the park means; not only do they make lots of money; but also
  help guests find there way around.
______________________________________________________________________________
                                8-L1 - Snow Cups 
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Cost................€Low
Running Cost per hour.....€Low
Modes.....................Continuous Circuit Mode

o I've never actually used this ride (until I wrote this guide) because I find
  it boring and most guests do also.
______________________________________________________________________________
                               8-L2 - Space Rings 
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Cost................€288
Running Cost per hour.....€49.60
Modes.....................Continuous Circuit Mode

o Very popular - however space ring shave alow capacity - so maybe build 2 
  space rings beside each other if demand gets too high.
______________________________________________________________________________
                              8-L3 - Spiral Slide 
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Cost................€330
Running Cost per hour.....€49.60
Modes.....................One Ride Mode
                          Unlimited Rides Mode

o The one ride mode is by fare the most profitable - don't even consider the
  unlimited rides mode in a park where guests pay for rides not the entrance
  fee.
______________________________________________________________________________
                           8-M1 - Suspended Monorail  
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Cost................€Very High - depends on track lenght and height
Running Cost per hour.....€High - depends on track lenght and no. of trains
Modes.....................Continuous Circuit Mode
                          Shuttle Mode

o Same as the normal monorail - very convient and popular. 
______________________________________________________________________________
                         8-M2 - Swinging Inverted Ship 
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Cost................€387
Running Cost per hour.....€49.60
Modes.....................Swinging Mode

o Very good ride to strat off a park with - its cheap, popular and makes lots
  of money.
______________________________________________________________________________
                              8-M3 - Swinging Ship  
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Cost................€424
Running Cost per hour.....€49.60
Modes.....................Swinging Mode

o Very good ride to strat off a park with - its cheap, popular and makes lots
  of money.
______________________________________________________________________________
                               8-N1 - Tram Ride
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Cost................€High - depends on track lenght
Running Cost per hour.....€Mediocre -depends on track lenght and no. of trains
Modes.....................Continuous Circuit Mode
                          Shuttle Mode

o Suits a highly themed park - best left to some of the Six-Flags parks. Trams
  are popular however and very useful.
______________________________________________________________________________
                             8-N2 - Water Coaster
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Cost................€High - depends on lenght
Running Cost per hour.....€High - depends on capacity
Modes.....................Continuous Circuit Mode
                          Continuous Circuit Blocked Section Mode 

o Very popular and easy to build. Suits a water themed park the best alongside
  log flumes and water slides.
______________________________________________________________________________
                              8-N3 - Water Slide  
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Basic Cost................€High - at least €2,000, depends on dimensions
Running Cost per hour.....€High
Modes.....................Continuous Circuit Mode

o Be careful that the bottom of downward sections have cover top track - 
  otherwise guests will fly off.

o Build a few water slides side by side to boost individual excitement
  ratings.
______________________________________________________________________________
                              9-A1 - Balloon Stall
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Cost: €200
Stock cost: €0.90
Ideal Price: €1.50
Profit: €0.60

Balloon Stalls sell balloons in a wide variety of colours. It is advisable not
to open any balloon stalls until guest numbers hit about 1,000+. Stalls should
be placed in areas where large numbers of people cross, particularly at path
intersections. If you have more than one balloon stall, make sure to offer
different colours - and as time progresses, change the colour of balloons in
all shops. Most parks can only support about 3 stalls, but they are likely to
be highly profitable. If you want a bit of fun, you can pop any balloons that 
float off by clicking on them.
______________________________________________________________________________
                            9-A2 - Beef Noodle Stall
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Cost: €300
Stock cost: €1.50
Ideal Price: €2.00
Profit: €0.50

I would'nt build Beef Noodle Stall's given the choice, the base product cost
is quite high, so you cannot charge over more than €2, or you will deter 
guests, so this leaves a low profit margin. However they do offer guests a 
change from the burgers and chips. Beef Noodle Stall's also really suit
the oriental themed areas of your park.
______________________________________________________________________________
                                9-A3 - Burger Bar
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Cost: €300
Stock cost: €1.50
Ideal Price: €2.10
Profit: €0.60

Burger bars are the standard food shop. They tend to be very profitable and
are ideally suited to busy unthemed areas such as entrance zones or food 
courts. Unfortuatly they look rather unoriginal and dull. You can boast 
profits by placing burger bars near the exits of long queue rides, because
guests tend to have built up an appetite after queuing for ages.
______________________________________________________________________________
                              9-B1 - Candy Apple Stall
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Cost: €300
Stock cost: €0.70
Ideal Price: €1.20
Profit: €0.50

Candy apple stalls will only make serious cash when placed in certain high 
footfall areas such as path intersections. Ride exits work well also althought
not as good as squares or path crossings. However overall Candy Apples don't
make as much money as say Chicken Nugget's.
______________________________________________________________________________
                                9-B2 - Cash Machine
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Cost: €200

Cash machines are essential in all parks - both pay at entrance and pay at 
ride parks. In pay at entrance parks, cash machines should be placed near
entrance areas and particularly food courts. In pay at ride parks, machines
should be built everywhere - particularly near the back of the park.
______________________________________________________________________________
                            9-B3 - Chicken Nuggets Stall
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Cost: €300
Stock cost: €1.50
Ideal Price: €2.00
Profit: €0.50

Quite profitable, can turn profit in most loctions, even in small parks 
because chicken nuggets are substantial and easily cover guests hunger. 
Chicken Nugget Stalls can be the ancor for your food court and is likely to
be the first to brake even.
______________________________________________________________________________
                                9-C1 - Coffee Shop
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Cost: €250
Stock cost: €1.20
Ideal Price: €1.90
Profit: €0.70

Great oppertunities here, great profit margin and a very popular product. This
is definatly one of the best drink stalls. Place throughout park - mainly 
beside food stalls.
______________________________________________________________________________
                                9-C2 - Cookie Shop
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Cost: €300
Stock cost: €0.70
Ideal Price: €1.00
Profit: €0.30

Cookies euh? Sounds good right? Well not really, profit margin is quite low
and product does not really fill guests. Only build in large parks and in
food courts.
______________________________________________________________________________
                            9-C3 - Cotton Candy Stall
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Cost: €300
Stock cost: €0.80
Ideal Price: €1.30
Profit: €0.50

Good profitable stall, althought don't go mad with them. Fits in nicely in
themed areas - particularly wonderland. Profits are highest at cross roads,
ride exits and high footfall food courts.
______________________________________________________________________________
                               9-D1 - Donut Shop
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Cost: €300
Stock cost: €0.70
Ideal Price: €1.00
Profit: €0.30

Not spectacular, at €1 you will need to sell a lot of donuts, so set your
sights only on burgers in particularly busy parks and especially in busy 
areas.
______________________________________________________________________________
                               9-D2 - Drink Stall
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Cost: €250
Stock cost: €1.20
Ideal Price: €1.70
Profit: €0.50

Drink stalls are the most important and most profitable shops in the game
apart from Burger Bars - and pairing them with Burger Bars will result in
great profits. Place at ride exits, path crossings, squares etc. and you
can't go wrong.
______________________________________________________________________________
                            9-D3 - First Aid Station
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Cost: €250

Not as important as you may think. Only build a few clustered near roller 
coasters and high nausea rides such as launched freefalls. Rembember every 
extra one costs you in running costs.
______________________________________________________________________________
                           9-E1 - Fried Chicken Stall
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Cost: €300
Stock cost: €1.50
Ideal Price: €2.00
Profit: €0.50

Middle of the road shop, only build for variety and not really in the hope
of a massive profit like that seen in Burger Bars. Pairing with drink stalls
makes good fiscal sense.
______________________________________________________________________________
                         9-E2 - Fried Rice Noodles Stall
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Cost: €300
Stock cost: €1.50
Ideal Price: €2.00
Profit: €2.00

Again only really for variety - althought the money helps! Suits the oriental
theming in particular and goes well with other simerally themed shops, stalls
and rides.
______________________________________________________________________________
                               9-F1 - Fries Stall
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Cost: €300
Stock cost: €1.50
Ideal Price: €2.00
Profit: €0.50

Fries are lovely profit makers, like burger bars, fries are staples and 
everyone will eat them. At €0.50 margin you won't go hungery!
______________________________________________________________________________
                            9-F2 - Fruity Ices Stall
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Cost: €300
Stock cost: €0.70
Ideal Price: €1.00
Profit: €0.30

Another stall that is only mediocare. You can build it for varity, but stick
to sunny parks that have plenty of guests. Just remember €0.30 is pateatic
compared to €0.60 you can get from funnel cakes. Also they don't really fill
guests up.
______________________________________________________________________________
                            9-F3 - Funnel Cake Shop
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Cost: €300
Stock cost: €1.20
Ideal Price: €1.80
Profit: €0.60

Great snack food. €0.60 is a great profit margin for a snack stall. Will suit
most parks with reasonable level of guests.
______________________________________________________________________________
                                9-G1 - Hat Stall
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Cost: €200
Stock cost: €1.50
Ideal Price: €2.10
Profit: €0.60

Nice cheap souvenires. You will sell lots of these in any park with guests, so
build a good few throught your park. Ride exits are the best places because
guests tend to be happier and more willing to spend money when in a great 
mood.
______________________________________________________________________________
                            9-G2 - Hot Chocolate Stall
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Cost: €250
Stock cost: €1.20
Ideal Price: €1.70
Profit: €0.50

Nice alternative drink to coffee or lemonade. Build near food stalls or ride
exits to sell more. 
______________________________________________________________________________
                               9-G3 - Hot Dog Stall
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Cost: €300
Stock cost: €1.00
Ideal Price: €1.50
Profit: €0.50

Great value for guests with high profit margin. Whats more hot dogs really 
fill guests up. As always have drink stalls nearby to maximise profit.
______________________________________________________________________________
                           9-H1 - Ice Cream Cone Stall
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Cost: €300
Stock cost: €0.90
Ideal Price: €1.50
Profit: €0.60

Ice cream is an ideal product for your parks, especially in hot, sunny parks.
Place Ice Cream stalls anywhere and everywhere, if you have enough guests they
will always make a profit.
______________________________________________________________________________
                              9-H2 - Iced Tea Stall
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Cost: €250
Stock cost: €1.20
Ideal Price: €1.80
Profit: €0.60

Again use just for variety, althought Iced Tea Stalls will turn a profit. 
Their really good feature is how cool they look!
______________________________________________________________________________
                            9-H3 - Information Kiosk
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Cost: €250
Stock cost: €0.60 (Maps), €2.50 (Umbrellas)
Ideal Price: €1.20 (Maps, €3.00 (Umbrellas)
Profit: €0.60 (Maps), €0.50 (Umbrellas)

Single greatest shop in the game. You can make a fortune from maps and 
umbrellas. When it rains raise umbrella prices, however in sunny parks keep
umbrella prices low. Make sure to build plenty of kiosks, particularly in 
areas that guests get lost in.
______________________________________________________________________________
                             9-I1 - Lemonade Stall
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Cost: €250
Stock cost: €1.20
Ideal Price: €1.70
Profit: €0.50

Ok, like any drink stall besides the original drinks stall, this is just for
variety. Sunny parks are as always the best for drink stalls such as the
Lemonade stall.
______________________________________________________________________________
                          9-I2 - Meatball Soup Stall
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Cost: €300
Stock cost: €1.50
Ideal Price: €2.00
Profit: €0.50

Meatball Soup? => Oriental style soup stall. Nice in themed areas, althought
noting special.
______________________________________________________________________________
                              9-I3 - Pizza Stall
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Cost: €300
Stock cost: €1.60
Ideal Price: €2.30
Profit: €0.70

Pizza stalls are lovely profit makers, OK I might charge over the odds... but
who does'nt like pizza! In reality these are just for varitey. Make sure you
have plenty of bins and benchs near stall.
______________________________________________________________________________
                             9-J1 - Popcorn Stall
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Cost: €300
Stock cost: €1.20
Ideal Price: €1.60
Profit: €0.40

Popcorn stalls are OK, they are yet again for variety. They look well near
cinemas obviosly! However they do not really fill up guests properally.
______________________________________________________________________________
                             9-J2 - Pretzel Stall
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Cost: €300
Stock cost: €1.10
Ideal Price: €1.50
Profit: €0.40

A light snack, Pretzels are only Ok, and like popcorn, they have only limited
profit potential.
______________________________________________________________________________
                               9-J3 - Restroom
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Cost: €225
Ideal Price: €0.10 - €0.30

Restrooms can be usful as money makers. I am usually content with break-even
toilets, but prefer to make money from them.
______________________________________________________________________________
                               9-K1 - Restroom 2
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Cost: €225
Ideal Price: €0.10 - €0.30

The log cabine style restrooms looks a sight better from the other 
prefabricated restrooms. They suit particularly wooded areas. Again you can
try to make a small profit from them.
______________________________________________________________________________
                           9-K2 - Roast Sausage Stall
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Cost: €300
Stock cost: €1.50
Ideal Price: €2.00
Profit: €0.50

OK, no complaints. Roast susages are simply put - different. €0.50 is an OK
profit margin.
______________________________________________________________________________
                             9-K3 - Seafood Stall
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Cost: €300
Stock cost: €1.50
Ideal Price: €2.10
Profit: €0.60

Cool stall! Profit margin is ok and as ever, this is just for variety. One or
two to a park is enough.
______________________________________________________________________________
                             9-L1 - Souvenir Stall
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Cost: €200
Stock cost: €2.50 & €2.50
Ideal Price: €3.00 & €3.00
Profit: €0.50

Great money spinner. Ideal location is at park exit or ride exits (for when
guests are happy and want to spend money.)
______________________________________________________________________________
                           9-L2 - Soybean Milk Stall
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Cost: €250
Stock cost: €1.20
Ideal Price: €1.90
Profit: €0.70

Chris Sawyer really wanted variety in this game. Well if your going to give
guests something different, you might as well charge over the odds for it!
Will suit nicely in themed areas.
______________________________________________________________________________
                         9-L3 - Star Fruit Drink Stall
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Cost: €250
Stock cost: €1.20
Ideal Price: €1.80
Profit: €0.60

More variety, adding to the endless choice the consumer has... nice profit
margin thought and nice stall.
______________________________________________________________________________
                          9-M1 - Sub Sandwich Stall
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Cost: €300
Stock cost: €1.50
Ideal Price: €2.00
Profit: €0.50

Great stall, makes me hungery just writing about it. Quite popular and really
filling for guests.
______________________________________________________________________________
                           9-M2 - Sujongkwa Stall
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Cost: €250
Stock cost: €1.20
Ideal Price: €1.70
Profit: €0.50

What? 
______________________________________________________________________________
                           9-M3 - Sunglasses Stall
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Cost: €200
Stock cost: €1.50
Ideal Price: €2.00
Profit: €0.50

Obviously sunglasses sell best in sunny parks, so if you've a sunny park you 
can charge over the odds.
______________________________________________________________________________
                            9-N1 - T-Shirt Stall
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Cost: €200
Stock cost: €3.00
Ideal Price: €4.00
Profit: €1.00

Great profit maker. Build a few that are well spaced and offer different 
colours in each. 
______________________________________________________________________________
                            9-N2 - Wonton Soup Stall
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Cost: €300
Stock cost: €1.50
Ideal Price: €2.00
Profit: €0.50

More of the oriental flavor... just adds variety.

______________________________________________________________________________
                            10-A - Staff Organisation
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
________
Handymen
ŻŻŻŻŻŻŻŻ
o The best way to organise handymen is to firstly assign 75% of your handymen 
  to specific places that tend to get dirty - ride exits, foodcourts etc. The
  other 25% should be let roam free doing odd jobs.

o It is pointless getting lawns mowed - never assign handymen to this task.
_________
Mechanics
ŻŻŻŻŻŻŻŻŻ
o Assign handymen to cover 4 or 5 rides that are close to one another. This 
  means ride downtime is minimised.

o You can adjust the frequency of ride checkups in the ride control screen
  on rides that frequently breakdown - this improves mechanic efficency.
_______________
Security Gaurds
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
o Assign security gaurds to trouble spots like foodcourts.
______________________________________________________________________________
                                 10-B - Queues
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Queues are very important, so here I'll explain the ground rules regarding
queues.
__________________________
Not to Long - Not to Short
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Queues should never be too long, no matter which ride they belong to. This is
because...

a) guests get fed up and your park rating suffers,
b) you have to pay extra entertainers to keep them happy,
c) everyone ends up in a queue for the popular rides and there is thus no one
   left to ride other less popular rides, so they lose money,
d) since there are fewer people walking around, less money is spent in shops
   and stalls,

Similerly queues should not be too short because...

a) trains/carriages will end up leaving half empty,
b) paths will suffer from crowding sooner,
____________
Ideal lenght
ŻŻŻŻŻŻŻŻŻŻŻŻ
The ideal lenght is approximatly 2 times the max train/carriage load - that is
about 24 people for most queues.
_______
Routing
ŻŻŻŻŻŻŻ
Queues should not just be wraped around one another such as...

Start               
| |_________
|_________  |
|  _________|
|_________  |
        Finish

...instead they should becarefully routed around the ride, under the track and
around the theming. This increases the excitement of the ride.
__________
Other Tips
ŻŻŻŻŻŻŻŻŻŻ
o Use TV Moniters in queues to increase guests anticipation and thus their
  excitement levels. This also reduces complaints of bordem. 2 Moniters is
  enough for any queue.

o Themeing ride queues increases guests general happiess.

o You can choose from a variety of queue types, try various ones to make 
  different rides more interesting.
______________________________________________________________________________
                          10-C - Adding Excitment to Rides
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
The best ways to increase your income is to boost your excitement rating, 
heres how:

o Theme rides - theming boosts guests overall enjoyment of a ride - even trees
  and fences boost excitement ratings.

o Interlock track - if you have more than one track banking and curving around
  another - guests will find the ride much more exciteing.

o Build rides beside one another - riders will gain some excitement from the
  nearby rides.

o Build high, over water and underground - althought it is costly, it boosts 
  the excitement rating by a considerable amount.
______________________________________________________________________________
                                   10-D - Q&A
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
The Q&A section is devided up into Technical questions and gereneral ones.
____________________
Technical Questions:
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Q: On my computer when I insert the disc in, a message appears "Please insert
   disc into Drive "D", why?
A: RTC2 only works in Drive D, and never addational drives such as "E", this
   as far as I know cannot be changed.

Q: What are the system requirements?
A: OS: Windows 98/Me/XP/2K
   Processor: Intel Pentium II 300 MHz
   Memory: 64 MB (128 recommended)
   Hard Drive Space: 120 MB free drive space (200MB free recommended)
   CDROM drive: 8x Speed (16x recommended)
   Graphics card: DirectX 8.1 Compliant Video Card with 8 MB RAM
   Sound card: DirectX 8.1 Compliant Sound Card
   DirectX version: 8.1 (Included)

Q: While playing RCT2 crashs or sometimes appears poorly coloured, help!
A: If you do not have at least 120MB of free space while running RCT2, you
   can experience problems like these.
________
General:
ŻŻŻŻŻŻŻŻ
Q: When playing the scenario "Six Flags Great Adventure" after getting the
   3,000 required guests, the level does not immediatly finish, why?
A: In this level guest numbers are only checked at the end of each day, so it
   takes a little longer for the game to self terminate.
______________________________________________________________________________
                          10-E - Reader Contributions
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Anything worth saying? Well send it in!
______________________________________________________________________________
                             10-F - Websites/Links
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
http://www.rollercoastertycoon2.com - the offical website.
http://rct.ogresnet.com - major RCT site with news, downloads...
http://www.rct-2.com - RCT downloads
http://www.lott.co.uk/rct.htm - RCT downloads, cheats etc.
http://www.coasterforce.com/RCT/index.php - Tracks and Downloads.
______________________________________________________________________________
                            10-G - Rest in Series
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
The RCT series is constantly expanding across all areas. For more information
regarding these Roller Coaster Tycoon games check Gamefaqs, or some of the 
websites/links mentioned earlier in this FAQ. The following are in order of
release. NB. Expansion packs require the original game to function.

Roller Coaster Tycoon................................PC
Roller Coaster Tycoon: Added Attractions Pack........PC.........Expansion Pack
Roller Coaster Tycoon: Corkscrew Follies Expansion...PC.........Expansion Pack
RollerCoaster Tycoon: Loopy Landscapes...............PC.........Expansion Pack
Roller Coaster Tycoon 2..............................PC
Roller Coaster Tycoon 2: Wackey Worlds...............PC.........Expansion Pack
______________________________________________________________________________
                           10-H - Cheats/Easter Eggs
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Change the name of a guest...

Andy Hine...........Guest thinks "Nice ride but not as good as the Phoenix"
Brayshaw............Guest waves
Chris Sawyer........Guest takes photos of rides
Damon Hill..........Go-Karts go faster
David Ellis.........Guest thinks "and here we are on the [rollercoaster 
                    name]"
Elissa White........Guest loves coasters such as the "Giga Coaster" and 
                    "Impulse Coaster" which are designed by Intamin and 
                    guest thinks "brilliant...it's an Intamin Ride"
Katie Brayshaw......Guest waves
Tony Day............Guest get hungry 
John Wardley........Guest thinks "Wow!"
John Mace...........Guest pays double ride entrance fee
Melanie Warn........Guest is happy (park rating increases)
Michael Schumacher..Go-Karts go even faster
Mr Bean.............Go-Karts slow down
Simon Foster........Guest paints pictures of rides
(source: Cobbled together from various websites including Gamfaqs)

You can have more than one person with the same name by changing the 
capitalization of various letters. For example Chris Sawyer can be used on 
another person by making all letters lower or upper case...
chris sawyer => CHRIS SAWYER.  (source: Bostjan Cigan's FAQ)
______________________________________________________________________________
                              10-I - Park Awards
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
There are many awards available in RCT2, here is a list of them in order of +
awards and - awards.
_________
+ Awards:
ŻŻŻŻŻŻŻŻŻ
Best Bathroom Facilities Award 
Best Custom-Designed Rides Award 
Best Gentle Ride Award
Best Park Food Award 
Best Park Restrooms Award 
Best Staff Award 
Best Value Park Award 
Best Water Rides Award 
Cleanest Footpaths in the Country Award
Most Beautiful Park Award 
Most Dazzling Ride Color Schemes Award 
Park With The Best Roller Coasters Award 
Safest Park Award 
Tidiest Park Award
_________
- Awards:
ŻŻŻŻŻŻŻŻŻ
Most Confusing Park Layout Award 
Most Disappointing Park Award 
Most Untidy Park Award 
Worst Food in the Country Award 
Worst Park Food Award 
Worst Scenery in the Country Award
Worst Value Park Award 
______________________________________________________________________________
                       10-J - Term Dictionary/Information
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
__
A:
ŻŻ
Air Time - air time is the amount of time guests feel weightlessness.
Altitude - is a Ride's height from sea level, it is measured in feet (ft) and 
           meters (m).
Apex - the point where the chain-lift stops on a rollercoaster, and the track 
       slopes downwards.
Average Speed - the average speed a ride travels.
__
B:
ŻŻ
Banking - where ride track starts going at an angle.
Borrow - money you can get from the bank, but must be repaid with interest.
__
C:
ŻŻ
Cain-lift - also called pull chain, lifts rollercoaster up upward sloping 
            track.
Cash - money you have now and can spend.
Cash-Flow - the amount of money coming in every month after expenses.
Climate - type of weather a park experiences.
Company value - value of your company (park value + cash - loans).
Construction Rights - ability to build over/under land, but not on it.
__
D:
ŻŻ
Debt - money borrowed from the bank.
Down-Time - amount of time rides have not been operating.
__
E:
ŻŻ
Entertainers - staff who entertain guests, principaly in ride queues.
Entrance fee - The price to enter the park or a particular ride.
Excitement rating - the excitement rating of a ride is how much excitement 
                    your average guest experiences from a ride.
Expenditure - money going out (money you spend).
__
F:
ŻŻ
Finances - your income and expenditure
__
G:
ŻŻ
Gentle Rides - Rides designed for people seeking a less intense ride.
Grapes - also called charts, display information visually rather than by word.
__
H:
ŻŻ
Handymen - staff who do general maintence work of park grounds.
__
I:
ŻŻ
Income - money coming in (money you make), also known as revenue.
In-line-twist - rollercoaster section that flings train 360 degrees.
Interest - additional money repaid to the bank for there services.
Intensity rating - the intensity rating of a ride is how much intensity
                   your average guest experiences from a ride.
Inversions - number of complex twists and turns such as in-line-twists were
             riders are flung upside down.
__
L:
ŻŻ
Landscaping - adjusting land heights, patterns, theming planting trees etc.
Loan interest - money you pay for the privilage of having a loan.
Loans - money you have borrowed to spend on your park.
__
M:
ŻŻ
Marketing - money you spend on advertising and promoting your park.
Maximum Speed - this is the top speed a ride can go.
Mechanics - staff members who are responsible for making sure rides run safely
            and smoothly.
Music - you can add music to various rides to make them more unique.
__
N:
ŻŻ
Nauesua Rating - the nauesua rating of a ride is how sick an average guest 
                 feels after riding a particular ride.
Negative Vertical G's - the negative gravitional force exerted on each guest.
__
O:
ŻŻ
On-Ride-Photos - rollercoaster section that takes photos of guests riding 
                 train - guests later have the option of buying the photo.
__
P:
ŻŻ
Patrol - this is a function that lets certain staff members look after 
         particular parts of a park.
Park value - value of your parks land + rides + theming + shops + stalls.
Park rating - combined feeling of all guests towards your park.
Popularity - percentage of people who decide to ride a particular ride after
             thinking about it.
Positive Vertical G's - the gravitional force exerted on each guest
Profit - money you earn, income - expenenses.
__
Q:
ŻŻ
Queue lenght - lenght of queue at a particular ride.
Queues - a queue is a special type of path that guests use to enter rides.
Queue time - lenght of time a guest must queue to enter a ride.
__
R:
ŻŻ
Reliabilty - percentage of time a ride is operating.
Repay- giving money back that you have borrowed.
Research - money you spend on developing new rides, also know as R&D.
Ride lenght - the lenght in meters or feet of ride track.
Ride time - how long a ride lasts.
Running costs - cost of keeping a ride operational.
__
S:
ŻŻ
Sacking - this is were you fire a staff member
Satisfaction - how much people liked a ride after riding it.
Scenario - another word for an individual level.
Security gaurds - staff who stop people from damaging park property.
Station platform - the area guests board and exit ride trains/cars.
Stock - items each shop must buy for re-sale to guests.
__
T:
ŻŻ
Thrill rides - rides that deliver fairly high ratings - but not quite as high
               as rollercoasters.
Transport rides - rides whose primary aim is not to make money or deliver 
                  excitement, but to move guests from a to b.
__
W:
ŻŻ
Water Rides - rides based principaly around water.

______________________________________________________________________________
                          11-A - Balancing your Budget
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Some tips for balancing your budget:

o If the interest rate is high, try to pay back your loan earlier - if it is 
  low, don't worry about paying it back.

o Cut your research budget if your tight on money - you can do with what you 
  already have.

o Fire entertainers and security gaurds - you still need handymen and 
  mechanics.

o Check all ride ticket prices equal the excitement ratings
______________________________________________________________________________
                               11-B - Currencys
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
As I promised at the start, heres a currency conversion table.
 _____________ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___
|             | € | £ | $ | FF| DM| K | G | L |  |Pts|
|-------------|---|---|---|---|---|---|---|---|---|---|
|Euro (€)     |  1|  1|  1|  1|  1|  1|  1|100|100|100|
|Pound (£)    |  1|  1|  1|  1|  1|  1|  1|100|100|100|
|Dollar ($)   |  1|  1|  1|  1|  1|  1|  1|100|100|100|
|Francs (FF)  |  1|  1|  1|  1|  1|  1|  1|100|100|100|
|D. Marks (DM)|  1|  1|  1|  1|  1|  1|  1|100|100|100|
|Krona (K)    |  1|  1|  1|  1|  1|  1|  1|100|100|100|
|Guilder (G)  |  1|  1|  1|  1|  1|  1|  1|100|100|100|
|Lira (L)     |100|100|100|100|100|100|100|  1|  1|  1|
|Yen ()      |100|100|100|100|100|100|100|  1|  1|  1|
|Pesatas (Pts)|100|100|100|100|100|100|100|  1|  1|  1|
|_____________|___|___|___|___|___|___|___|___|___|___|
______________________________________________________________________________
                             12-A Version History
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
Version: 1.0
Completion: 35%
Date/Time: 4th Jan 2003

 -  Started FAQ, but quite basic still.

Version: FINAL
Completion: 100%
Date/Time: 4th July 2004

 - Pretty much finished - maybe there will be a few small updates later - but 
   main content is finished.
______________________________________________________________________________
                             12-B Full Copyright
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
 This FAQ is copyright CGorman (Ciarán Gorman) 2002, 2003, 2004. If you want 
this FAQ, just steal it and I will sue you, because it is to be exclusively 
hosted through the internet by Gamefaqs, and no other website or affliation, 
except of course any website I may own. Use of this FAQ through other mediums
such as print, is available through nogotiation. WARNING: This guide may 
contain traces of nuts!... I mean spoilers.
______________________________________________________________________________
                             12-C Contact Notice
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
 If you want to contact me you can email me at cgorman03@hotmail.com - but 
please don't send questions, I get enough as it is and this or other FAQ's 
cover pretty much all there is to ask.
______________________________________________________________________________
                                12-D Credits
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
CJayC for Gamefaqs, 
Myself for writing this guide,
Bostjan Cigan for the cheat hint,
______________________________________________________________________________
                                 12-E Outro
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
 Hope you found this guide useful, thanks for reading and good luck. You can 
visit my Gamefaqs contributor page at...

http://www.gamefaqs.com/features/recognition/15853.html

...to see my other guides. - CGorman