hide results

    FAQ/Strategy Guide by CGorman

    Version: Final | Updated: 07/04/04 | Search Guide | Bookmark Guide

    
                     R o l l e r c o a s t e r   T y c o o n   2
                    -~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-
                                      by CGorman
    ______________________________________________________________________________
                                       NOTICES                        
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    *1* - This is quite a long guide, so to find the section your looking for, you
    should use Internet Explorers "Find" Facility. Press Ctrl + F and type in the
    word you are looking for (e.g. Inverted Shuttle Coaster)
    
    *2* - I have used € in this guide! However in the game €1 = $1 = £1! For other
    countries see the currency section.
    
    *3* - Prices may not be exactly right as costs fluctuate according to terrian.
    
    *4* - For more information regarding the Roller Coasters in RCT2, check out my
    coaster construction FAQ on Gamefaqs.
    
    
     /-------------------------------IMPORTANT-----------------------------------\
     |*5* - The golden rule in this game is to charge the excitement rating as   |
     |the addmission to each ride (e.g. exitement rating: 5.73, you charge €5.70)|
     \-------------------------------IMPORTANT-----------------------------------/
    
    ______________________________________________________________________________
                                      I. General                                  
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Game...........Rollercoaster Tycoon 2
    Platform.......PC/Windows
    Type...........FAQ/Strategy Guide
    Completion.....100%
    Version........Final
    Author.........CGorman
    First Updated..4th Jan 2003
    Last Update....4th July 2004
    Email..........cgorman03@hotmail.com (see Contact Notice)
    CRP............http://www.gamefaqs.com/features/recognition/15853.html
    
    (C) Ciaran Gorman 2002 & 2003 & 2004 (See Copyright)
    ______________________________________________________________________________
                                 II. Table of Contents                            
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
     1.0 - Introduction
     2.0 - Strategy Guides (Beginner Parks)
     3.0 - Strategy Guides (Challenging Parks)
     4.0 - Strategy Guides (Expert Parks)
     5.0 - Strategy Guides (Real Parks)
     6.0 - Strategy Guides (Other Parks)
     7.0 - Rollercoasters
     8.0 - Other Rides
     9.0 - Shops/Stalls
    10.0 - General Tips/Hints
    11.0 - Finance
    12.0 - The Last Words
    ___________________
    1.0 - Introduction: 
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
          I   - General
          II  - Table of Contents
    _______________________________________
    2.0 - Strategy Guides (Beginner Parks): 
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
          (A) - Crazy Castle
          (B) - Electric Fields
          (C) - Factory Capers
    __________________________________________
    3.0 - Strategy Guides (Challenging Parks):
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
          (A) - Amity Airfield
          (B) - Botany Breakers
          (C) - Bumbly Bazaar
          (D) - Dusty Greens
          (E) - Fungus Woods
          (F) - Gravity Gardens
          (G) - Infernal Views
    _____________________________________
    4.0...Strategy Guides (Expert Parks):
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
          (A) - Alpine Adventures
          (B) - Extreme Heights
          (C) - Ghost Town
          (D) - Lucky Lake
          (F) - Rainbow Summit
    ___________________________________
    5.0...Strategy Guides (Real Parks):
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
          (A) - Six Flags Belgium
          (B) - Six Flags Great Adventure
          (C) - Six Flags Holland
          (D) - Six Flags Magic Mountain
          (E) - Six Flags over Texas
    ____________________________________
    6.0...Strategy Guides (Other Parks):
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
          (A) - Build your own Six Flags Belgium
          (B) - Build your own Six Flags Great Adventure
          (C) - Build your own Six Flags Holland
          (D) - Build your own Six Flags Magic Mountain
          (E) - Build your own Six Flags over Texas
    _____________________
    7.0...Rollercoasters: 
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
          (A1) - Air Powered Vertical Coaster
          (A2) - Bobsleigh Coaster
          (A3) - Compact Inverted Coaster
          (B1) - Corkscrew Roller Coaster
          (B2) - Floorless Roller Coaster
          (B3) - Flying Roller Coaster
          (C1) - Flying Turns
          (C2) - Giga Coaster
          (C3) - Heartline Twister Roller Coaster
          (D1) - Hypercoaster
          (D2) - Inverted Harpin Coaster
          (D3) - Inverted Impluse Coaster
          (E1) - Inverted Roller Coaster
          (E2) - Inverted Shuttle Coaster
          (E3) - Inverted Vertical Coaster
          (F1) - Junior Roller Coaster
          (F2) - LIM Launched Roller Coaster
          (F3) - Lay-down Roller Coaster
          (G1) - Looping Roller Coaster
          (G2) - Mine Ride
          (G3) - Mine Train Coaster
          (H1) - Mini Roller Coaster
          (H2) - Mini Suspended Coaster
          (H3) - Mini Suspended Flying Coaster
          (I1) - Motorbike Races
          (I2) - Multi-Dimension Roller Coaster
          (I3) - Reverse Freefall Coaster
          (J1) - Reverser Roller Coaster
          (J2) - Side-Friction Roller Coaster
          (J3) - Soap Box Derby
          (K1) - Spinning Wild Mouse
          (K2) - Sprial Roller Coaster
          (K3) - Stand-up Roller Coaster
          (L1) - Stand-up Twister Coaster
          (L2) - Steeplechase
          (L3) - Suspended Swinging Coaster
          (M1) - Twister Roller Coaster
          (M2) - Vertical Drop Roller Coaster
          (M3) - Virgina Reel
          (N1) - Water Coaster
          (N2) - Wild Mouse Coaster
          (N3) - Wooden Roller Coaster
          (O1) - Wooden Wild Mine Ride
          (O2) - Wooden Wild Mouse
    __________________
    8.0...Other Rides:
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
          (A1) - 3D Cinema
          (A2) - Boat Hire
          (A3) - Bumper Cars  
          (B1) - Chairlift 
          (B2) - Chesire Cats     
          (B3) - Circus Show  
          (C1) - Crooked House   
          (C2) - Cycle Railway 
          (C3) - Double-Deck Observation Tower
          (D1) - Elevator  
          (D2) - Enterprise     
          (D3) - Ferris Wheel 
          (E1) - Flying Saucers 
          (E2) - Ghost Train  
          (E3) - Go Karts     
          (F1) - Haunted House   
          (F2) - Haunted Mansion 
          (F3) - Hedge Maze  
          (G1) - Jet Skis   
          (G2) - Log Flume   
          (G3) - Merry-Go-Round
          (H1) - Mini Cars  
          (H2) - Mini Golf   
          (H3) - Mini Helicopters    
          (I1) - Minituare Railway  
          (I2) - Monorail   
          (I3) - Monster Trucks    
          (J1) - Motion Simulator    
          (J2) - Observation Tower 
          (J3) - Raft Ride
          (K1) - River Rapids 
          (K2) - River Ride 
          (K3) - Roto Drop   
          (L1) - Snow Cups   
          (L2) - Space Rings   
          (L3) - Spiral Slide 
          (M1) - Suspended Monorail
          (M2) - Swinging Inverted Ship 
          (M3) - Swinging Ship   
          (N1) - Tram Ride 
          (N2) - Water Coaster
          (N3) - Water Slide  
    ___________________
    9.0 - Shops/Stalls:
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
          (A1) - Balloon Stall
          (A2) - Beef Noodle Stall
          (A3) - Burger Bar
          (B1) - Candy Apple Stall
          (B2) - Cash Machine
          (B3) - Chicken Nuggets Stall
          (C1) - Coffee Shop
          (C2) - Cookie Shop
          (C3) - Cotton Candy Stall
          (D1) - Donut Shop
          (D2) - Drink Stall
          (D3) - First Aid Station
          (E1) - Fried Chicken Stall
          (E2) - Fried Rice Noodles Stall
          (F1) - Fries Stall
          (F2) - Fruity Ices Stall
          (F3) - Funnel Cake Shop
          (G1) - Hat Stall
          (G2) - Hot Chocolate Stall
          (G3) - Hot Dog Stall
          (H1) - Ice Cream Cone Stall
          (H2) - Iced Tea Stall
          (H3) - Information Kiosk
          (I1) - Lemonade Stall
          (I2) - Meatball Soup Stall
          (I3) - Pizza Stall
          (J1) - Popcorn Stall
          (J2) - Pretzel Stall
          (J3) - Restroom
          (K1) - Restroom 2
          (K2) - Roast Sausage Stall
          (K3) - Seafood Stall
          (L1) - Souvenir Stall
          (L2) - Soybean Milk Stall
          (L3) - Star Fruit Drink Stall
          (M1) - Sub Sandwich Stall
          (M2) - Sujongkwa Stall
          (M3) - Sunglasses Stall
          (N1) - T-Shirt Stall
          (N2) - Wonton Soup Stall
    __________________________
    10.0 - General Tips/Hints:
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
          (A) - Staff Organisation
          (B) - Queues
          (C) - Adding Excitment to Rides
          (D) - Q&A (technical questions & general)
          (E) - Reader Contributions
          (F) - Websites/Links
          (G) - Rest in Series
          (H) - Cheats/Easter Eggs
          (I) - Park Awards
          (J) - Term Dictionary/Information
    _______________
    11.0 - Finance:
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
          (A) - Balancing your Budget
          (B) - Currencys
    ______________________
    12.0 - The Last Words:
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
          (A) - Version History
          (B) - Full Copyright
          (C) - Contact Notice
          (D) - Credits
          (E) - Outro
    ______________________________________________________________________________
                                    2-A Crazy Castle
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Task......................You have inherited a large castle - your job 
                                    is to convert it into a small theme park. 
    Objectives......................To have at least 1,500 guests in your park at
                                    the end of October, Year 4, with a park rating
                                    of at least 600.
    Initial Guests in Park..........2
    Initial Rating..................500
    Park Size.......................690,800 sq.ft
    Initial Cash....................€10,000
    Initial Debt....................€10,000 
    Debt Rate.......................at 5% per year
    Initial Company Value...........€14
    Initial Park Value..............€14
    Buy Land........................Yes - at €75 per square
    Buy Construction Rights.........No
    Profit System...................Free to enter, Pay for Rides
    Rides Already Built.............None
    
    o Crazy Castle is a fairly easy park. The main thing to remember is to keep
      the theme of a castle - don't go off building space themed rocket coasters
      - that is a waste of time.
    
    o To start, build a few (2 or 3) gentle rides. Make sure to spread them evenly
      around the park. There is no need to theme them with castle themeing until
      year two or three because a) you can't afford it, b) your guest numbers are
      low, and c) your time is not worth it.
    
    o Next thing, build a medium sized roller coaster inside the walls of the
      castle (medium intensity). Make sure the excitement rating is fairly high
      because you will always charge it as the entrance fee (e.g. excite. rate.
      5.78, you charge €5.80).
    
    o Next build another rollercoaster outside the walls of the castle to again
      create a good source of income.
    
    o Don't be afraid to borrow - your aim is guest figures, not low debt figures.
      Use some of your extra cash from debt to finance big rides such as log 
      flumes. Spread these big rides throughtout the park and build lots of little
      rides around them. These major rides attract guests and create profit, the 
      little rides create money and distract guests from the big rides (so queues 
      stay shorter).
    
    o Make sure to build the big rides FIRST and base the small rides around them 
      - not the other way round, because it is easier to move small rides than big
      ones.
    
    o Hire plenty of staff, again guest attraction and satisfaction are more 
      important than long term cashflow stability.
    
    o Make sure to build a few shops and stalls - again spread them out, food 
      courts lock nice, but only work (make money) with over a thousned guests or
      so. 
    
    o When you have several rides you can do a bit of themeing around those 
      smaller rides. Also do up your queues and paths because guest satisfaction
      comes first.
    
    o Your advertising and marketing spending should be kept high from early Year
      3. You must be aiming to have 1,000 guests or more by the end of Year 3 if 
      you want to succeed in this level.
    
    o Continue rapid expansion of big rides and advertising till the end. If you
      are struggling to get the 1,500 guests by the end of Year 4, cut ride
      entrance fees and boost your park rating (that attracts guests) by hiring 
      lots of staff.
    ______________________________________________________________________________
                                  2-B Electric Fields
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Task......................You have inherited a small farm and your 
                                    challenge is to build it into a small theme
                                    park amongst the fields and farm buildings.
    Objectives......................To have at least 700 guests in your park by 
                                    the end of October Year 2 with a park rating 
                                    of 600.
    Initial Guests in Park..........40
    Initial Rating..................434
    Park Size.......................485,650 sq.ft
    Initial Cash....................€10,000
    Initial Debt....................€10,000 
    Debt Rate.......................at 5% per year
    Initial Company Value...........€7,930
    Initial Park Value..............€7,930
    Buy Land........................No
    Buy Construction Rights.........No
    Profit System...................Free to enter, Pay for Rides
    Rides Already Built.............Rowing Boats 1
    
    o Ok this park is rather underdeveloped - theres only one ride - so in the 
      first few months concentrate on rapidly building rides to bring up guest 
      numbers - don't be too concerned about profit and cash levels.
    
    o First thing to do is to raise the ticket price of Rowing Boats 1 to €2.20
      (its excitement rating) then build a few (at least 2) small/medium 
      rollercoasters and one large one - spend at least €12,000 on these coasters.
    
    o Make sure to place a Information Kiosk at the entrance to generate revenue
      from map sales.
    
    o Build some thrill rides around the rollercoasters - this prevents 
      rollercoaster queues from getting too long and also generates lots of money.
    
    o Stick to pre-designed rides and rollercoasters - you don't have time to 
      waste designing fancy track layouts - and you don't have the money either!
    
    o Build a few food and drink stalls scattered throughout the park. They are 
      unlikely to make money until Year 2, but they will keep the guests happy 
      which is your main objective on this particular level. Similerly build 
      plenty of toilets and other aminities such as cash-machines and first aid
      rooms.
    
    o Keep building right throught the game - the bigger the park - the more 
      guests you will attract. Even small rides will boost your park - however
      save up every now and then for a new 'Mega' attraction - one that will 
      attract guests just for it.
    
    o Spend most of your income on new rides and keep borrowing, but don't neglect
      hiring staff such as entertainers - guest satisfaction is worth more than a 
      second merry-go-round and also spend a large amount on advertising and park
      promotion - use the marketing option to offer 'free rides' all the time on 
      your best rollercoasters and keep your advertising campaigns running year 
      round.
    
    o Remember your primary objective - guests numbers and satisfaction - bad 
      paths, little staff, no food etc., deters and angers guests - new rides, 
      straight paths, interesting foods please and attract guests.
    ______________________________________________________________________________
                                   2-C Factory Capers
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Task......................An abandoned factory complex is an opportunity
                                    to build a mechanical-themed amusement park. 
    Objectives......................To have at least 1,100 guests in your park by
                                    October Year 3 and achieve a park rating of 
                                    600.
    Initial Guests in Park..........0
    Initial Rating..................0
    Park Size.......................527,890 sq.ft
    Initial Cash....................€10,000
    Initial Debt....................€10,000 
    Debt Rate.......................at 5% per year
    Initial Company Value...........€0
    Initial Park Value..............€0
    Buy Land........................No
    Buy Construction Rights.........No
    Profit System...................Pay to enter, Free rides
    Rides Already Built.............None
    
    o Start off by building a few major rollercoasters (borrow €5,000-€6,000 if 
      you need to) - like the previous two parks, your aim is guests not money
    
    o You have more time this time so you can afford to design rides and your
      path routes (keep paths simple). You can afford to build an extensive
      transport system which will generate lots of cash for park expanision.
    
    o There is no need to spend heavily on marketing for the first two years - 
      concentrate on attracting guests by good rides not good adverts.
    
    o Since you have more time, you can afford to develop the factory theme in
      the park, however don't spend too much over a couple of thousend to develop
      your themeing because your money is better spent on rides.
    
    o Fill the park with thrill rides and rollercoasters - gentle rides will 
      generally look out of place in this park.
    
    o In the finally year you can start to market the park a bit more if your
      guest numbers are falling short.
    ______________________________________________________________________________
                                   3-A Amity Airfield
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Task......................Build a flying-themed amusement park in this
                                    abandoned airfield.
    Objectives......................To have at least 3,000 guests in your park by 
                                    the end of October Year 4 and your park rating
                                    must be at least 600.
    Initial Guests in Park..........0
    Initial Rating..................0
    Park Size.......................1,235,630 sq.ft
    Initial Cash....................€10,000
    Initial Debt....................€10,000
    Debt Rate.......................at 10% per year
    Initial Company Value...........€0
    Initial Park Value..............€0
    Buy Land........................No
    Buy Construction Rights.........No
    Profit System...................Free to enter, Pay for Rides
    Rides Already Built.............None
    
    o This is a large park, so you can spread your rides out and think big. Build
      a few large rollercoasters to start - borrow a few thousned.
    
    o A good transport system is needed in this park - to both help guests and rob
      them of there free cash! Build a few stations if possible.
    
    o Since this level is fairly long (4 years), it is worth looking and minding 
      the finances early on. In the first few parks I told you to expand at all 
      costs to attract guests - the money was'nt going to be a problem - well now
      it will be because you have to finance the park for a much longer period.
    
    o Repay your loan (or keep it low) because an interest rate of 10% is costly
      (€15,000 loan = interest of €6,000 over 4 years) - maybe aim to knock a
      thousned off every three months. However if you really need the money, don't
      hesitate in borrowing.
    
    o No need to start marketing the park till the end of year 2 because new rides
      alone will attract plenty of guests early on.
    
    o Don't forget to build shops and stalls, because like I said money can be 
      difficult in this level and shops and stalls generate cash flow.
    
    o Build a few information Kiosks because like I said this is a big park and
      guests will get lost.
    ______________________________________________________________________________
                                  3-B Botany Breakers
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Task......................Your challenge is to build a high-profit park
                                    on this paradise island.
    Objectives......................To achieve a ticket income of €10,000 per
                                    month.      
    Initial Guests in Park..........0
    Initial Rating..................0
    Park Size.......................548,240 sq.ft
    Initial Cash....................€10,000
    Initial Debt....................€10,000
    Debt Rate.......................at 10% per year
    Initial Company Value...........€0
    Initial Park Value..............€0
    Buy Land........................No
    Buy Construction Rights.........No
    Profit System...................Free to enter, Pay for Rides
    Rides Already Built.............None
    
    o Unlike the earlier levels your STATED aim is not guest numbers or happiness,
      but profit - however don't work towards profit - it will only come if you 
      can build guest numbers.
    
    o The terrain in this park is tough to build on and expensive. Build two very
      good rollercoasters in the center of the island to start and link them to 
      the path. For the next year just build thrill rides and gentle rides because
      as you will see rollercoaster construction is very very expensive - so those
      first two better be good!
    
    o Concentrate on rides with high excitement ratings and short ride times
      because you can charge most for these and get through lots of people. When
      your building a custom-desiged rollercoaster or other such ride make sure
      to select the highest number of cars, trains, boats etc possible for that
      ride because the more capacity - the more paying guests you can have per
      hour on that ride.
    
    o Althought the aim is ticket sales, shop sales won't make you any poorer! 
      Make sure to build enough to keep guests happy (but not to many, they cost
      money to build)
    
    o Invest every single euro in new rides - not fancy themeing, fancy path 
      layouts or redisigning old rides - the simple fact is you cannot clear this
      park with just 10 or 11 rides (well not very easily) you need 20, 30 or 
      more!
    
    o Don't advertise - need rides will do that for you. Also keep staff numbers
      low (except mecanics... so no entertainers, only a few security gaurds and
      handymen and plenty of mecanics.)
    ______________________________________________________________________________
                                    3-C Bumbly Bazaar
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Task......................Starting with a small market bazaar, your 
                                    challenge is to increase the profit from shops
                                    and stalls by building rides and 
                                    rollercoasters to attract coustomers.
    Objectives......................To achieve a stall income of €1,000 per month.
    Initial Guests in Park..........41
    Initial Rating..................467
    Park Size.......................1,013,100 sq.ft.
    Initial Cash....................€10,000
    Initial Debt....................€10,000
    Debt Rate.......................at 10% per year
    Buy Land........................No
    Buy Construction Rights.........No
    Profit System...................Free to enter, Pay for Rides
    Rides Already Built.............None only shops
    
    o Again unlike the last few parks you have a new objective - stall income. 
      Like I said about Botany Breakers, don't worry about the objective -
      concentrate on guest numbers - 500 guests spending €0.75 each on average is 
      not as good as 1,500 guests spending €0.50 each on average - so build rides
      and market the park early on instead of new shops.
    
    o Spread out your stalls through-out the park to maximise sales. Also don't
      keep building the same stall and have 'Sunglasses Stall 1'...2...and 3, 
      build different stalls throughout the park - the same person will buy a hat,
      glasses, a map and a souvenior - not 4 pairs of glasses.
    
    o Foodcourts only work after guest numbers have reached about 2,000
    ______________________________________________________________________________
                                    3-D Dusty Greens
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Task......................Situated near a highway junction in the 
                                    desert, Dusty Greens is an opportunity to 
                                    develop a small golf course into a thriving 
                                    theme park.
    Objectives......................To achieve a ticket income of €5,000 per 
                                    month.
    Initial Guests in Park..........79
    Initial Rating..................605
    Park Size.......................219,120 sq.ft.
    Initial Cash....................€10,000
    Initial Debt....................€10,000
    Debt Rate.......................at 10% per year
    Initial Company Value...........€7,933
    Initial Park Value..............€7,933
    Buy Land........................Yes
    Buy Construction Rights.........Yes
    Profit System...................Free to enter, Pay for Rides
    Rides Already Built.............Mini Golf 1
                                    Mini Golf 2
    
    o Firstly demolish both Mini Golfs and build rollercoasters in their place -
      how many mini golfs have you met so far that match a rollercoasters 
      profitability? 
    
    o After those 2 rollercoasters only build small thrill rides and gentle rides
      or (very small rollercoasters such as wild mouses) because space is at a 
      premium.
    
    o The ideal ride has a high excitement rating ( = high addmission price) and a
      short duration (more guests per hour) - such as wild mouses and thrill rides
      such as launched freefall. 
    
    o After a year or two check to see what your most profitably ride is (other 
      than the two rollercoasters) - then build one the exact same as it at the
      other side of the park.
    ______________________________________________________________________________
                                    3-E Fungus Woods
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Task......................Restricted to only older-style wooden rides, 
                                    your challenge is to build a thriving theme
                                    park in Fungus woods.
    Objectives......................To have at least 2,500 guest in your park by 
                                    the end of October Year 4 with a park rating 
                                    of at least 600.
    Initial Guests in Park..........24
    Initial Rating..................309
    Park Size.......................523,380 sq.ft.
    Initial Cash....................€10,000
    Initial Debt....................€10,000
    Debt Rate.......................at 10% per year
    Initial Company Value...........€6,638
    Initial Park Value..............€6,638
    Buy Land........................No
    Buy Construction Rights.........No
    Profit System...................Pay to enter, Free for Rides
    Rides Already Built.............Merry-Go-Round 1
    
    o Firstly build a few (at least 2) good wooden rollercoasters - these will
      attract guests to the park and keep several hundred happy at any given time
      (in a park without ride addmissions income and a guest no. objective - the
      fewer expensive running-cost rides the better). Think of it this way your
      objective is to entertain (or atleast occupy) your 2,500 guests all at the
      same time - which way is best - 30 small rides costing €46.90 each to run
      or 7 large ones costing €150 each to run. My calculator says the 7 large 
      ones.
    
    o Market your big rides heavily - your aim is guest numbers. Also hire plenty
      of staff, guest happiness is important.
    
    o Cut your research budget, you won't need and can't build many of the new
      rollercoasters - so theres no point spending money to discover them.
    ______________________________________________________________________________
                                  3-F Gravity Gardens
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Task......................Your challenge is to build a roller coaster 
                                    park in the beautiful Gravity Gardens - No 
                                    other rides, just Roller Coasters.
    Objectives......................To achieve a park value of at least €500,000
                                    and repay your loan.
    Initial Guests in Park..........117
    Initial Rating..................776
    Park Size.......................1,676,400 sq.ft
    Initial Cash....................€10,000
    Initial Debt....................€10,000
    Debt Rate.......................at 8% per year
    Initial Company Value...........€45,082
    Initial Park Value..............€45,082
    Buy Land........................No
    Buy Construction Rights.........No
    Profit System...................Pay to enter, Free for Rides
    Rides Already Built............."Treetop Flyer" (Wooden Roller Coaster)
    
    o  This is a really great park. You have no time limit, and a hugh amount of
       space. The landscape offers many opportunities to build interesting roller
       coasters. Unfortuatly you are ONLY allowed to build Roller Coasters. 
    
    o  Start by borrowing the maximum loan of €45,000 and building a substantial
       roller coaster that has been pre-designed - preferably a corkscrew or 
       twister. 
    
    o  Immidiatly add another two slightly smaller roller coasters. Make sure to
       spread your roller coasters out through the park, this will eliminate 
       Guests leaving the park quickly or refusing to pay a large entrance fee.
    
    o  You now have 4 roller coasters in opperation, so perhaps increase the
       entrance fee to €15 or €20.
    
    o  Depending on how intense your coasters are, guests will start to complain
       about the paths being disgusting. Add plenty of benchs and bins outside 
       ride exits and hire a few Handymen. Also hire one/two security gaurds, 
       an entertainer and two/three mechanics - a roller coaster park needs 
       plenty of mechanics.
    
    o  Income will slowly start to climb up - €2,000, €3,000, €4,000. However as
       visiter numbers cross 500 and eventually 1,000, you should add an 
       information kisok near the entrance to supplement your income. Also start
       building tolits across the park - charge 20c entrance for each.
    
    o  The next problem will be the complaints "I'm Thirsty" - note NOT "I'm 
       hungry." So start building a few Wanton Soap Stalls, Drinks Stalls, Hot 
       Chocolates Stalls, Iced Tea Stalls and Lemonade Stalls throughout the park.
    
    o  To start pulling in the big money you will need to increase your entrance 
       fee to over €50 - but people will only pay this if you can offer plenty of
       rides. But to build rides you need money. So firstly start advertising the
       park, raise the entrance fee to €25 and start building a few smallish
       roller coasters - Wooden Wild Mouse, Wild Mouse, Junior Roller Coaster,
       Mini Roller Coaster etc. As your number of Roller Coasters increases, 
       slowly raise your entrance fee in line with coasters, as you hit about 
       10-12 coasters you can rise to €50.
    
    o  As your income tops out at €10,000 a month, start adding food stalls and
       gift stalls throughout the park. This will hopefully add another €750 to
       the bottom line. 
    
    o  Start to market yourself even more aggresively and continue building new
       roller coasters - 1 per month at a cost of perhaps €9-€15k each. 
    
    o  There is no need to pay off your debt for the moment before you ask. It
       does not decrease your park value.
    
    o  Build an ATM beside your entrance and main food areas, this is because when
       your entrance fee hits €60, people start running out of money.
    
    o  Continue the building until you hit a park value of €500,000 then start
       paying off your death.
    ______________________________________________________________________________
                                  3-G Infernal Views
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Task......................A park nestled percariously on lava rock with
                                    streams of magma.
    Objectives......................To have at least 10 different rollercoasters 
                                    with excitement ratings of at least 6.00
    Initial Guests in Park..........67
    Initial Rating..................459
    Park Size.......................1,257,960 sq.ft.
    Initial Cash....................€10,000
    Initial Debt....................€10,000
    Debt Rate.......................at 10% per year
    Initial Company Value...........€43,039
    Initial Park Value..............€43,039
    Buy Land........................No
    Buy Construction Rights.........No
    Profit System...................Free to enter, Pay for Rides
    Rides Already Built.............Wooden Roller Coaster 1
    
    o Aim to build at least 3 rollercoasters a year (if not more) over excitment
      rating 6.00. 
    
    o Don't waste time on rollercoasters under 6.00. You have'nt the money or time
      to spare.
    
    o Just because your objective is rollercoasters, don't ignore thrill/gentle
      rides - they can produce the revenue to pay for expensive rollercoasters.
    
    o Don't custom design the coasters if possible - a) you cannot predict if they
      will have a high enough excitement rating or not, b) it is more expensive to
      custom design rides, and c) it is time consuming.
    
    o The simplist way to complete your task is to build the 10 cheapest pre-made
      rollercoasters over excitement rating 6.00.
    
    o Don't forget you've a park to run! Devot at least 30% of your time to 
      managing money, staff, attracting guests and solving problems.
    ______________________________________________________________________________
                                  4-A Alpine Adventures
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Task......................Convert a small mountain ski resort into a
                                    snow-themed amusemant park.
    Objectives......................To achieve a ticket income of €7,000 per 
                                    month.     
    Initial Guests in Park..........13
    Initial Rating..................250
    Park Size.......................1,034,660 sq.ft.
    Initial Cash....................€10,000
    Initial Debt....................€10,000
    Debt Rate.......................at 8% per year
    Initial Company Value...........€84
    Initial Park Value..............€84
    Buy Land........................No
    Buy Construction Rights.........No
    Profit System...................Free to enter, Pay for Rides
    Rides Already Built.............Chairlift 1
    
    o Firstly up the ticket price of Chairlifts 1 to reflect its excitement 
      rating.
    
    o Ignore the idea of a "snow themed" park, just build lots of high profit 
      rides - don't waste time themeing your park.
    
    o The terrain is tricky to build on snd you don't want expensive high supports
      - so when building rollercoasters, custom design them - the premade ones 
      will be very expensive due to high supports.
    
    o Build plenty of thrill rides with high excitement ratings - not low 
      excitement gentle rides because the higher the rating - the higher the ride
      income.
    
    o Borrow only to finance the major rollercoasters - not small rides, small 
      rides should be paid for by cashflow.
    
    o Hire plenty of mechanics - you want all your rides running at all times to
      keep making money.
    
    o Advertise to boost guest numbers - the more guests the more money you can
      make.
    
    o After you've built a good few rides, go to your older rides and check the
      ticket price equals the excitement ratings because as more rides are built
      around one another - their ratings increase - and if you can boost ticket 
      prices by 10c each your overall ride income will dramatically increase.
    ______________________________________________________________________________
                                  4-B Extreme Heights
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Task......................Free of financal restrictions, your challenge 
                                    is to expand this desert park to attract 
                                    people seeking the ultimate thrill.
    Objectives......................To have at least 4,500 guests in your park and
                                    to keep the park rating above 700.     
    Initial Guests in Park..........165
    Initial Rating..................780
    Park Size.......................2,328,810 sq.ft.
    Buy Land........................No
    Buy Construction Rights.........No
    Notable point...................No Money/Unlimited Funds park
    Profit System...................Free to enter, Free for Rides
    
    o This park is very easy because you don't have to manage money - however you
      must keep ratings above 700 at ALL times - this is hard enough.
    
    o Firstly hire plenty of staff - entertainers, handymen, mechanics and 
      security gaurds. Also start laying straight forward paths and building
      plenty of toilets, stalls and first aid rooms. These will keep your task
      of keeping the park ratin above 700 easy.
    
    o Build, build, build all sorts of rides - thrill rides, water rides, gentle
      rides and rollercoasters - you want to attract all sorts of people.
    
    o Build plenty of exciting rollercoasters to attract guests. Build toilets,
      benchs, bins and first aid rooms at all intense ride exits to keep vomit 
      levels low on the streets.
    
    o Theme your park to increase your park rating.
    
    o Aim to achieve a park rating of 999 - if you aim and fall short - you will
      still have a high enough rating to win - set your sights high always to win
      - be ambitious.
    ______________________________________________________________________________
                                     4-C Ghost Town
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Task......................Hired by a large amusement park chain, your
                                    task is build a giant rollercoaster park 
                                    around an abandoned mine.
    Objectives......................To have 10 different types of rollercoasters
                                    with minimum lengths of 3,937 feet and 
                                    excitement ratings of 7 and over.
    Initial Guests in Park..........0
    Initial Rating..................0
    Park Size.......................510,310 sq.ft.
    Initial Cash....................€10,000
    Initial Debt....................€10,000
    Debt Rate.......................at 7% per year
    Initial Company Value...........€0
    Initial Park Value..............€0
    Buy Land........................No
    Buy Construction Rights.........No
    Profit System...................Free to enter, Pay for Rides
    Rides Already Built.............None
    
    o It would be nice to build a nicely themed park with wooden rollercoasters
      and western theming - but that takes time. The quickest route to success is
      building plenty of pre-designed new rollercoasters.
    
    o As I said earlier don't waste your time on any coaster under 7.00 excitement
      rating because thats a waste of money and time. Also don't build any coustom
      rollercoasters - because if you fail to get the 7 rating then it proves a 
      massive waste of time and money.
    
    o You need plenty of money to pay for your rollercoasters - so get guest 
      numbers up - but ignore your ratings because guests will spend the same 
      whether your rating is 500 or 900.
    
    o The interest rate is fair enough - so take advantage of it to borrow plenty
      of money to build rollercoasters.
    
    o A few high excitement thrill rides will generate important cash for new 
      rollercoasters. However don't spend to long building these.
    ______________________________________________________________________________
                                     4-D Lucky Lake
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Task......................With unlimited funds but a challenging lake
                                    location, to expand and manage
    Objectives......................To have 2,100 guests and a park rating above 
                                    700 at all times.
    Initial Guests in Park..........129
    Initial Rating..................751
    Park Size.......................662,310 sq.ft.
    Buy Land........................No
    Buy Construction Rights.........No
    Notable point...................No Money/Unlimited Funds park
    Profit System...................Free to enter, Free for Rides
    Rides Already Built.............Mine-Train-Twister 1
                                    Merry-Go-Round 1
                                    Twist 1
    
    o This park is again very easy because you don't have to manage money - 
      however again you must keep ratings above 700 at ALL times.
    
    o Hire plenty of staff - entertainers, handymen, mechanics and 
      security gaurds. Lay straight forward paths across the lake that are easy 
      for guests to navigate. Build plenty of toilets, stalls and first aid 
      rooms to keep the park rating above 700.
    
    o Build a few thrill rides and gentle early to keep guests occupied until
      you can build a few major rollercoasters.
    
    o Build plenty of massive rollercoasters to attract guests. Build toilets,
      benchs, bins and first aid rooms at all intense ride exits to keep vomit 
      levels low on the streets.
    
    o Build a transport network to make park navigation easier for guests.
    ______________________________________________________________________________
                                   4-E Rainbow Summit
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Task......................Build on a hillside, this park is forbiddin 
                                    from building anything tall. Can you expand 
                                    the park and make it successful?
    Objectives......................To have at least 2,500 guest in your park at 
                                    the end of October Year 4 and the park rating
                                    must be at least 600.
    Initial Guests in Park..........286
    Initial Rating..................768
    Park Size.......................1,234,420 sq.ft.
    Initial Cash....................€10,000
    Initial Debt....................€10,000
    Debt Rate.......................at 5% per year
    Initial Company Value...........€80,315
    Initial Park Value..............€80,315
    Buy Land........................No
    Buy Construction Rights.........No
    Profit System...................Pay to enter, Free for Rides
    Rides Already Built.............Chairlift 1
                                    Trams 1
                                    Wooden Rollercoaster 1
    
    o Borrow plenty to finance rollercoasters (all coustom made due to the height
      restriction) - the interest rate is very cheap at 5%.
    
    o Build plenty of thrill rides and gentle rides because they are easy to build
      and meet the height restriction.
    
    o Since the range of rides you can (easily) build is low - theme your park to 
      attract guests.
    
    o Build rollercoasters beside one another to boost their individual excitement
      rating. 
    
    o Gradually raise the entrance price - maybe by €15 every year - however don't
      go over €60ish because some guests don't bring anything over €60 and thus
      must turn around and go home.
    ______________________________________________________________________________
                                   5-A Six Flags Belgium
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Task......................Try your hand at running and improving this 
                                    Six Flags Park
    Objectives......................To have at least 3,500 guest in your park at 
                                    the end of October Year 4 and the park rating
                                    must be at least 600.
    Initial Guests in Park..........1592
    Initial Rating..................999
    Park Size.......................1,137,950 sq.ft.
    Initial Cash....................€10,000
    Initial Debt....................€10,000
    Debt Rate.......................at 7% per year
    Initial Company Value...........€372,048
    Initial Park Value..............€372,048
    Buy Land........................Yes
    Buy Construction Rights.........No
    Profit System...................Pay to enter, Free for Rides
    Rides Already Built.............Calamity Mine 
                                    Cheshire Cats 1
                                    Cobra
                                    Enterprise 1
                                    Flash Back
                                    Ferry's Wheel
                                    Loup-Garou
                                    Magic Carpet 1
                                    Merry-Go-Round 1
                                    Pirate Ship 1
                                    Radja River
                                    Six Flags Express
                                    The Screamer
                                    Tornado
                                    Turbine
                                    Twist 1
                                    Vampire
                                    Vintage Cars 1
    
    o This level is more about running and managing than expanding your park. So
      instead of building loads of new rides, spend your time and money marketing,
      hiring staff and managing money.
    
    o Keep the entrance fee as low as possible to attract guests - your aim is 
      guest numbers not money.
    
    o You can build a few rides - not many - but make sure to theme them nicely so
      they merge well with the park. 
    
    o Listen to guest complaints such as those about hunger, thrist and lack of
      toilets - remember the park rating is important.
    
    o Hire plenty of staff to keep things running smoothly.
    ______________________________________________________________________________
                             5-B Six Flags Great Adventure
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Task......................Build the missing Six Flags rides, or create
                                    your own to improve the park! But don't forget 
                                    your ultimate aim - to attract more guests to
                                    the park.
    Objectives......................To have at least 3,000 guest in your park and 
                                    the park rating must'nt drop below 700.
    Initial Guests in Park..........1931
    Initial Rating..................896
    Park Size.......................2,020,590 sq.ft.
    Initial Cash....................€10,000
    Initial Debt....................€10,000
    Debt Rate.......................at 10% per year
    Initial Company Value...........€426,027
    Initial Park Value..............€426,027
    Buy Land........................No
    Buy Construction Rights.........No
    Profit System...................Pay to enter, Free for Rides
    Rides Already Built.............Big Wheel
                                    Blackbeards Lost Treasure Train
                                    Buccaneer
                                    Carousel
                                    Congo Rapids
                                    Go Karts 1
                                    Great American Scream Machine
                                    Medusa
                                    Nitro
                                    Rolling Thunder [Track 1]
                                    Rolling Thunder [Track 2]
                                    Runaway Mine Train
                                    Skull Mountain
                                    Skyride 1
                                    Skyride 2
                                    Space Shuttle
                                    The Twister
    
    o Again this level is more about running and managing than expanding your 
      park. So only build a few rides each year.
    
    o Assign mechanics to specific rollercoasters - breakdowns will cause chaos
      in this level.
    
    o Keep entrance costs low to keep guest numbers up. Also build plenty of 
      toilets, stalls etc., to keep guests happy.
    ______________________________________________________________________________
                                 5-C Six Flags Holland
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Task......................Try your hand at running and improving this 
                                    Six Flags Park
    Objectives......................To have at least 3,500 guest in your park at 
                                    the end of October Year 4 and the park rating
                                    must be at least 600.
    Initial Guests in Park..........1325
    Initial Rating..................943
    Park Size.......................1,281,390 sq.ft.
    Initial Cash....................€10,000
    Initial Debt....................€10,000
    Debt Rate.......................at 6% per year
    Initial Company Value...........€398,068
    Initial Park Value..............€398,068
    Buy Land........................No
    Buy Construction Rights.........No
    Profit System...................Pay to enter, Free for Rides
    Rides Already Built.............Capitian Kid
                                    Cavalli Borocca
                                    Crazy River
                                    El Condor
                                    El Rio Grande
                                    Excalibur
                                    Flying Dutchman Gold Mine
                                    G-Force
                                    Goliath
                                    Il Gladiatore
                                    La Grade Roue
                                    La Via Volta
                                    Le Tours Des Jardins
                                    Les Petils Cheveux
                                    Les Sombreros
                                    Merlins Magic Castle
                                    Robin Hood
                                    Six Flags Express
                                    Space Shoot
    
    o The interest rate is low so you can borrow to help pay for marketing and
      staff expenses.
    
    o Again build only a few new big rides, try to keep them to the back of the
      park - this causes guests to spend longer in the park.
    
    o Hire plenty entertainers and assign them to the busy queues to keep guests
      happy.
    ______________________________________________________________________________
                               5-D Six Flags Magic Mountain
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Task......................Build the missing Six Flags rides, or create
                                    your own to improve the park! But don't forget 
                                    your ultimate aim - to repay your loan while 
                                    keeping the park value up!
    Objectives......................Achieve a park value of €700,000 and repay 
                                    your loan.
    Initial Guests in Park..........2,781
    Initial Rating..................697
    Park Size.......................2,216,720 sq.ft.
    Initial Cash....................€10,000
    Initial Debt....................€50,000
    Debt Rate.......................5% per year
    Initial Company Value...........€764,261
    Initial Park Value..............€804,261
    Buy Land........................No
    Buy Construction Rights.........No
    Profit System...................Pay to enter, Free for Rides
    Rides Already Built.............Arrowhead Splashdown
                                    Buccaneer
                                    Circus 1
                                    Colossus [Track 1]
                                    Colossus [Track 2]
                                    Crooked House 1
                                    Cyclone 500
                                    Dé ja Vu
                                    Enterprise 1
                                    Ferris Wheel 1
                                    Flashback
                                    Gold Rusher
                                    Goliath
                                    Grand Carousel
                                    Granny Gran Prix
                                    Haunted House 1
                                    Log Jammer
                                    Metro
                                    Motion Simulator 1
                                    Ninja
                                    Orient Express 1
                                    Orient Express 2
                                    Psyclone
                                    Revolution
                                    Roaring Rapids
                                    Sandblaster
                                    Sky Tower
                                    Swashbuckler
                                    The Escape [Track 1]
                                    The Escape [Track 2]
                                    Tidal Wave
                                    Twist 1
                                    Twist 2
                                    Viper
    
    o Your park value must stay above €700,000 - so don't just sell off all your 
      rides - however it is worth selling one or two (a park value of exactly 
      €700,000 will do) - but make sure they are two of the least profitably
      rides.
    
    o Raise your entrance fee if guests are coming to your park in droves - 
      however don't let it get much higher than €60.
    
    o Build shops and stalls to generate extra money. However close any that still
      lose money after 6 months.
    
    o Spend pretty much all your income on reducing your debt. This park is 
      relatively easy - its just a matter of patience.
    ______________________________________________________________________________
                                 5-E Six Flags over Texas
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Task......................Build the missing Six Flags rides, or create
                                    your own to improve the park! But don't forget 
                                    your ultimate aim - to attract more guests to
                                    the park.
    Objectives......................To have at least 3,500 guest in your park and
                                    the park rating must'nt drop below 700.
    Initial Guests in Park..........1,684
    Initial Rating..................900
    Park Size.......................1,590,600
    Initial Cash....................€10,000
    Initial Debt....................€10,000
    Debt Rate.......................at 12% per year
    Initial Company Value...........€449,582
    Initial Park Value..............€449,582
    Buy Land........................No
    Buy Construction Rights.........No
    Profit System...................Pay to enter, Free for Rides
    Rides Already Built.............Bumper Cars
                                    Conquistador
                                    Flashback
                                    Go Kart Track
                                    Judge Roy Scream
                                    La Vilrora
                                    Missile Chaser
                                    Oil Derrick
                                    Ozarka Splash
                                    Railroad
                                    Roaring Rapids
                                    Shockwave
                                    Silver Star Carousel
                                    Splash Water Falls
                                    Texas Giant
                                    Titan
    
    o Build a few rides but not many. The majority of your money should be spent
      on attracting guests and keeping them happy.
    
    o Don't borrow much because the interest rate is very very high at 12% per
      year.
    
    o Keep maintence of rides a priority because guest satisfaction is very 
      important.
    ______________________________________________________________________________
                         6-A Build your own Six Flags Belgium
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Task......................Build your own version of this European Six
                                    Flags Park.
    Objectives......................To have at least 3,500 guests by the end of 
                                    October, Year 5 with a park rating of at least
                                    600.
    Initial Guests in Park..........0
    Initial Rating..................0
    Park Size.......................1,137,920 sq.ft.
    Initial Cash....................€10,000
    Initial Debt....................€10,000
    Debt Rate.......................at 7% per year
    Initial Company Value...........€0
    Initial Park Value..............€0
    Buy Land........................No
    Buy Construction Rights.........No
    Profit System...................Pay to enter, Free for Rides
    Rides Already Built.............None
    
    o The build your own parks are open books - just expand, build and market.
    ______________________________________________________________________________
                     6-B Build your own  Six Flags Great Adventure
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Task......................Use your design skills to recreate this Six
                                    Flags Park.
    Objectives......................To have at least 2,500 guests by the end of 
                                    October, Year 5 with a park rating of at least
                                    600.
    Initial Guests in Park..........0
    Initial Rating..................0
    Park Size.......................2,020,590 sq.ft
    Initial Cash....................€10,000
    Initial Debt....................€10,000
    Debt Rate.......................at 10% per year
    Initial Company Value...........€0
    Initial Park Value..............€0
    Buy Land........................No
    Buy Construction Rights.........No
    Profit System...................Pay to enter, Free for Rides
    Rides Already Built.............None
    
    o The build your own parks are open books - just expand, build and market.
    ______________________________________________________________________________
                           6-C Build your own Six Flags Holland     
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Task......................Build this European Six Flags Park the way you
                                    want to.
    Objectives......................To have at least 3,500 guests by the end of 
                                    October, Year 6 with a park rating of at least
                                    600.
    Initial Guests in Park..........0
    Initial Rating..................0
    Park Size.......................1,281,390 sq.ft
    Initial Cash....................€10,000
    Initial Debt....................€10,000
    Debt Rate.......................at 6% per year
    Initial Company Value...........€0
    Initial Park Value..............€0
    Buy Land........................No
    Buy Construction Rights.........No
    Profit System...................Pay to enter, Free for Rides
    Rides Already Built.............None
    
    o The build your own parks are open books - just expand, build and market.
    ______________________________________________________________________________
                       6-D Build your own Six Flags Magic Mountain    
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Task......................Create your own version of this massive Six
                                    Flags Park.
    Objectives......................To repay your loan and achieve a park value 
                                    of at least €700,000.
    Initial Guests in Park..........0
    Initial Rating..................0
    Park Size.......................2,216,720 sq.ft
    Initial Cash....................€10,000
    Initial Debt....................€50,000
    Debt Rate.......................at 5% per year
    Initial Company Value...........-€40,000
    Initial Park Value..............€0
    Buy Land........................No
    Buy Construction Rights.........No
    Profit System...................Pay to enter, Free for Rides
    Rides Already Built.............None
    
    o The build your own parks are open books - just expand, build and market.
    ______________________________________________________________________________
                         6-E Build your own Six Flags over Texas
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Task......................Starting from scratch build the rides in this
                                    Six Flags Park.
    Objectives......................To have at least 3,000 guests by the end of 
                                    October, Year 5 with a park rating of at least
                                    600.
    Initial Guests in Park..........0
    Initial Rating..................0
    Park Size.......................1,590,600 sq.ft.
    Initial Cash....................€10,000
    Initial Debt....................€10,000
    Debt Rate.......................at 12% per year
    Initial Company Value...........€0
    Initial Park Value..............€0
    Buy Land........................No
    Buy Construction Rights.........No
    Profit System...................Pay to enter, Free for Rides
    Rides Already Built.............None
    
    o The build your own parks are open books - just expand, build and market.
    ______________________________________________________________________________
                            7-A1 Air Powered Vertical Coaster
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Construction..............Track consists of steel of steel girders. Trains run
                              on rubber tires to give a smooth ride, with up-stop 
                              wheels below.
    Special Track Elements....Banked Curve, Vertical Track
    Maximum track slope.......90°
    Vehicles..................Air Powered Coaster Train
    Other Info................The train is launched out of the station by an air-
                              powered launch system. To achieve a comfortable 
                              ride, the launch speed should be carefully chosen 
                              so the train is travelling at a minimum speed over 
                              the crest of the hill.
    Approximate Cost..........€6,750 upwards
    Comments..................This is quite a tricky rollercoaster to design, 
                              practice in the designer.
    Tips for Construction.....This rollercoaster really does'nt give you much
                              choice on how to build it, all you can really do is
                              build rides like Wings of Apollo, except with 
                              different themeing.
    ______________________________________________________________________________
                                 7-A2 Bobsleigh Coaster
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Construction..............Track is a semi-circular channel, supported by 
                              tubular steel posts. Cars run on small wheels, and 
                              are free to take their own course along the track, 
                              guided only by the curvature and gradient of the 
                              channel.
    Special Track Elements....Banked Curves, Banked Helix
    Banked Curves.............50° banking
    Maximum track slope.......25°
    Lift hill maximum slope...25°
    Max. Height above ground..90ft
    Vehicles..................Bobsleigh Cars
    Other Info................Track layout requires very careful planning, as cars
                              can crash off the track at the crests of hills if it
                              is going to fast.
    Approximate Cost..........€2,700 upwards
    Comments..................Again this rollercoaster does not offer a lot of 
                              choice other than going around and around in 
                              circles.
    Tips for Construction.....1)In Bobsled coasters you must be careful not to 
                              have too high of a speed going into a turn, crashs
                              easily occur.
                              2)Stick with Helixs, they are both easy to use, fun
                              and compact.
                              3)There is no need to go too high, 40ft is more than
                              enough.
    ______________________________________________________________________________
                            7-A3 Compact Inverted Coaster
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Construction..............Riders sit in pairs of seats suspended beneath the 
                              track as they loop and twist through tight 
                              inversions
    Special Track Elements....S-Bends, Vertical Loops, In-Line-Twists, Half Loops,
                              Half Corkscrews, Helixs, On-Ride-Photos, Block 
                              Breaks
    Banked Curves.............50° banking
    Maximum track slope.......60°
    Lift hill maximum slope...25°
    Max. Height above ground..175ft
    Vehicles..................Compact Inverted Coaster Cars
    Approximate Cost..........€3,750 upwards
    Comments..................Lots of choice
    Tips for Construction.....1)Be careful, don't let average speed get too high
                              2)One of everything makes a great coaster
                              3)Check out the pre-made designs.
    ______________________________________________________________________________
                              7-B1 Corkscrew Roller Coaster
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Construction..............Track has a tubular steel spine, connected to the
                              inside edges of tubular steel running rails.
                              Supporting are large tubular steel posts. Trains
                              are held on the track by wheels above, below and
                              outside the running rails.
    Special Track Elements....Banked Curves, Vertical Loop, Steep Twist, Half
                              Loop, Corkscrew, Banked Helix, On-Ride Photo
    Banked Curves.............50° banking
    Maximum track slope.......60°
    Lift hill maximum slope...25°
    Max. Height above ground..239ft
    Vehicles..................Roller Coaster Train
    Other Info................Can give a slightly rough ride, but allows the
                              most complex track elements to be used, and can
                              be built up to a large height.
    Approximate Cost..........€3,900 upwards
    ______________________________________________________________________________
                              7-B2 Floorless Roller Coaster
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Construction..............Wide coaster trains with no floor give the 
                              passengers an open-air feeling as they glide through
                              twisted track and multiple inversions.
    Special Track Elements....Vertical Loop, Half Loop, Half Corkscrew, Helixes, 
                              On-Ride-Photo, Barrel Roll, Large Half Loop, Quarter
                              Loop, Block Brakes, Banking.
    Banked Curves.............50° banking
    Maximum track slope.......90°
    Lift hill maximum slope...25°
    Max. Height above ground..165ft
    Vehicles..................Floorless Roller Coaster
    Other Info................Complicated coaster, best to avoid designing until 
                              you have mastered other coasters. Use predesigned
                              coasters as guide
    Approximate Cost..........€4,500 upwards
    ______________________________________________________________________________
                               7-B3 Flying Roller Coaster
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Construction..............Track has a tubular steel spine, connected to the 
                              outside edges of tubular steel running rails.  
                              Supports are large tubular steel posts. Trains are
                              held on the track by wheels below and inside the 
                              running rails.
    Special Track Elements....Banked curves, Vertical Loop, Steep Twist, Banked 
                              Helix, On-Ride Photo, Inline Twists
    Banked Curves.............50° banking
    Maximum track slope.......60°
    Lift hill maximum slope...25°
    Max. Height above ground..145ft
    Vehicles..................Flying Roller Coaster Train
    Other Info................To give the feeling of flight, the passengers ride 
                              in a lying-down position. The track can twist to 
                              allow the riders to travel face-up with the track 
                              below them, or suspended face-down with the track 
                              above them.
    Approximate Cost..........€3,000 upwards
    ______________________________________________________________________________
                                    7-C1 Flying Turns
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Construction..............Riders career down a twisting track in large 
                              bobsliege cars guided only by the curvateur and
                              banking of the semi-circular track.
    Special Track Elements....Helixes, Block Brakes, Banking
    Maximum track slope.......60°
    Lift hill maximum slope...30°
    Max. Height above ground..90ft
    Vehicles..................Flying Turns Car
    Other Info................Like the bobslighe coaster, accidents occur very
                              easily, so be careful with speed and bends.
    Approximate Cost..........€2,500 upwards
    ______________________________________________________________________________
                                    7-C2 Giga Coaster
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Construction..............A giant steel roller coaster capable of smooth drops
                              and hills of over 300ft.
    Special Track Elements....Helixes, On-Ride-Photos, Cable lift, Block Brakes,
                              Banking
    Banked Curves.............50° banking
    Maximum track slope.......60°
    Lift hill maximum slope...25°
    Max. Height above ground..425ft
    Vehicles..................Giga Coaster Train
    Other Info................Only design your own ones after checking out
                              the pre-made ones.
    Approximate Cost..........€5,000 upwards
    ______________________________________________________________________________
                            7-C3 Heartline Twister Roller Coaster
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Construction..............Track consists of tubular steel running rails 
                              running through circular steel hoops. Cars run 
                              centrally between the rails, allowing heartline 
                              twists.
    Special Track Elements....Heartline Roll
    Maximum track slope.......60°
    Lift hill maximum slope...60°
    Max. Height above ground..95ft
    Vehicles..................Twister Cars, Twister Cars (Reversed)
    Other Info................Due to the constraints of the track and car design, 
                              corners are not possible, so build a complete 
                              circuit special transfer tracks are used to transfer
                              between a lower and an upper track.
    Approximate Cost..........€3,000 upwards
    ______________________________________________________________________________
                                   7-D1 Hypercoaster
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Construction..............A tall non-inverting roller coaster with large 
                              drops, high speed, and comfortable trains with only
                              lap bar restraint.
    Special Track Elements....Helixes, On-Ride-Photos, Block Brakes, Banking.
    Banked Curves.............50° banking
    Maximum track slope.......60°
    Lift hill maximum slope...25°
    Max. Height above ground..220ft
    Vehicles..................Hypercoaster trains.
    Other Info................Extermly expensive to build, and hard to design, try
                              only at advanced stages.
    Approximate Cost..........€5,000 upwards
    ______________________________________________________________________________
                              7-D2 Inverted Harpin Coaster
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Construction..............Individual cars run beneath a zig-zagging track with
                              hairpin turns and sharp drops.
    Special Track Elements....Block Brakes
    Maximum track slope.......60°
    Lift hill maximum slope...60°
    Max. Height above ground..75ft
    Vehicles..................Inverted Hairpin Coaster Cars
    Other Info................Easy to build, also quite cheap - good ride to build
                              early on in a park.
    Approximate Cost..........€1,500 upwards
    ______________________________________________________________________________
                             7-D3 Inverted Impluse Coaster
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Construction..............Inverted roller coaster trains are accelerated out 
                              of station to travel up a vertical spike of track,
                              then reverse back through the station to travel 
                              backwards up another spike of track.
    Special Track Elements....None
    Maximum track slope.......90°
    Max. Height above ground..215ft
    Vehicles..................Inverted Impulse Coaster Trains
    Other Info................Short ride that is quite exciting, great revenue
                              generator if your charging per ride.
    Approximate Cost..........€1,500 upwards
    ______________________________________________________________________________
                              7-E1 Inverted Roller Coaster
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Construction..............Track has a square-section steel spine, connected to
                              the inside edges of tubular steel rails. Supports 
                              are large square-section steel posts. Trains hang 
                              underneath the track, held in position by wheels 
                              above, below and outside the running rails.
    Special Track Elements....Banked Curves, Vertical Loop, Steep Twist, Inline
                              Twist, Half Loop, Corkscrew, Banked Helix, On-Ride 
                              Photo
    Banked Curves.............50° banking
    Maximum track slope.......60°
    Lift hill maximum slope...25°
    Max. Height above ground..180ft
    Vehicles..................Inverted Roller Coaster
    Other Info................An Inverted Roller Coaster feels more intense and 
                              exciting than a sit-down roller coaster; due to 
                              the exposed feeling the riders have with their feet
                              dangling below them and the lack of a car around 
                              them.
    Approximate Cost..........€4,000 upwards
    ______________________________________________________________________________
                              7-E2 Inverted Shuttle Coaster
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Construction..............Riders sit in pairs facing either fowards or 
                              backwards as they loop and twist through tight 
                              inversions.
    Special Track Elements....Vertical loop, In-Line-Twist, Half Loop, Half
                              Corkscrew, Helixes, On-Ride-Photo, Block Brakes,
                              Banking.
    Banked Curves.............50° banking
    Maximum track slope.......60°
    Lift hill maximum slope...25°
    Max. Height above ground..125ft
    Vehicles..................Inverted Shuttle Coaster Train.
    Other Info................Lovely cheap and exciting ride, makes plenty of 
                              money. Be careful with design to avoid crashs.
    Approximate Cost..........€1,500 upwards
    ______________________________________________________________________________
                              7-E3 Inverted Vertical Coaster
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Construction..............Riders sit in cars suspended beneath the track, 
                              pulled backwards up a vertical track and then 
                              dropped to loop and twist around tight inversions.
    Special Track Elements....Vertical Loop, In-Line-Twist, Half Loop, Half 
                              Corkscrew, Helixes, On-Ride-Photo, Block Brakes,
                              Banking.
    Banked Curves.............50° banking
    Maximum track slope.......90°
    Lift hill maximum slope...25°
    Max. Height above ground..125ft
    Vehicles..................Inverted Vertical Coaster Shuttle
    Other Info................Difficult to design, stick with pre-made coasters
                              like De Javu.
    Approximate Cost..........€2,500 upwards
    ______________________________________________________________________________
                               7-F1 Junior Roller Coaster
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Construction..............A gentle roller coaster for people who have'nt yet
                              got the courage to face the larger rides.
    Special Track Elements....Helixes, Block Brakes, Banking.
    Banked Curves.............50° banking
    Maximum track slope.......25°
    Lift hill maximum slope...25°
    Max. Height above ground..55ft
    Vehicles..................Log Trains,
                              Ladybird Trains,
    Other Info................Easiest roller coaster in the entire game to design,
                              you can hom your designing skills by practicing with
                              this one. Its also very chesp.
    Approximate Cost..........€3,000 upwards
    ______________________________________________________________________________
                             7-F2 LIM Launched Roller Coaster
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Construction..............Roller Coaster trains are accelerated out of 
                              station by linear induction motors to speed through
                              twisting inversions.
    Special Track Elements....Vertical Loops, In-Line-Twists, Half Corkscrews,
                              Helixes, On-Ride-Photo, Quarter Loops, Block Brakes,
                              Banking.
    Banked Curves.............50° banking
    Maximum track slope.......90°
    Max. Height above ground..170ft
    Vehicles..................LIM Roller Coaster Trains.
    Other Info................Interesting at a glance...but noting special.
    Approximate Cost..........€2,000 upwards
    ______________________________________________________________________________
                              7-F3 Lay-down Roller Coaster
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Construction..............Riders are held in special harnesses in a laying 
                              down position, traveling through twisted track and
                              inversions either on their backs or laying on the
                              ground.
    Special Track Elements....Vertical Loops, Helixes, On-Ride-Photo, 
                              In-Line-Twist, Half Loop, Half Corkscrew, Block 
                              Brakes, Banking.
    Banked Curves.............50° banking
    Maximum track slope.......60°
    Lift hill maximum slope...25°
    Max. Height above ground..125ft
    Vehicles..................Lay-Down Roller Coaster Train
    Other Info................Great coaster if you can builds it - and pay for it!
    Approximate Cost..........€4,500 upwards
    ______________________________________________________________________________
                              7-G1 Looping Roller Coaster
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Construction..............Roller Coaster trains with lap bars capable of 
                              traveling through vertical loops.
    Special Track Elements....Vertical Loops, Helixes, On-Ride-Photo, Block 
                              Brakes, Banking.
    Banked Curves.............50° banking
    Maximum track slope.......60°
    Lift hill maximum slope...25°
    Max. Height above ground..170ft
    Vehicles..................Looping Coaster Train
    Other Info................Standard roller coaster.
    Approximate Cost..........€3,500 upwards
    ______________________________________________________________________________
                                    7-G2 Mine Ride
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Construction..............Powered mine trains career along a smooth and 
                              twisted track layout.
    Special Track Elements....Helixes, On-Ride-Photo, Banking.
    Banked Curves.............50° banking
    Maximum track slope.......25°
    Max. Height above ground..60ft
    Vehicles..................Mine Trains
    Other Info................Great coaster when mixed with plenty of well placed
                              mine theming.
    Approximate Cost..........€3,000 upwards
    ______________________________________________________________________________
                                7-G3 Mine Train Coaster
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Construction..............Track consists of tubular steel rails, fastened
                              to a wooden support structure. Trains are held
                              on the track by wheels above, below and outside
                              the running rails.
    Special Track Elements....Banked Curves, Banked Helix, On-Ride Photo
    Banked Curves.............50° banking
    Maximum track slope.......60°
    Lift hill maximum slope...25°
    Max. Height above ground..100ft
    Vehicles..................Mine Train Coaster
    Other Info................The Mine Train is all about fast, smooth, twisted
                              track, and can be improved considerably by adding
                              tunnels.
    Approximate Cost..........€3,500 upwards
    ______________________________________________________________________________
                               7-H1 Mini Roller Coaster
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Construction..............Track has steel running rails with cross-bracing.
                              Supports are thin square-section posts. Trains are
                              held on the track by wheels above, below and
                              outside the running rails.
    Special Track Elements....None
    Maximum track slope.......60°
    Lift hill maximum slope...25°
    Max. Height above ground..75ft
    Vehicles..................Automobile Cars,
                              Rocket Cars,
                              Toboggon,
    Other Info................Cheaper than other types of roller coaster, but
                              can't be as tall and curves can't be banked.
    Approximate Cost..........€1,500 upwards
    ______________________________________________________________________________
                             7-H2 Mini Suspended Coaster
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Construction..............Passengers ride in small cars hanging beneath the
                              single rail track, swinging freely from side to side
                              around corners.
    Special Track Elements....None
    Maximum track slope.......25°
    Lift hill maximum slope...25°
    Max. Height above ground..45ft
    Vehicles..................Swinging Cars
    Other Info................Easy coaster if your on a tight budget and not great
                              at designing coasters.
    Approximate Cost..........€2,000 upwards
    ______________________________________________________________________________
                          7-H3 Mini Suspended Flying Coaster
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Construction..............Passengers ride face-down in a lying position,
                              suspended in a specially designed car from the 
                              single rail-track, swinging freely from side to 
                              side.
    Special Track Elements....None
    Maximum track slope.......25°
    Lift hill maximum slope...25°
    Max. Height above ground..45ft
    Vehicles..................Swinging Cars
    Other Info................Similer to Mini Suspended Coaster.
    Approximate Cost..........€2,000 upwards
    ______________________________________________________________________________
                                7-I1 Motorbike Races
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Construction..............Riders ride motorbike-shaped roller coaster 
                              vehiles along a single-rail track.
    Special Track Elements....Block Breaks.
    Maximum track slope.......25°
    Lift hill maximum slope...25°
    Max. Height above ground..65ft
    Vehicles..................Motorbikes
    Other Info................Boring ride, but cheap and cheerfull.
    Approximate Cost..........€1,500 upwards
    ______________________________________________________________________________
                          7-I2 Multi-Dimension Roller Coaster
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Construction..............Siting in seats suspended either side of the track,
                              riders are pitched head-over-heels while they plunge
                              down steep drops and travel through various 
                              inversions.
    Special Track Elements....Helixes, On-Ride-Photo, In-Line-Twist, Block Breaks,
                              Quarter Loop, Seat Rotations.
    Banked Curves.............50° banking
    Maximum track slope.......90°
    Lift hill maximum slope...25°
    Max. Height above ground..195ft
    Vehicles..................Multi-Dimension Coaster Train
    Other Info................Incrediably difficult coaster to design - only 
                              attempt to design in designer.
    Approximate Cost..........€10,000 upwards
    ______________________________________________________________________________
                              7-I3 Reverse Freefall Coaster
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Construction..............The car is accelerated out of the station along a
                              long level track using Linear Induction Motors, then
                              heads straight up a vertical spike of track,
                              freefalling back down to return to the station.
    Special Track Elements....Slope up Vertical, Vertical Track.
    Maximum track slope.......90°
    Max. Height above ground..575ft
    Vehicles..................Reverse Freefall Car
    Other Info................Great ride to put at park edge. Highest roller 
                              coaster in the game.
    Approximate Cost..........€2,000 upwards
    ______________________________________________________________________________
                               7-J1 Reverser Roller Coaster
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Construction..............Track is laminated wood, topped with a flat steel
                              running rail, constructed on a wooden support
                              structure. Cars run on bogies guided along the
                              track by side-friction wheels running. Special
                              sections of track are used to turn the car around,
                              allowing it to run backwards.
    Special Track Elements....Reversing Sections
    Maximum track slope.......25°
    Lift hill maximum slope...25°
    Max. Height above ground..85ft
    Vehicles..................Reverser Cars
    Other Info................Can leave guests quite nauseaus if you build too
                              many reverser sections.
    Approximate Cost..........€1,750 upwards
    ______________________________________________________________________________
                             7-J2 Side-Friction Roller Coaster
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Construction..............Track is laminated wood, topped with a flat steel 
                              running rail, constructed on a wooden support 
                              structure. Trains are guided along the track by 
                              side-friction wheels running inside wooden guide 
                              rails.
    Special Track Elements....None
    Maximum track slope.......25°
    Lift hill maximum slope...25°
    Max. Height above ground..70ft
    Vehicles..................Wooden Side Friction Cars
    Other Info................Cheap and easy to build, the track layout needs to
                              be designed carefully, otherwise cars can fly
                              straight off the track on hills.
    Approximate Cost..........€1,500 upwards
    ______________________________________________________________________________
                                 7-J3 Soap Box Derby
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Construction..............Riders ride soap-box car shaped vehicles along a 
                              single rail roller coaster track.
    Special Track Elements....Block Brakes
    Maximum track slope.......25°
    Lift hill maximum slope...25°
    Max. Height above ground..65ft
    Vehicles..................Soap-box derby cars
    Other Info................Very simple ride for less intense riders.
    Approximate Cost..........€1,000 upwards
    ______________________________________________________________________________
                              7-K1 Spinning Wild Mouse
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Construction..............Mouse shaped cars speed through tight corners and
                              short drops, gently spinning round to disorintate
                              riders.
    Special Track Elements....Spinning Control Toggle Track, Block Brakes.
    Maximum track slope.......25°
    Lift hill maximum slope...25°
    Max. Height above ground..75ft
    Vehicles..................Spinning Wild Mouse Cars
    Other Info................Nice ride, but results in many nauesus guests.
    Approximate Cost..........€1,500 upwards
    ______________________________________________________________________________
                              7-K2 Sprial Roller Coaster   
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Construction..............A compact steel-tracked roller coaster with spiral
                              lift hill and cars with in line seating.
    Special Track Elements....Helixes, On-Ride-Photo, Curved Lift Hill, Block 
                              Brakes, Banking.
    Banked Curves.............30° banking
    Maximum track slope.......25°
    Lift hill maximum slope...25°
    Max. Height above ground..90ft
    Vehicles..................Spiral Roller Coaster Train
    Other Info................Really good ride to start off with, very cheap.
    Approximate Cost..........€3,500 upwards
    ______________________________________________________________________________
                             7-K3 - Stand-up Roller Coaster                     
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Construction..............Track has a tubular steel spine, connected to the
                              inside edges of tubular steel running rails.
                              Supporting are large tubular steel posts. Trains
                              are held on the track by wheels above, below and
                              outside the running rails.
    Special Track Elements....Banked Curves, Vertical Loop, Half Loop, 
                              Corkscrew, On-Ride Photo
    Banked Curves.............30° banking
    Maximum track slope.......60°
    Lift hill maximum slope...25°
    Max. Height above ground..120ft
    Vehicles..................Stand-Up Roller Coaster Cars
    Other Info................Gives a more intense ride than a sit-down roller
                              coaster, so the track requires careful design to
                              avoid high G forces, especially lateral G's.
    Approximate Cost..........€4,000 upwards
    ______________________________________________________________________________
                             7-L1 - Stand-up Twister Coaster
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Construction..............Riders ride in a standing position in wide coaster
                              trains with specially designed restraints as they 
                              race down smooth drops and through multiple 
                              inversions.
    Special Track Elements....Vertical Loop, Half Loop, Half Corkscrew, Helixes,
                              On-Ride-Photo, Barrel Roll, Large Half Loop, 
                              Quarter Loop, Block Brakes, Banking.
    Banked Curves.............50° banking
    Maximum track slope.......90°
    Lift hill maximum slope...25°
    Max. Height above ground..195ft
    Vehicles..................Stand-Up-Twister Coaster Trains
    Other Info................Excellent ride, but yet again very hard to build
                              and very costly.
    Approximate Cost..........€7,500 upwards
    ______________________________________________________________________________
                                  7-L2 - Steeplechase
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Construction..............Riders ride horse shaped vehicles which run along a
                              single rail coaster track.
    Special Track Elements....Block Brakes
    Maximum track slope.......25°
    Lift hill maximum slope...25°
    Max. Height above ground..65ft
    Vehicles..................Horses
    Other Info................Nice cheap space filler - but noting more than that.
    Approximate Cost..........€1,500 upwards
    ______________________________________________________________________________
                             7-L3 - Suspended Swinging Coaster
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Construction..............Track has a tubular steel spine, connected to the
                              inside edges of tubular steel running rails.
                              Supporting are large tubular steel posts. Trains
                              hang underneath the track, swinging freely on a
                              chassis held on by wheels above, below, and
                              outside the running rails.
    Special Track Elements....Banked Helix, Block Brakes
    Maximum track slope.......60°
    Lift hill maximum slope...25°
    Max. Height above ground..110ft
    Vehicles..................Suspended Swinging Aeroplane Cars,
                              Suspended Swinging Cars
                              Swinging Floorless Cars,
    Other Info................A good Suspended Roller Coaster requires plenty of
                              curves and helixes to provide high lateral G's
                              to swing the cars.
    Approximate Cost..........€3,750 upwards
    ______________________________________________________________________________
                             7-M1 - Twister Roller Coaster
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Construction..............Track has a box-section steel spine, connected to
                              the inside edges of tubular steel running rails.
                              Supports are large tubular steel posts. Trains
                              are held on the track by wheels above, below, and
                              outside the running rails.
    Special Track Elements....Banked Curves, Vertical Loop, Steep Twist, Half
                              Loop, Corkscrew, Banked Helix, On-Ride Photo,
                              Barrel Roll, Launched Lift Hill, Large Loop and
                              Half Loop.
    Banked Curves.............50° banking
    Maximum track slope.......90°
    Lift hill maximum slope...25°
    Max. Height above ground..195ft
    Vehicles..................Twister Roller Coaster
    Other Info................Articulated Trains allow this type of roller
                              coaster to use a wide variety of twisted track
                              and inversions.
    Approximate Cost..........€5,000 upwards
    ______________________________________________________________________________
                           7-M2 - Vertical Drop Roller Coaster
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Construction..............Track has a square section steel spine, connected to
                              the inside edges of tubular steel running rails. 
                              Supports are large square section steel posts. 
                              Trains are held on the track by wheels above, below,
                              and outside the running rails.
    Special Track Elements....Banked Curves, Steep Twist, Banked Helix, On-Ride 
                              Photo, Vertical drop, Holding Brake (for vertical 
                              drop)
    Banked Curves.............50° banking
    Maximum track slope.......90°
    Lift hill maximum slope...60°
    Max. Height above ground..260ft
    Vehicles..................Vertical Roller Coaster Cars
    Other Info................Gives a smooth ride with limited scope for special 
                              track, but allows vertical track to be built.
    Approximate Cost..........€4,000 upwards
    ______________________________________________________________________________
                                7-M3 - Virgina Reel
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Construction..............Track is flat-bottomed wooden trough. The cars are
                              guided along the track by the sides of the trough,
                              spinning as they touch the sides.
    Special Track Elements....None
    Maximum track slope.......25°
    Lift hill maximum slope...25°
    Max. Height above ground..65ft
    Vehicles..................Reel Tubs
    Other Info................Design the track layout with as many corners as
                              possible to keep the cars spinning.
    Approximate Cost..........€1,000 upwards
    ______________________________________________________________________________
                                 7-N1 - Water Coaster
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Construction..............Boat shaped Cars run on roller coaster track to 
                              allow twisting curves and steep drops, splashing
                              down into sections of water.
    Special Track Elements....Helixes, Block Brakes, Water, Banking.
    Bank Curves...............50°
    Maximum track slope.......60°
    Lift hill maximum slope...25°
    Max. Height above ground..85ft
    Vehicles..................Coaster Boats
    Other Info................Lovely coaster - keep relatively short and fast.
    Approximate Cost..........€3,500 upwards
    ______________________________________________________________________________
                               7-N2 - Wild Mouse Coaster
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Construction..............Track consists of tubular steel rails. Supports
                              are large tubular steel posts. Cars are held on
                              the track by wheels above, below and outside the
                              running rails.
    Special Track Elements....None
    Maximum track slope.......60°
    Lift hill maximum slope...60°
    Max. Height above ground..75ft
    Vehicles..................Mouse Cars, 
                              Mine Cars,
    Other Info................A good Wild Mouse Roller Coaster is all about
                              tight turns and sudden drops - the more intense
                              the better.
    Approximate Cost..........€1,500 upwards
    ______________________________________________________________________________
                           7-N3 - Wooden Roller Coaster
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Construction..............Track is laminated wood, topped with a flat steel
                              running rail, constructed on a wooden support
                              structure. Trains are held on the track by upstop
                              wheels, which run under the inside edge of the
                              rails.
    Special Track Elements....Banked Curves, Vertical Loop, On-Ride Photo,
                              Water Splash, Helixes
    Banked Curves.............60° banking
    Maximum track slope.......60°
    Lift hill maximum slope...25°
    Max. Height above ground..200ft
    Vehicles..................Wooden Roller Coaster Train, 
                              Articulated Roller Coaster Trains, 
                              Wooden Roller Coaster Train - 6 seater, 
                              Wooden Roller Coaster Train - 6 seater (Reversed)
    Other Info................A good Wooden Roller Coaster is fast, has plenty
                              of air-time, some lateral G's, steep drops, and
                              is designed to feel 'out-of-control'.
    Approximate Cost..........€3,500 upwards
    ______________________________________________________________________________
                            7-O1 - Wooden Wild Mine Ride
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Construction..............Tiny Mine Trucks run on zig-zagging wooden track,
                              tilting percariously around hairpin turns and 
                              vicious drops.
    Special Track Elements....None
    Maximum track slope.......60°
    Lift hill maximum slope...60°
    Max. Height above ground..65ft
    Vehicles..................Wooden Wild Mine Ride Cars
    Other Info................A good Wild Mouse Mine Ride uses plenty of the 
                              available mine themeing with sharp drops and sudden
                              bends, all at constantly changing speeds.
    Approximate Cost..........€1,500 upwards
    ______________________________________________________________________________
                               7-O2 - Wooden Wild Mouse
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Construction..............Track is laminated wood, topped with a flat steel
                              running rail, constructed on a wooden support
                              structure. Cars are held on the track by mushroom
                              shaped pegs, running between steel guide rails in
                              the centre of the track, allowing the cars to
                              tilt over the corners.
    Special Track Elements....None
    Maximum track slope.......60°
    Lift hill maximum slope...60°
    Max. Height above ground..65ft
    Vehicles..................Wooden Wild Mouse
    Other Info................A good Wild Mouse Roller Coaster is all about
                              tight turns and sudden drops - the more intense
                              the better.
    Approximate Cost..........€1,500 upwards
    ______________________________________________________________________________
                                8-A1 - 3D Cinema
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Cost................€560
    Running Cost per hour.....€49.60
    Modes.....................3D Film - 'Mouse Tails'
                              3D Film - 'Storm Chasers'
                              3D Film - 'Space Raiders'
    
    o The most important strategy for 3D Cinemas is to change the film running
      every few months so that the same guests visit 2 or 3 times.
    
    o If you want to build more than one 3D Cinema in the one park - keep them
      well away from one another so that everyone in the park has a chance to use
      a 3D Cinema.
    ______________________________________________________________________________
                                8-A2 - Boat Hire
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Cost................€205+ (depends on platform lenght)
    Running Cost per hour.....€73.60
    Modes.....................Boat Hire Mode
    
    o Don't build the boat hires in too large of a lake because boats will get 
      lost and not return to the platform.
    
    o Build your platform as long as possible, so you can offer as many boats as
      possible.
    ______________________________________________________________________________
                               8-A3 - Bumper Cars
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Cost................€440
    Running Cost per hour.....€108.80
    Modes.....................Bumper Car Mode 
    
    o Nice ride to build near the park entrance - it gets peoples happiness rating
      up quickly - and the happier the guest - the quicker they spend money.
    ______________________________________________________________________________
                                8-B1 - Chairlift 
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Cost................€Mediocre - depends on track lenght
    Running Cost per hour.....€Mediocre - depends on track lenght
    Modes.....................Continuous Circuit Mode
                              Shuttle Mode
    
    o Use in mountainous levels to transport guest from point to point by 
      individual chairs.
    
    o Build more than two platforms to make the system more useful for guests and
      to get more chairs (thus more guests can ride at any one time.)
    
    o You can increase the ride ride - do this in parks where people pay for each
      ride - this will mean more paying guests per hour.
    ______________________________________________________________________________
                               8-B2 - Chesire Cats  
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Cost................€Low - depends on track lenght and height 
    Running Cost per hour.....€Low - depends on no. of cars
    Modes.....................Continuous Circuit
    
    o Theme with trees and shrubs. Placing a fence or hedge around the perimater
      of the ride gives a nice final touch.
    
    o Don't build too complex of a track - keep it short with a few twists because
      the maximum excitement rating your likely to get is not going to change much
      with ride lenght.
    ______________________________________________________________________________
                                8-B3 - Circus Show 
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Cost................€500 
    Running Cost per hour.....€49.60
    Modes.....................Circus Show Mode
    
    o Circus shows are best built beside large rollercoasters - the guests who
      don't like intense ride will then choose the Circus.
    ______________________________________________________________________________
                               8-C1 - Crooked House 
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Cost................€250
    Running Cost per hour.....€28.80
    Modes.....................Crooked House Mode
    
    o Very cheap to build and complements the gentle ride sections of your park,
      however Crooked Houses are not very popular - so only build after you have
      built plenty of other rides.
    ______________________________________________________________________________
                                8-C2 - Cycle Railway 
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Cost................€Mediocre - depends on track lenght and height 
    Running Cost per hour.....€Mediocre - depends on no. of cycles
    Modes.....................Continuous Circuit
    
    o Themeing with fences, hedges, bushs, flowers, statues, water features ect.
      will boost the otherwise relativly low excitement rating.
    
    o Again Cycle railways tend to attract the less-intense rider, so place near 
      intense rides to give guests a good choice.
    ______________________________________________________________________________
                          8-C3 - Double-Deck Observation Tower
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Cost................€High - depends on ride height
    Running Cost per hour.....€60.80
    Modes.....................Continuous Circuit Mode
    
    o Build either in the centre of your park or at the entrance - the entrance 
      option will allow guests to get an idea of where rides are - the centre will
      give guests the best view.
    
    o You can build more than one tower - but keep them apart from each other - 
      they are'nt the most popular rides.
    
    o Over time as the park grows, the towers excitement rating increases - make 
      sure to keep increaseing the price to equal the rating.
    ______________________________________________________________________________
                                   8-D1 - Elevator  
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Cost................€High - depends on ride height
    Running Cost per hour.....€Mediocre - depends on ride height
    Modes.....................Shuttle Mode
    
    o Best off to stick with the pre-designed elevator - it is well designed and
      will fit in to any park.
    ______________________________________________________________________________
                                  8-D2 - Enterprise
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Cost................€800
    Running Cost per hour.....€49.60
    Modes.....................Rotation Mode
    
    o This is a great ride to build if you have very little cash - it is 
      relatively cheap to build and makes a lot of money.
    ______________________________________________________________________________
                                 8-D3 - Ferris Wheel 
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Cost................€450
    Running Cost per hour.....€49.60
    Modes.....................Continuous Circuit Mode
    
    o Althought the traditional theme park demands a Ferris Wheel - its a classic,
      they tend to be very unpopular in rollercoaster tycoon - so only build one
      when you have developed most rides already.
    
    o Building big rides (such as rollercoasters) near a ferris wheel boosts its 
      excitement rating.
    ______________________________________________________________________________
                                8-E1 - Flying Saucers 
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Cost................€560 
    Running Cost per hour.....€148.80
    Modes.....................Bumper Car Mode
    
    o Althought relatively popular with a good excitement rating - flying saucers
      cost a lot to run.
    ______________________________________________________________________________
                                  8-E2 - Ghost Train 
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Cost................€High - depends on ride lenght
    Running Cost per hour.....€Mediocre - depends on ride lenght and no. of trains
    Modes.....................Continuous Circuit Mode
    
    o Castle and building themeing suits ghost trains the best. However this 
      usually means construction is very expensive.
    
    o Best to stick with pre-designed tracks early on in parks where your money 
      levels are low.
    ______________________________________________________________________________
                                    8-E3 - Go Karts    
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Cost................€Mediocre - depends on track lenght/height
    Running Cost per hour.....€65.60
    Modes.....................Race Mode
                              Continuous Circuit Mode
    
    o Building more than one Go Karts track beside another one boosts both tracks 
      excitement rating considerably.
    
    o Race mode thens to be the most popular mode, however in busy parks 
      continuous circuit mode is also popular.
    
    o Themeing is very important - any cort will work; mine, castle, wonderland
      etc. Also track layout boosts excitement ratings if there is lots of twists,
      elevations, underground sections and bridges.
    ______________________________________________________________________________
                                  8-F1 - Haunted House   
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Cost................€340
    Running Cost per hour.....€49.60
    Modes.....................Continuous Circuit Mode
    
    o Nice cheap ride to build and run - however not that popular - only build if
      you've built most other rides.
    ______________________________________________________________________________
                                 8-F2 - Haunted Mansion 
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Cost................€High - depends on ride lenght and themeing
    Running Cost per hour.....€Mediocre - depends on ride lenght and no. of cars
    Modes.....................Continuous Circuit Mode
    
    o Stick with thr pre-designed track layout - it is much easier and simplier to
      build than any coustom one.
    
    o In coustom tracks make your paltform long and have plenty of cars, so the
      maximum number of guests can ride at anyone time.
    ______________________________________________________________________________
                                    8-F3 - Hedge Maze 
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Cost................€Low - depends on lenght
    Running Cost per hour.....€49.60
    Modes.....................Maze Mode
    
    o Again not that popular of a ride - only build after you have built plenty 
      of more popular rides.
    ______________________________________________________________________________
                                    8-G1 - Jet Skis  
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Cost................€205+ (depends on platform lenght)
    Running Cost per hour.....€60.80
    Modes.....................Boat Hire Mode
    
    o Don't build on too buig of a lake - riders won't return skis and the ride 
      will lose money.
    
    o Build a long platform - the longer it is the more skis the ride will have -
      thus more guests per hour and more money per hour.
    ______________________________________________________________________________
                                    8-G2 - Log Flume 
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Cost................€Very High - depends on height/lenght
    Running Cost per hour.....€High - depends on no. of flumes
    Modes.....................Continuous Circuit Mode
    
    o Very popular with guests, design for track to go up, over, under around 
      other sections of the track to boost the excitement rating.
    ______________________________________________________________________________
                                  8-G3 - Merry-Go-Round
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Cost................€460
    Running Cost per hour.....€49.60
    Modes.....................Continuous Circuit Mode
    
    o Not that popular, best built near busy paths - such as those beside 
      foodcourts.
    
    o Building merry-go-rounds in the centre of squares where people congregate
      makes them look good and boosts popularity. There music also boosts the
      park rating.
    ______________________________________________________________________________
                                    8-H1 - Mini Cars 
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Cost................€Mediocre - depends on ride lenght and height
    Running Cost per hour.....€High - depends on ride lenght and no. of cars
    Modes.....................Continuous Circuit Mode
    
    o For the less-intense rider, mini cars are'n that popular or profitable. Good
      themeing will boost the excitement rating a bit - but not that much.
    ______________________________________________________________________________
                                    8-H2 - Mini Golf   
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Cost................€Mediocre - depends on ride lenght and no. of holes
    Running Cost per hour.....€Low - depends on ride lenght and no. of holes
    Modes.....................Continuous Circuit Mode
    
    o Very popular - however not that profitable, because only a few people can 
      use it at any one time.
    
    o The pre-designed courses will give you an idea how to theme your own mini
      golf courses.
    ______________________________________________________________________________
                                  8-H3 - Mini Helicopters 
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Cost................€Mediocre - depends on ride lenght and height
    Running Cost per hour.....€Low - depends on ride lenght and no. of helicopters
    Modes.....................Continuous Circuit Mode
    
    o Yet again only for the the faint hearted - not popular or very profitable -
      themeing will increase the excitement rating a bit.
    ______________________________________________________________________________
                                  8-I1 - Minituare Railway  
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Cost................€High - depends on track lenght
    Running Cost per hour.....€High - depends on track lenght and no. of trains
    Modes.....................Continuous Circuit Mode
    
    o Excellent ride - both helps guests get around and makes lots of money. Make
      sure to revise fares every few months as the excitement rating will increase
      due to other new rides improving guests view.
    
    o Trees and rollercoasters beside the track wil increase the excitement 
      rating.
    
    o Make sure to have your stops at the least popular sections of the park - to 
      make them popular.
    ______________________________________________________________________________
                                    8-I2 - Monorail   
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Cost................€High - depends on track lenght
    Running Cost per hour.....€High - depends on track lenght and no. of trains
    Modes.....................Continuous Circuit Mode
                              Shuttle Mode
    
    o Very convient - and looks well if you build over path or rides. 
    ______________________________________________________________________________
                                    8-I3 - Monster Trucks   
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Cost................€Mediocre - depends on track lenght
    Running Cost per hour.....€Mediocre -depends on track lenght and no. of trucks
    Modes.....................Continuous Circuit Mode
    
    o Use the pre-designed monster truck track to help design your own track -
      plenty of themeing will improve the excitement rating.
    ______________________________________________________________________________
                                  8-J1 - Motion Simulator 
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Cost................€440
    Running Cost per hour.....€49.60
    Modes.....................Film - 'Avenging Aviators'
                              Film - 'Thrill Riders'
    
    o Switch the film regularly to get guests to use the simulator more than once.
    ______________________________________________________________________________
                                 8-J2 - Observation Tower  
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Cost................€High - depends on ride height
    Running Cost per hour.....€60.80
    Modes.....................Continuous Circuit Mode
    
    o Build either in the centre of your park or at the entrance - the entrance 
      option will allow guests to get an idea of where rides are - the centre will
      give guests the best view.
    
    o You can build more than one tower - but keep them apart from each other - 
      they are'nt the most popular rides.
    
    o Over time as the park grows, the towers excitement rating increases - make 
      sure to keep increaseing the price to equal the rating.
    ______________________________________________________________________________
                                     8-J3 - Raft Ride
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Cost................€High - depends on lenght/elevation
    Running Cost per hour.....€High
    Modes.....................Continuous Circuit Mode
    
    o Expensive and time consumeing to build - only build if you can afford to -
      however this ride is quite profitable and popular.
    ______________________________________________________________________________
                                   8-K1 - River Rapids 
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Cost................€High - depends on ride lenght and no. features
    Running Cost per hour.....€High - depends on no. of boats.
    Modes.....................Continuous Circuit Mode
    
    o Works well in a hilly park - where it is blended in to look like a real
      river.
    
    o Very profitable and easy to build - make sure to have plenty of boats so
      more guests can use it at the same time.
    
    o Make the queue path into a bridge over part of the river (if possible) to 
      increase guests anticipation.
    ______________________________________________________________________________
                                   8-K2 - River Ride
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Cost................€High - at least a €1,500, depends on track
    Running Cost per hour.....€Mediocre - depends on no. rafts
    Modes.....................Continuous Circuit Mode
    
    o Expensive enough to build - wait until you have already built plenty of
      other rides.
    
    o Themeing (particularly trees) will boost the excitement rating and thus the
      amount you can charge for guests to use the ride.
    ______________________________________________________________________________
                                    8-K3 - Roto Drop   
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Cost................€Mediocre - depends on height
    Running Cost per hour.....€60.60
    Modes.....................Freefall drop mode
    Max Capacity..............16
    
    o One of the best thrill rides - build more than one in big parks because 
      quite frankly there is plenty of demand for good thrill rides
    
    o Roto Drops allow guests to see the whole park - so placing them in the 
      centre of the park means; not only do they make lots of money; but also
      help guests find there way around.
    ______________________________________________________________________________
                                    8-L1 - Snow Cups 
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Cost................€Low
    Running Cost per hour.....€Low
    Modes.....................Continuous Circuit Mode
    
    o I've never actually used this ride (until I wrote this guide) because I find
      it boring and most guests do also.
    ______________________________________________________________________________
                                   8-L2 - Space Rings 
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Cost................€288
    Running Cost per hour.....€49.60
    Modes.....................Continuous Circuit Mode
    
    o Very popular - however space ring shave alow capacity - so maybe build 2 
      space rings beside each other if demand gets too high.
    ______________________________________________________________________________
                                  8-L3 - Spiral Slide 
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Cost................€330
    Running Cost per hour.....€49.60
    Modes.....................One Ride Mode
                              Unlimited Rides Mode
    
    o The one ride mode is by fare the most profitable - don't even consider the
      unlimited rides mode in a park where guests pay for rides not the entrance
      fee.
    ______________________________________________________________________________
                               8-M1 - Suspended Monorail  
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Cost................€Very High - depends on track lenght and height
    Running Cost per hour.....€High - depends on track lenght and no. of trains
    Modes.....................Continuous Circuit Mode
                              Shuttle Mode
    
    o Same as the normal monorail - very convient and popular. 
    ______________________________________________________________________________
                             8-M2 - Swinging Inverted Ship 
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Cost................€387
    Running Cost per hour.....€49.60
    Modes.....................Swinging Mode
    
    o Very good ride to strat off a park with - its cheap, popular and makes lots
      of money.
    ______________________________________________________________________________
                                  8-M3 - Swinging Ship  
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Cost................€424
    Running Cost per hour.....€49.60
    Modes.....................Swinging Mode
    
    o Very good ride to strat off a park with - its cheap, popular and makes lots
      of money.
    ______________________________________________________________________________
                                   8-N1 - Tram Ride
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Cost................€High - depends on track lenght
    Running Cost per hour.....€Mediocre -depends on track lenght and no. of trains
    Modes.....................Continuous Circuit Mode
                              Shuttle Mode
    
    o Suits a highly themed park - best left to some of the Six-Flags parks. Trams
      are popular however and very useful.
    ______________________________________________________________________________
                                 8-N2 - Water Coaster
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Cost................€High - depends on lenght
    Running Cost per hour.....€High - depends on capacity
    Modes.....................Continuous Circuit Mode
                              Continuous Circuit Blocked Section Mode 
    
    o Very popular and easy to build. Suits a water themed park the best alongside
      log flumes and water slides.
    ______________________________________________________________________________
                                  8-N3 - Water Slide  
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Basic Cost................€High - at least €2,000, depends on dimensions
    Running Cost per hour.....€High
    Modes.....................Continuous Circuit Mode
    
    o Be careful that the bottom of downward sections have cover top track - 
      otherwise guests will fly off.
    
    o Build a few water slides side by side to boost individual excitement
      ratings.
    ______________________________________________________________________________
                                  9-A1 - Balloon Stall
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Cost: €200
    Stock cost: €0.90
    Ideal Price: €1.50
    Profit: €0.60
    
    Balloon Stalls sell balloons in a wide variety of colours. It is advisable not
    to open any balloon stalls until guest numbers hit about 1,000+. Stalls should
    be placed in areas where large numbers of people cross, particularly at path
    intersections. If you have more than one balloon stall, make sure to offer
    different colours - and as time progresses, change the colour of balloons in
    all shops. Most parks can only support about 3 stalls, but they are likely to
    be highly profitable. If you want a bit of fun, you can pop any balloons that 
    float off by clicking on them.
    ______________________________________________________________________________
                                9-A2 - Beef Noodle Stall
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Cost: €300
    Stock cost: €1.50
    Ideal Price: €2.00
    Profit: €0.50
    
    I would'nt build Beef Noodle Stall's given the choice, the base product cost
    is quite high, so you cannot charge over more than €2, or you will deter 
    guests, so this leaves a low profit margin. However they do offer guests a 
    change from the burgers and chips. Beef Noodle Stall's also really suit
    the oriental themed areas of your park.
    ______________________________________________________________________________
                                    9-A3 - Burger Bar
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Cost: €300
    Stock cost: €1.50
    Ideal Price: €2.10
    Profit: €0.60
    
    Burger bars are the standard food shop. They tend to be very profitable and
    are ideally suited to busy unthemed areas such as entrance zones or food 
    courts. Unfortuatly they look rather unoriginal and dull. You can boast 
    profits by placing burger bars near the exits of long queue rides, because
    guests tend to have built up an appetite after queuing for ages.
    ______________________________________________________________________________
                                  9-B1 - Candy Apple Stall
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Cost: €300
    Stock cost: €0.70
    Ideal Price: €1.20
    Profit: €0.50
    
    Candy apple stalls will only make serious cash when placed in certain high 
    footfall areas such as path intersections. Ride exits work well also althought
    not as good as squares or path crossings. However overall Candy Apples don't
    make as much money as say Chicken Nugget's.
    ______________________________________________________________________________
                                    9-B2 - Cash Machine
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Cost: €200
    
    Cash machines are essential in all parks - both pay at entrance and pay at 
    ride parks. In pay at entrance parks, cash machines should be placed near
    entrance areas and particularly food courts. In pay at ride parks, machines
    should be built everywhere - particularly near the back of the park.
    ______________________________________________________________________________
                                9-B3 - Chicken Nuggets Stall
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Cost: €300
    Stock cost: €1.50
    Ideal Price: €2.00
    Profit: €0.50
    
    Quite profitable, can turn profit in most loctions, even in small parks 
    because chicken nuggets are substantial and easily cover guests hunger. 
    Chicken Nugget Stalls can be the ancor for your food court and is likely to
    be the first to brake even.
    ______________________________________________________________________________
                                    9-C1 - Coffee Shop
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Cost: €250
    Stock cost: €1.20
    Ideal Price: €1.90
    Profit: €0.70
    
    Great oppertunities here, great profit margin and a very popular product. This
    is definatly one of the best drink stalls. Place throughout park - mainly 
    beside food stalls.
    ______________________________________________________________________________
                                    9-C2 - Cookie Shop
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Cost: €300
    Stock cost: €0.70
    Ideal Price: €1.00
    Profit: €0.30
    
    Cookies euh? Sounds good right? Well not really, profit margin is quite low
    and product does not really fill guests. Only build in large parks and in
    food courts.
    ______________________________________________________________________________
                                9-C3 - Cotton Candy Stall
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Cost: €300
    Stock cost: €0.80
    Ideal Price: €1.30
    Profit: €0.50
    
    Good profitable stall, althought don't go mad with them. Fits in nicely in
    themed areas - particularly wonderland. Profits are highest at cross roads,
    ride exits and high footfall food courts.
    ______________________________________________________________________________
                                   9-D1 - Donut Shop
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Cost: €300
    Stock cost: €0.70
    Ideal Price: €1.00
    Profit: €0.30
    
    Not spectacular, at €1 you will need to sell a lot of donuts, so set your
    sights only on burgers in particularly busy parks and especially in busy 
    areas.
    ______________________________________________________________________________
                                   9-D2 - Drink Stall
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Cost: €250
    Stock cost: €1.20
    Ideal Price: €1.70
    Profit: €0.50
    
    Drink stalls are the most important and most profitable shops in the game
    apart from Burger Bars - and pairing them with Burger Bars will result in
    great profits. Place at ride exits, path crossings, squares etc. and you
    can't go wrong.
    ______________________________________________________________________________
                                9-D3 - First Aid Station
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Cost: €250
    
    Not as important as you may think. Only build a few clustered near roller 
    coasters and high nausea rides such as launched freefalls. Rembember every 
    extra one costs you in running costs.
    ______________________________________________________________________________
                               9-E1 - Fried Chicken Stall
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Cost: €300
    Stock cost: €1.50
    Ideal Price: €2.00
    Profit: €0.50
    
    Middle of the road shop, only build for variety and not really in the hope
    of a massive profit like that seen in Burger Bars. Pairing with drink stalls
    makes good fiscal sense.
    ______________________________________________________________________________
                             9-E2 - Fried Rice Noodles Stall
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Cost: €300
    Stock cost: €1.50
    Ideal Price: €2.00
    Profit: €2.00
    
    Again only really for variety - althought the money helps! Suits the oriental
    theming in particular and goes well with other simerally themed shops, stalls
    and rides.
    ______________________________________________________________________________
                                   9-F1 - Fries Stall
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Cost: €300
    Stock cost: €1.50
    Ideal Price: €2.00
    Profit: €0.50
    
    Fries are lovely profit makers, like burger bars, fries are staples and 
    everyone will eat them. At €0.50 margin you won't go hungery!
    ______________________________________________________________________________
                                9-F2 - Fruity Ices Stall
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Cost: €300
    Stock cost: €0.70
    Ideal Price: €1.00
    Profit: €0.30
    
    Another stall that is only mediocare. You can build it for varity, but stick
    to sunny parks that have plenty of guests. Just remember €0.30 is pateatic
    compared to €0.60 you can get from funnel cakes. Also they don't really fill
    guests up.
    ______________________________________________________________________________
                                9-F3 - Funnel Cake Shop
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Cost: €300
    Stock cost: €1.20
    Ideal Price: €1.80
    Profit: €0.60
    
    Great snack food. €0.60 is a great profit margin for a snack stall. Will suit
    most parks with reasonable level of guests.
    ______________________________________________________________________________
                                    9-G1 - Hat Stall
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Cost: €200
    Stock cost: €1.50
    Ideal Price: €2.10
    Profit: €0.60
    
    Nice cheap souvenires. You will sell lots of these in any park with guests, so
    build a good few throught your park. Ride exits are the best places because
    guests tend to be happier and more willing to spend money when in a great 
    mood.
    ______________________________________________________________________________
                                9-G2 - Hot Chocolate Stall
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Cost: €250
    Stock cost: €1.20
    Ideal Price: €1.70
    Profit: €0.50
    
    Nice alternative drink to coffee or lemonade. Build near food stalls or ride
    exits to sell more. 
    ______________________________________________________________________________
                                   9-G3 - Hot Dog Stall
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Cost: €300
    Stock cost: €1.00
    Ideal Price: €1.50
    Profit: €0.50
    
    Great value for guests with high profit margin. Whats more hot dogs really 
    fill guests up. As always have drink stalls nearby to maximise profit.
    ______________________________________________________________________________
                               9-H1 - Ice Cream Cone Stall
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Cost: €300
    Stock cost: €0.90
    Ideal Price: €1.50
    Profit: €0.60
    
    Ice cream is an ideal product for your parks, especially in hot, sunny parks.
    Place Ice Cream stalls anywhere and everywhere, if you have enough guests they
    will always make a profit.
    ______________________________________________________________________________
                                  9-H2 - Iced Tea Stall
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Cost: €250
    Stock cost: €1.20
    Ideal Price: €1.80
    Profit: €0.60
    
    Again use just for variety, althought Iced Tea Stalls will turn a profit. 
    Their really good feature is how cool they look!
    ______________________________________________________________________________
                                9-H3 - Information Kiosk
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Cost: €250
    Stock cost: €0.60 (Maps), €2.50 (Umbrellas)
    Ideal Price: €1.20 (Maps, €3.00 (Umbrellas)
    Profit: €0.60 (Maps), €0.50 (Umbrellas)
    
    Single greatest shop in the game. You can make a fortune from maps and 
    umbrellas. When it rains raise umbrella prices, however in sunny parks keep
    umbrella prices low. Make sure to build plenty of kiosks, particularly in 
    areas that guests get lost in.
    ______________________________________________________________________________
                                 9-I1 - Lemonade Stall
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Cost: €250
    Stock cost: €1.20
    Ideal Price: €1.70
    Profit: €0.50
    
    Ok, like any drink stall besides the original drinks stall, this is just for
    variety. Sunny parks are as always the best for drink stalls such as the
    Lemonade stall.
    ______________________________________________________________________________
                              9-I2 - Meatball Soup Stall
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Cost: €300
    Stock cost: €1.50
    Ideal Price: €2.00
    Profit: €0.50
    
    Meatball Soup? => Oriental style soup stall. Nice in themed areas, althought
    noting special.
    ______________________________________________________________________________
                                  9-I3 - Pizza Stall
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Cost: €300
    Stock cost: €1.60
    Ideal Price: €2.30
    Profit: €0.70
    
    Pizza stalls are lovely profit makers, OK I might charge over the odds... but
    who does'nt like pizza! In reality these are just for varitey. Make sure you
    have plenty of bins and benchs near stall.
    ______________________________________________________________________________
                                 9-J1 - Popcorn Stall
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Cost: €300
    Stock cost: €1.20
    Ideal Price: €1.60
    Profit: €0.40
    
    Popcorn stalls are OK, they are yet again for variety. They look well near
    cinemas obviosly! However they do not really fill up guests properally.
    ______________________________________________________________________________
                                 9-J2 - Pretzel Stall
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Cost: €300
    Stock cost: €1.10
    Ideal Price: €1.50
    Profit: €0.40
    
    A light snack, Pretzels are only Ok, and like popcorn, they have only limited
    profit potential.
    ______________________________________________________________________________
                                   9-J3 - Restroom
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Cost: €225
    Ideal Price: €0.10 - €0.30
    
    Restrooms can be usful as money makers. I am usually content with break-even
    toilets, but prefer to make money from them.
    ______________________________________________________________________________
                                   9-K1 - Restroom 2
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Cost: €225
    Ideal Price: €0.10 - €0.30
    
    The log cabine style restrooms looks a sight better from the other 
    prefabricated restrooms. They suit particularly wooded areas. Again you can
    try to make a small profit from them.
    ______________________________________________________________________________
                               9-K2 - Roast Sausage Stall
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Cost: €300
    Stock cost: €1.50
    Ideal Price: €2.00
    Profit: €0.50
    
    OK, no complaints. Roast susages are simply put - different. €0.50 is an OK
    profit margin.
    ______________________________________________________________________________
                                 9-K3 - Seafood Stall
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Cost: €300
    Stock cost: €1.50
    Ideal Price: €2.10
    Profit: €0.60
    
    Cool stall! Profit margin is ok and as ever, this is just for variety. One or
    two to a park is enough.
    ______________________________________________________________________________
                                 9-L1 - Souvenir Stall
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Cost: €200
    Stock cost: €2.50 & €2.50
    Ideal Price: €3.00 & €3.00
    Profit: €0.50
    
    Great money spinner. Ideal location is at park exit or ride exits (for when
    guests are happy and want to spend money.)
    ______________________________________________________________________________
                               9-L2 - Soybean Milk Stall
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Cost: €250
    Stock cost: €1.20
    Ideal Price: €1.90
    Profit: €0.70
    
    Chris Sawyer really wanted variety in this game. Well if your going to give
    guests something different, you might as well charge over the odds for it!
    Will suit nicely in themed areas.
    ______________________________________________________________________________
                             9-L3 - Star Fruit Drink Stall
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Cost: €250
    Stock cost: €1.20
    Ideal Price: €1.80
    Profit: €0.60
    
    More variety, adding to the endless choice the consumer has... nice profit
    margin thought and nice stall.
    ______________________________________________________________________________
                              9-M1 - Sub Sandwich Stall
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Cost: €300
    Stock cost: €1.50
    Ideal Price: €2.00
    Profit: €0.50
    
    Great stall, makes me hungery just writing about it. Quite popular and really
    filling for guests.
    ______________________________________________________________________________
                               9-M2 - Sujongkwa Stall
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Cost: €250
    Stock cost: €1.20
    Ideal Price: €1.70
    Profit: €0.50
    
    What? 
    ______________________________________________________________________________
                               9-M3 - Sunglasses Stall
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Cost: €200
    Stock cost: €1.50
    Ideal Price: €2.00
    Profit: €0.50
    
    Obviously sunglasses sell best in sunny parks, so if you've a sunny park you 
    can charge over the odds.
    ______________________________________________________________________________
                                9-N1 - T-Shirt Stall
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Cost: €200
    Stock cost: €3.00
    Ideal Price: €4.00
    Profit: €1.00
    
    Great profit maker. Build a few that are well spaced and offer different 
    colours in each. 
    ______________________________________________________________________________
                                9-N2 - Wonton Soup Stall
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Cost: €300
    Stock cost: €1.50
    Ideal Price: €2.00
    Profit: €0.50
    
    More of the oriental flavor... just adds variety.
    
    ______________________________________________________________________________
                                10-A - Staff Organisation
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    ________
    Handymen
    ŻŻŻŻŻŻŻŻ
    o The best way to organise handymen is to firstly assign 75% of your handymen 
      to specific places that tend to get dirty - ride exits, foodcourts etc. The
      other 25% should be let roam free doing odd jobs.
    
    o It is pointless getting lawns mowed - never assign handymen to this task.
    _________
    Mechanics
    ŻŻŻŻŻŻŻŻŻ
    o Assign handymen to cover 4 or 5 rides that are close to one another. This 
      means ride downtime is minimised.
    
    o You can adjust the frequency of ride checkups in the ride control screen
      on rides that frequently breakdown - this improves mechanic efficency.
    _______________
    Security Gaurds
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    o Assign security gaurds to trouble spots like foodcourts.
    ______________________________________________________________________________
                                     10-B - Queues
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Queues are very important, so here I'll explain the ground rules regarding
    queues.
    __________________________
    Not to Long - Not to Short
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Queues should never be too long, no matter which ride they belong to. This is
    because...
    
    a) guests get fed up and your park rating suffers,
    b) you have to pay extra entertainers to keep them happy,
    c) everyone ends up in a queue for the popular rides and there is thus no one
       left to ride other less popular rides, so they lose money,
    d) since there are fewer people walking around, less money is spent in shops
       and stalls,
    
    Similerly queues should not be too short because...
    
    a) trains/carriages will end up leaving half empty,
    b) paths will suffer from crowding sooner,
    ____________
    Ideal lenght
    ŻŻŻŻŻŻŻŻŻŻŻŻ
    The ideal lenght is approximatly 2 times the max train/carriage load - that is
    about 24 people for most queues.
    _______
    Routing
    ŻŻŻŻŻŻŻ
    Queues should not just be wraped around one another such as...
    
    Start               
    | |_________
    |_________  |
    |  _________|
    |_________  |
            Finish
    
    ...instead they should becarefully routed around the ride, under the track and
    around the theming. This increases the excitement of the ride.
    __________
    Other Tips
    ŻŻŻŻŻŻŻŻŻŻ
    o Use TV Moniters in queues to increase guests anticipation and thus their
      excitement levels. This also reduces complaints of bordem. 2 Moniters is
      enough for any queue.
    
    o Themeing ride queues increases guests general happiess.
    
    o You can choose from a variety of queue types, try various ones to make 
      different rides more interesting.
    ______________________________________________________________________________
                              10-C - Adding Excitment to Rides
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    The best ways to increase your income is to boost your excitement rating, 
    heres how:
    
    o Theme rides - theming boosts guests overall enjoyment of a ride - even trees
      and fences boost excitement ratings.
    
    o Interlock track - if you have more than one track banking and curving around
      another - guests will find the ride much more exciteing.
    
    o Build rides beside one another - riders will gain some excitement from the
      nearby rides.
    
    o Build high, over water and underground - althought it is costly, it boosts 
      the excitement rating by a considerable amount.
    ______________________________________________________________________________
                                       10-D - Q&A
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    The Q&A section is devided up into Technical questions and gereneral ones.
    ____________________
    Technical Questions:
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Q: On my computer when I insert the disc in, a message appears "Please insert
       disc into Drive "D", why?
    A: RTC2 only works in Drive D, and never addational drives such as "E", this
       as far as I know cannot be changed.
    
    Q: What are the system requirements?
    A: OS: Windows 98/Me/XP/2K
       Processor: Intel Pentium II 300 MHz
       Memory: 64 MB (128 recommended)
       Hard Drive Space: 120 MB free drive space (200MB free recommended)
       CDROM drive: 8x Speed (16x recommended)
       Graphics card: DirectX 8.1 Compliant Video Card with 8 MB RAM
       Sound card: DirectX 8.1 Compliant Sound Card
       DirectX version: 8.1 (Included)
    
    Q: While playing RCT2 crashs or sometimes appears poorly coloured, help!
    A: If you do not have at least 120MB of free space while running RCT2, you
       can experience problems like these.
    ________
    General:
    ŻŻŻŻŻŻŻŻ
    Q: When playing the scenario "Six Flags Great Adventure" after getting the
       3,000 required guests, the level does not immediatly finish, why?
    A: In this level guest numbers are only checked at the end of each day, so it
       takes a little longer for the game to self terminate.
    ______________________________________________________________________________
                              10-E - Reader Contributions
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Anything worth saying? Well send it in!
    ______________________________________________________________________________
                                 10-F - Websites/Links
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    http://www.rollercoastertycoon2.com - the offical website.
    http://rct.ogresnet.com - major RCT site with news, downloads...
    http://www.rct-2.com - RCT downloads
    http://www.lott.co.uk/rct.htm - RCT downloads, cheats etc.
    http://www.coasterforce.com/RCT/index.php - Tracks and Downloads.
    ______________________________________________________________________________
                                10-G - Rest in Series
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    The RCT series is constantly expanding across all areas. For more information
    regarding these Roller Coaster Tycoon games check Gamefaqs, or some of the 
    websites/links mentioned earlier in this FAQ. The following are in order of
    release. NB. Expansion packs require the original game to function.
    
    Roller Coaster Tycoon................................PC
    Roller Coaster Tycoon: Added Attractions Pack........PC.........Expansion Pack
    Roller Coaster Tycoon: Corkscrew Follies Expansion...PC.........Expansion Pack
    RollerCoaster Tycoon: Loopy Landscapes...............PC.........Expansion Pack
    Roller Coaster Tycoon 2..............................PC
    Roller Coaster Tycoon 2: Wackey Worlds...............PC.........Expansion Pack
    ______________________________________________________________________________
                               10-H - Cheats/Easter Eggs
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Change the name of a guest...
    
    Andy Hine...........Guest thinks "Nice ride but not as good as the Phoenix"
    Brayshaw............Guest waves
    Chris Sawyer........Guest takes photos of rides
    Damon Hill..........Go-Karts go faster
    David Ellis.........Guest thinks "and here we are on the [rollercoaster 
                        name]"
    Elissa White........Guest loves coasters such as the "Giga Coaster" and 
                        "Impulse Coaster" which are designed by Intamin and 
                        guest thinks "brilliant...it's an Intamin Ride"
    Katie Brayshaw......Guest waves
    Tony Day............Guest get hungry 
    John Wardley........Guest thinks "Wow!"
    John Mace...........Guest pays double ride entrance fee
    Melanie Warn........Guest is happy (park rating increases)
    Michael Schumacher..Go-Karts go even faster
    Mr Bean.............Go-Karts slow down
    Simon Foster........Guest paints pictures of rides
    (source: Cobbled together from various websites including Gamfaqs)
    
    You can have more than one person with the same name by changing the 
    capitalization of various letters. For example Chris Sawyer can be used on 
    another person by making all letters lower or upper case...
    chris sawyer => CHRIS SAWYER.  (source: Bostjan Cigan's FAQ)
    ______________________________________________________________________________
                                  10-I - Park Awards
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    There are many awards available in RCT2, here is a list of them in order of +
    awards and - awards.
    _________
    + Awards:
    ŻŻŻŻŻŻŻŻŻ
    Best Bathroom Facilities Award 
    Best Custom-Designed Rides Award 
    Best Gentle Ride Award
    Best Park Food Award 
    Best Park Restrooms Award 
    Best Staff Award 
    Best Value Park Award 
    Best Water Rides Award 
    Cleanest Footpaths in the Country Award
    Most Beautiful Park Award 
    Most Dazzling Ride Color Schemes Award 
    Park With The Best Roller Coasters Award 
    Safest Park Award 
    Tidiest Park Award
    _________
    - Awards:
    ŻŻŻŻŻŻŻŻŻ
    Most Confusing Park Layout Award 
    Most Disappointing Park Award 
    Most Untidy Park Award 
    Worst Food in the Country Award 
    Worst Park Food Award 
    Worst Scenery in the Country Award
    Worst Value Park Award 
    ______________________________________________________________________________
                           10-J - Term Dictionary/Information
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    __
    A:
    ŻŻ
    Air Time - air time is the amount of time guests feel weightlessness.
    Altitude - is a Ride's height from sea level, it is measured in feet (ft) and 
               meters (m).
    Apex - the point where the chain-lift stops on a rollercoaster, and the track 
           slopes downwards.
    Average Speed - the average speed a ride travels.
    __
    B:
    ŻŻ
    Banking - where ride track starts going at an angle.
    Borrow - money you can get from the bank, but must be repaid with interest.
    __
    C:
    ŻŻ
    Cain-lift - also called pull chain, lifts rollercoaster up upward sloping 
                track.
    Cash - money you have now and can spend.
    Cash-Flow - the amount of money coming in every month after expenses.
    Climate - type of weather a park experiences.
    Company value - value of your company (park value + cash - loans).
    Construction Rights - ability to build over/under land, but not on it.
    __
    D:
    ŻŻ
    Debt - money borrowed from the bank.
    Down-Time - amount of time rides have not been operating.
    __
    E:
    ŻŻ
    Entertainers - staff who entertain guests, principaly in ride queues.
    Entrance fee - The price to enter the park or a particular ride.
    Excitement rating - the excitement rating of a ride is how much excitement 
                        your average guest experiences from a ride.
    Expenditure - money going out (money you spend).
    __
    F:
    ŻŻ
    Finances - your income and expenditure
    __
    G:
    ŻŻ
    Gentle Rides - Rides designed for people seeking a less intense ride.
    Grapes - also called charts, display information visually rather than by word.
    __
    H:
    ŻŻ
    Handymen - staff who do general maintence work of park grounds.
    __
    I:
    ŻŻ
    Income - money coming in (money you make), also known as revenue.
    In-line-twist - rollercoaster section that flings train 360 degrees.
    Interest - additional money repaid to the bank for there services.
    Intensity rating - the intensity rating of a ride is how much intensity
                       your average guest experiences from a ride.
    Inversions - number of complex twists and turns such as in-line-twists were
                 riders are flung upside down.
    __
    L:
    ŻŻ
    Landscaping - adjusting land heights, patterns, theming planting trees etc.
    Loan interest - money you pay for the privilage of having a loan.
    Loans - money you have borrowed to spend on your park.
    __
    M:
    ŻŻ
    Marketing - money you spend on advertising and promoting your park.
    Maximum Speed - this is the top speed a ride can go.
    Mechanics - staff members who are responsible for making sure rides run safely
                and smoothly.
    Music - you can add music to various rides to make them more unique.
    __
    N:
    ŻŻ
    Nauesua Rating - the nauesua rating of a ride is how sick an average guest 
                     feels after riding a particular ride.
    Negative Vertical G's - the negative gravitional force exerted on each guest.
    __
    O:
    ŻŻ
    On-Ride-Photos - rollercoaster section that takes photos of guests riding 
                     train - guests later have the option of buying the photo.
    __
    P:
    ŻŻ
    Patrol - this is a function that lets certain staff members look after 
             particular parts of a park.
    Park value - value of your parks land + rides + theming + shops + stalls.
    Park rating - combined feeling of all guests towards your park.
    Popularity - percentage of people who decide to ride a particular ride after
                 thinking about it.
    Positive Vertical G's - the gravitional force exerted on each guest
    Profit - money you earn, income - expenenses.
    __
    Q:
    ŻŻ
    Queue lenght - lenght of queue at a particular ride.
    Queues - a queue is a special type of path that guests use to enter rides.
    Queue time - lenght of time a guest must queue to enter a ride.
    __
    R:
    ŻŻ
    Reliabilty - percentage of time a ride is operating.
    Repay- giving money back that you have borrowed.
    Research - money you spend on developing new rides, also know as R&D.
    Ride lenght - the lenght in meters or feet of ride track.
    Ride time - how long a ride lasts.
    Running costs - cost of keeping a ride operational.
    __
    S:
    ŻŻ
    Sacking - this is were you fire a staff member
    Satisfaction - how much people liked a ride after riding it.
    Scenario - another word for an individual level.
    Security gaurds - staff who stop people from damaging park property.
    Station platform - the area guests board and exit ride trains/cars.
    Stock - items each shop must buy for re-sale to guests.
    __
    T:
    ŻŻ
    Thrill rides - rides that deliver fairly high ratings - but not quite as high
                   as rollercoasters.
    Transport rides - rides whose primary aim is not to make money or deliver 
                      excitement, but to move guests from a to b.
    __
    W:
    ŻŻ
    Water Rides - rides based principaly around water.
    
    ______________________________________________________________________________
                              11-A - Balancing your Budget
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Some tips for balancing your budget:
    
    o If the interest rate is high, try to pay back your loan earlier - if it is 
      low, don't worry about paying it back.
    
    o Cut your research budget if your tight on money - you can do with what you 
      already have.
    
    o Fire entertainers and security gaurds - you still need handymen and 
      mechanics.
    
    o Check all ride ticket prices equal the excitement ratings
    ______________________________________________________________________________
                                   11-B - Currencys
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    As I promised at the start, heres a currency conversion table.
     _____________ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___
    |             | € | £ | $ | FF| DM| K | G | L |  |Pts|
    |-------------|---|---|---|---|---|---|---|---|---|---|
    |Euro (€)     |  1|  1|  1|  1|  1|  1|  1|100|100|100|
    |Pound (£)    |  1|  1|  1|  1|  1|  1|  1|100|100|100|
    |Dollar ($)   |  1|  1|  1|  1|  1|  1|  1|100|100|100|
    |Francs (FF)  |  1|  1|  1|  1|  1|  1|  1|100|100|100|
    |D. Marks (DM)|  1|  1|  1|  1|  1|  1|  1|100|100|100|
    |Krona (K)    |  1|  1|  1|  1|  1|  1|  1|100|100|100|
    |Guilder (G)  |  1|  1|  1|  1|  1|  1|  1|100|100|100|
    |Lira (L)     |100|100|100|100|100|100|100|  1|  1|  1|
    |Yen ()      |100|100|100|100|100|100|100|  1|  1|  1|
    |Pesatas (Pts)|100|100|100|100|100|100|100|  1|  1|  1|
    |_____________|___|___|___|___|___|___|___|___|___|___|
    ______________________________________________________________________________
                                 12-A Version History
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    Version: 1.0
    Completion: 35%
    Date/Time: 4th Jan 2003
    
     -  Started FAQ, but quite basic still.
    
    Version: FINAL
    Completion: 100%
    Date/Time: 4th July 2004
    
     - Pretty much finished - maybe there will be a few small updates later - but 
       main content is finished.
    ______________________________________________________________________________
                                 12-B Full Copyright
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
     This FAQ is copyright CGorman (Ciarán Gorman) 2002, 2003, 2004. If you want 
    this FAQ, just steal it and I will sue you, because it is to be exclusively 
    hosted through the internet by Gamefaqs, and no other website or affliation, 
    except of course any website I may own. Use of this FAQ through other mediums
    such as print, is available through nogotiation. WARNING: This guide may 
    contain traces of nuts!... I mean spoilers.
    ______________________________________________________________________________
                                 12-C Contact Notice
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
     If you want to contact me you can email me at cgorman03@hotmail.com - but 
    please don't send questions, I get enough as it is and this or other FAQ's 
    cover pretty much all there is to ask.
    ______________________________________________________________________________
                                    12-D Credits
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
    CJayC for Gamefaqs, 
    Myself for writing this guide,
    Bostjan Cigan for the cheat hint,
    ______________________________________________________________________________
                                     12-E Outro
    ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
     Hope you found this guide useful, thanks for reading and good luck. You can 
    visit my Gamefaqs contributor page at...
    
    http://www.gamefaqs.com/features/recognition/15853.html
    
    ...to see my other guides. - CGorman

    FAQ Display Options: Printable Version